Fortress Building Products Pro Series User manual

1
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
INSTALLATION INSTRUCTIONS

2
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
English
Introducon.........................................................................3
Installaon...........................................................................5
Care & Maintenance/ Warranty...........................................8
TABLE OF CONTENTS

3
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
INTRODUCTION
READ INSTRUCTIONS COMPLETELY BEFORE
STARTING INSTALLATION
It is the responsibility of the installer to meet all code and
safety requirements, and to obtain all required building
permits.Thefencinginstallershoulddetermineand
implementappropriateinstallaontechniquesfor
eachinstallaonsituaon.FortressBuildingProductsand
its distributors shall not be held liable for improper or
unsafeinstallaons.
Before You Begin
ContactyourlocalBuildingCodeDepartmentforrequired
permitsandlawsregardingyourfenceproject.
Ifapplicable,alsocontactyourHomeOwnersAssociaon
forrulesandregulaonsregardingfenceinstallaonsin
yourneighborhood.
Call811beforeyoudigpostholestolocateandidenfy
anyburiedulies.
Note
• WhencungFortressFencing,itisveryimportantto
complete the following at cut points:
• Removeallmetalshavingsfromthecutarea.
• Fileanysharpedgeslebycung.Thoroughlywipeand
removeanylings,grime,ordirt.
• ApplytwocoatsofFortresszincbasedtouch-uppaintto
thecutarea.Iftouchupisatrailends,allowpainttodry
beforeconnecngbrackettopost.
• Besuretoremoveanymetalshavingsfromthesurfaceof
Fence.
Torx Safety Tips
• Alwaysusethelowestspeedsengondrill.
• Toreducechanceofbitbreakage,startghteningwithdrill
onlowtorquesengandworkupunlscrewissecured.

4
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
1
2
3
6
7
8
9
5
4
PRO-SERIES: THROUGH BOLT SLIDE LATCH
Required Tools
DrillPencil
DrillBit:
7/16” [11mm]
Goggles C-Clamps
Component List
1.SlideLatch-BoltPlate(x1)
2.SingleSwingReceiver(x1)
3.SlideLatch(x1)
4.SlideLatchHandle(x1)
5.Bolt(x4)
6.Washer(x4)
7.Nut(x4)
8.SlideLatchHandleFlatWasher(x1)
9. SlideLatchHandle10mmBolt(x1)
Rubber
Mallet
SpringPunch
File
Touch-Up
Paint
WrenchorSocket:
3/8”,9/16”[10mm,14mm]
Note:
• Minimal gate upright spacing between the SlideLatch-BoltPlateand
SingleSwingReceiveris1-1/2”[38mm].
Hacksaw ThreadLocker
SpeedSquare

5
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
THROUGH BOLT SLIDE LATCH INSTALLATION
Step 1: Assemble Handle to Slide Latch
1. AssembleTheSlideLatchHandletoSlideLatchwith
supplied10mmBoltandFlatWasher.AsshowninFig.1.
Useofathreadlockerisrecommended.
Fig.1
SlideLatch
Handle
PadlockHole
SlideLatch
FlatWasher
10mmBolt
Step 2: MarkBoltHoleLocaonsonGateUprights
1. DeterminethedesiredplacementoftheThroughBoltSlide
Latchonthegate uprights.
2. PosiontheSlideLatchAssemblyontothegate upright
thenuseC-Clampstotemporarilyholdthelatchinplace.
AsshowninFig.2.
3. PosiontheSingleSwingReceiverontotheoppositegate
upright or post.UseaSpeedSquaretoalignthetopfaces
ofthereceiverandlatch.Thiswillallowtheslidelatchto
beeasilyinsertedandremovedintothereceiver.
4. UseaC-Clamptotemporarilyholdthereceiverinplace.As
showninFig.3.
5. Only 2 bolts are required for each latchandreceiver.
Determine the appropriate bolt holes required for your
installaonbasedonyourgateuprightsize. As shown in
Fig.4.
6. Usingapencil,markthedesiredboltholelocaonsonto
bothgateuprights.AsshowninFig.5.
7. RemovetheC-Clamps,SpeedSquare,SlideLatchassembly
andSingleSwingReceiver.

6
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
Step 3: Pre-drill Bolt Holes on Gate Uprights
1. UseaSpringPunchtomarkthecenteroftheboltholes.
2. Usinga7/16”[11mm]DrillBit,drillcompletelythrough
bothgateuprightsalongtheboltholemarks(4places).As
showninFig.6.
3. Removeallmetalshavingsfromgateuprightsbeforethe
SlideLatchAssemblyandSingleSwingReceiverare
screwedontothegateuprightstopreventcorrosion.
4. Usingapieceofcardboardasamask.Applythe2coatsof
FortressZincBasedTouch-UpPaint.AsshowninFig.7.
Allowtodrybeforeapplyingsecondcoat.
FRONT VIEW
2”[51mm]
GateUpright
3”[76mm]
GateUpright
Fig.2 Fig.3
Fig.4 Fig.5
Fig.6 Fig.7
SlideLatch
Assembly clamped
ontoGateUpright
SingleSwingReceiver
clamped onto second
GateUprightorpost
withtopfaceush
withtopfaceofSlide
LatchAssembly

7
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
Step 4: Mount Slide Latch Assembly & Single Swing Receiver onto
Gate Uprights
1. PosiontheSlideLatchAssemblyandSingleSwing
Receiverongateuprightsoverthepre-drilledboltholes.
2. Conrmholelocaonsarecorrectandalignwithbolthole
onthelatchandreceiver.Adjustifrequired.
3. Insertboltsandwashersthroughboltholes,thenfasten
nutsusinga9/16”[14mm]WrenchorSocket.Asshownin
Fig.8&9.
4. Ifrequired,cutexposedboltendsushwithoutsideface
ofnutsusingahacksaw.AsshowninFig.10.
5. Fileanysharpedges.
6. Apply2coatsofFortressZincBasedTouch-UpPainttocut
boltends.AsshowninFig.11.Allow to dry before applying
secondcoat.
Fig.8 Fig.9
Fig.10 Fig.11
Cut exposed bolt
endsushwith
outside face nuts

8
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
CARE & MAINTENANCE
Care And Maintenance Of Fortress Building Products
Powder-Coated Products And Surfaces:
• ImmediatelyaerinstallaonofyourFortressBuilding
Products,cleanpowder-coatedproductsandsurfaceswith
asoluonofwarmwaterandnon-abrasive,pHneutral
detergentsoluon.Surfacesshouldbethoroughlyrinsedaer
cleaningtoremoveallresidues.Allsurfacesshouldbecleaned
usingasoclothorsponge.
• Ensureconstruconmaterialssuchasconcrete,plaster,and
paintsplashesareremovedimmediatelybeforetheyhavea
chancetodry.Failuretoremovethesematerialsmaycause
damagetothepowder-coatedsurfaces.
• Thefrequencyofcleaningdependsinpartonthestandard
o f a p p e a r a n c e a n d a l s o t h e r e q u i r e m e n t s t o r e m o v e d e p o s i t s
thatmaycausedamagetothepowdercoangaer
prolongedexposure.Fortressrecommendscleaninginthreeto
fourmonthlyintervals.
• WARNING: Do not use strong solvents such as thinners, or
soluonscontainingchlorinatedhydrocarbons,esters,or
ketones.Abrasivecleanersorcungcompoundsshouldnot
beused.
WARRANTY
Toobtainandreviewacopyofthewarranty,pleasegoto:
hps://Fortressbp.com/warranes. You can also contact:
(844)909-1999orwriteto:FortressBuildingProductsWarranty,
1720N1stSt,Garland,TX75040toobtainacopyofthewarranty.

9
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH

10
FENCING INSTALLATION: PRO-SERIES THROUGH BOLT SLIDE LATCH
JOIN THE REVOLUTION.
FortressBP.com | 866.323.4766
Unless otherwise noted, all proprietary names are trademarks of Fortress Iron, LP. All rights reserved.
3/2022
© 2020 Fortress Building Products.
Table of contents
Other Fortress Building Products Fencing & Gate manuals
Popular Fencing & Gate manuals by other brands

Betafence
Betafence Bekazur 2D Installation guidelines

Dolle
Dolle HELSINKI Assembly instruction

Horizont
Horizont SECURA ANIMAL Instruction manual & safety hints

Imperial
Imperial Kool-Ray PRO FORMANCE Assembly instructions

Zippity
Zippity ZP19001 Assembly instructions

Dura Trel
Dura Trel Camelot Trellis Assembly instructions