
Table of contents
M2440122_en | Installation instructions Pellet condensing boiler PE1e Pellet (ESP) iii
5.4.1 Remove boiler from pallet .......................................................................................................... 30
5.4.2 Operating and maintenance areas of the equipment................................................................. 32
6 Assembly ..................................................................................................................................................... 33
6.1 Tools required ....................................................................................................................................... 33
6.2 Assembly overview ............................................................................................................................... 33
6.3 Accessories supplied ............................................................................................................................ 34
6.4 Installing the boiler ................................................................................................................................ 34
6.4.1 Levelling the boiler ..................................................................................................................... 34
6.4.2 Install balancing valve (optional)................................................................................................ 35
6.4.3 Control the return temperature control....................................................................................... 35
6.5 Installing the discharge system ............................................................................................................. 37
6.5.1 Installing the external suction module........................................................................................ 37
6.5.2 Connect the suction hoses to the boiler..................................................................................... 39
6.5.3 Assembly information for hose lines .......................................................................................... 40
6.6 Installing the condensation drain........................................................................................................... 42
6.7 Connect the connection line to the chimney ......................................................................................... 43
6.8 Hydraulic connection............................................................................................................................. 44
6.8.1 Connect the water supply to the boiler....................................................................................... 44
6.9 Electrical connection ............................................................................................................................. 45
6.9.1 Board overview .......................................................................................................................... 46
6.9.2 Mains connection ....................................................................................................................... 46
6.9.3 External suction module............................................................................................................. 47
6.9.4 Potential equalisation................................................................................................................. 47
6.10 Set condensing boiler heat exchanger in the software ......................................................................... 48
6.10.1 Condenser ................................................................................................................................. 48
6.11 Final installation steps........................................................................................................................... 49
6.11.1 Install the brackets for accessories............................................................................................ 49
6.11.2 Insulate the connection line ....................................................................................................... 50
6.11.3 Stick on an additional identification plate (on PE1e Pellet ESP)................................................ 50
7 Start-up......................................................................................................................................................... 51
7.1 Before commissioning / configuring the boiler ...................................................................................... 51
7.2 Initial startup.......................................................................................................................................... 52
7.2.1 Permitted fuels ........................................................................................................................... 52
7.2.2 Non-permitted fuels.................................................................................................................... 52
7.2.3 Heating up for the first time........................................................................................................ 52
8 Decommissioning ....................................................................................................................................... 53
8.1 Mothballing............................................................................................................................................ 53
8.2 Disassembly.......................................................................................................................................... 53
8.3 Disposal ................................................................................................................................................ 53
9 Appendix ...................................................................................................................................................... 54
9.1 Dismantling for location where positioning is difficult ............................................................................ 54
9.1.1 Tools required ............................................................................................................................ 54
9.1.2 Overview of disassembly steps.................................................................................................. 55
9.1.3 Dismantling the cardboard box and pallet.................................................................................. 57
9.1.4 Dismantling the cladding and controller box .............................................................................. 58
9.1.5 Removing the pellet container and stoker.................................................................................. 67
9.1.6 Removing the condensing boiler heat exchanger...................................................................... 68
9.1.7 Removing the ash removal screws and front boiler floor ........................................................... 69
9.1.8 Removing the boiler floor ........................................................................................................... 71
9.1.9 Disassembly of the WOS system in order to reduce weight (optional) ...................................... 72
9.1.10 Disassembly of the firebricks in order to reduce weight (optional)............................................. 74