Fortress Building Products OASIS User manual

OASIS COMPOSITE FENCING
INSTALLATION INSTRUCTIONS

2
FENCING INSTALLATION: OASIS
TABLE OF CONTENTS
English
Fence Layout
Care & Maintenance/ Warranty

FENCING INSTALLATION: OASIS
3
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
Before You Begin
boards
Adhere To The Following Storage Guidelines:

4
FENCING INSTALLATION: OASIS
Required Tools
Tape
Measurer
Tool
Bit
Pencil
Pliers
OASIS FENCE MATERIALS
Post
(Recommended Post)
or
Air
Miter
Cords
Table
Circular
Brush

FENCING INSTALLATION: OASIS
5
Rail & Boards
Bracket, Screw & Nail
8’ Square Board
6’ Dog Ear Board
Rail with Z-Channel
Top Cap
Standard Bracket For 2-3/8”
[60mm] Round Galvanized Pipe
Hex Head Self-drilling Screw
Note:
• FDOES NOT

6
FENCING INSTALLATION: OASIS
FENCE LAYOUT
Step 1: Sketch Layout of Fence Perimeter
Posts should be set at a maximum
Post
Post
Post
Post
Post
PostPost
Post
Post
Post
Gate
Post
Gate
Post
Gate
Post
Gate
Post
Walk
Gate
Walk
Gate House
Post
Post
Top View

FENCING INSTALLATION: OASIS
7

8
FENCING INSTALLATION: OASIS
Step 2: Use Stakes & Guide String to Create Perimeter Then Mark
Maximum on center post
Tip:
• How To Square Perimeter:
XXX
X
X
X
XXXX
X
XX
X
XX
Stake
Start 2
Start 4Start 3
Stake
Start 1 House
Post Hole
Mark
Guide
String
Top View

FENCING INSTALLATION: OASIS
9
House
Guide
String
point
Stake
Top View
(NOT TO SCALE)
Step 3: Dig Post Holes
Be sure to
Note:
Consult local code
Side View
Consult local

10
FENCING INSTALLATION: OASIS
Post hole depth
Post
POST INSTALLATION
Step 1: Set Posts into Post Holes
As
of Crushed
Step 2: Pour Concrete
BEFORE POURING CONCRETE, CONFIRM THE POSTS ARE

FENCING INSTALLATION: OASIS
11
Tip:
• As the concrete cures
Concrete
Post
Consult local

12
FENCING INSTALLATION: OASIS
BRACKET INSTALLATION
Step 1: Install Brackets onto Corner Posts
NOT
As
the to secure each post bracket onto
post bracket bolt to secure each bracket onto the
Tip:
•
• U
8’ [2438mm] Post
Post
Post

FENCING INSTALLATION: OASIS
13
Step 2:
post brackets
Tip:
•
Front View
Front View
bracket onto post
Ground
Surface

14
FENCING INSTALLATION: OASIS
Front View
Corner Post
Corner Post
Run
across top face of
each bracket
Front View
Corner Post
Post

FENCING INSTALLATION: OASIS
15
RAIL INSTALLATION
Step 1: Cut Rail to Desired Length (If Required)
Note:
Step 2: Install Rails with Z Channel
post bracket
the
The post bracket
Tip:
Front View

16
FENCING INSTALLATION: OASIS
Front View
Post
Rails with Z
Channel
Centerline of rail
and Bracket
Top View
Post
Bracket
second fence run

FENCING INSTALLATION: OASIS
17
Step 3: Cut Posts To Desired Height (If Installing Top Cap)
Tip:
Front View

18
FENCING INSTALLATION: OASIS
BOARD INSTALLATION: SIDE BY SIDE
Step 1: Install Boards
each
As
Tip:
•
end & top
face of post
Front View
Centerline

FENCING INSTALLATION: OASIS
19
Front View
in rail
Side View
First
fence run
fence run

20
FENCING INSTALLATION: OASIS
BOARD INSTALLATION: BOARD ON BOARD
Step 1: Install Base Layer Boards
each
a
Tip:
•
•
Table of contents
Other Fortress Building Products Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Betafence
Betafence Bekazur 2D Installation guidelines

Dolle
Dolle HELSINKI Assembly instruction

Horizont
Horizont SECURA ANIMAL Instruction manual & safety hints

Imperial
Imperial Kool-Ray PRO FORMANCE Assembly instructions

Zippity
Zippity ZP19001 Assembly instructions

Dura Trel
Dura Trel Camelot Trellis Assembly instructions