
Table of Contents
ii M2280322_en | Installation instructions Pellet boiler PT4e 200-250 (ESP)
1 General ......................................................................................................................................................... 4
1.1 About this manual ................................................................................................................................. 4
2 Safety............................................................................................................................................................ 5
2.1 Hazard levels of warnings ..................................................................................................................... 5
2.2 Qualification of assembly staff .............................................................................................................. 6
2.3 Personal protective equipment for assembly staff ................................................................................ 6
3 Design Information...................................................................................................................................... 7
3.1 Overview of standards .......................................................................................................................... 7
3.1.1 General standards for heating systems ..................................................................................... 7
3.1.2 Standards for structural and safety devices............................................................................... 7
3.1.3 Standards for heating water....................................................................................................... 7
3.1.4 Regulations and standards for permitted fuels .......................................................................... 8
3.2 Installation and approval ....................................................................................................................... 8
3.3 Installation site ...................................................................................................................................... 8
3.4 Chimney connection/chimney system................................................................................................... 9
3.4.1 Connection line to the chimney.................................................................................................. 10
3.4.2 Measuring port ........................................................................................................................... 11
3.4.3 Draught limiter............................................................................................................................ 11
3.4.4 Explosion flap............................................................................................................................. 11
3.5 Combustion air ...................................................................................................................................... 12
3.5.1 Combustion air supply at the installation room .......................................................................... 12
3.5.2 Simultaneous operation with other air-drawing systems............................................................ 13
3.6 Domestic hot water ............................................................................................................................... 14
3.7 Pressure maintenance systems ............................................................................................................ 15
3.8 Storage tank.......................................................................................................................................... 16
3.9 Return temperature control ................................................................................................................... 16
3.10 Boiler ventilation.................................................................................................................................... 16
4 Technology .................................................................................................................................................. 17
4.1 Dimensions of the PT4e 200-250 / PT4e 200-250 ESP........................................................................ 17
4.2 Components and connections............................................................................................................... 19
4.3 External suction module........................................................................................................................ 20
4.4 Technical data....................................................................................................................................... 21
4.4.1 PT4e 200 - 250 .......................................................................................................................... 21
4.4.2 PT4e 200 – 250 ESP ................................................................................................................. 22
4.4.3 Boiler data for planning the flue gas system .............................................................................. 24
4.4.4 Data for planning a backup power supply.................................................................................. 24
5 Transport and storage ................................................................................................................................ 25
5.1 Delivery configuration............................................................................................................................ 25
5.2 Temporary storage................................................................................................................................ 25
5.3 Positioning............................................................................................................................................. 26
5.4 Dismantling for location where positioning is difficult ............................................................................ 27
5.5 Positioning at the installation site .......................................................................................................... 30
5.5.1 Remove cardboard and transport frame .................................................................................... 30
5.5.2 Operating and maintenance areas of the equipment................................................................. 31
6 Assembly ..................................................................................................................................................... 32
6.1 Assembly overview ............................................................................................................................... 32
6.2 Accessories supplied ............................................................................................................................ 32
6.3 Installing the boiler ................................................................................................................................ 33