Installation Guide / Guide d’installation
FRYBROSP3678CP
Studs are required as support for tracks
[1A] Ensure that all raw plumbing has been
prepared before installing the shower.
[1B] Ensure that the base is level by adjusting.
[1C] Once in place, the inner surface of the lip
of the base must be set flush with drywall.
Before continuing the installation:
Ensure proper installation of the drain and test for leaks
prior to installing the remaining pieces of shower unit.
Verify that water on the base is draining correctly.
Verify all pipe connections to ensure no leakage occurs.
Tile your wall (follow tile installation instruction) and allow
grout to dry completely for 24 hours before installing your
shower door.
The thickness of cement and tiles cannot exceed 25mm.
Drywall is flush
with lip of the base
Base lip
Tiles are
over the lip
of the base
Silicone
<25mm
Attention: A new construction, the shower base
should be installed before installing the tiles.