OPERATING & SAFETY INSTRUCTIONS
ELCOSEAL® LAY-DOWN EQUIPMENT VISUAL INSPECTION
CONDITION REPORT
A copy of this document must be sent with the hire equipment - original to stay at the branch.
VISUAL INSPECTION CONDITION (to be completed by Geofabrics’ sta when checking out and checking in)
Customer IFS Order
Number
Dispatch/receipt Out date: / / In date: / /
Branch locaon
Project
Name
Expected return date
Item Number Number of
items
Item name Checked out Checked in Serial Number Comments
1 1 Bar, frame and chain
assembly
This equipment has received an in-service inspecon and was found to have no obvious defects.
CHECKED OUT BY CHECKED IN BY
Name: Name:
Signature: Signature:
Date : ____/_____/____ Date : ____/_____/____
Comments/inspecon results:
Dear Customer
• On receipt of this equipment, please check all equipment has been received, ensure your site sta read
and understand the operang, maintenance and safety informaon, and use the equipment in a safe
manner.
• You are responsible for the safe operaon of the equipment and the safety of your sta.
• At the conclusion of the use of the equipment, please clean the equipment, repack it for transportaon
and return it to Geofabrics.
• Please advise if there are any missing parts. All equipment usage must be in terms of Geofabrics’
Equipment Hire Agreement. You will be charged for any damaged or missing components.

2
ELCOSEAL® LAY-DOWN EQUIPMENT
- OPERATING & SAFETY INSTRUCTIONS
WARNING !
• Any alteraons to this hire/loan equipment may prove dangerous to the operator and will be in breach of
the Equipment Hire Agreement.
• Service must only be performed by an authorised Geofabrics service organisaon or representave.
• Please contact your nearest Geofabrics branch for return of this equipment or servicing if it is found to be
faulty.
• All hire related documentaon, operang & safety instrucons are available on the company website
(www.geofabrics.com.au).
GEOFABRICS.COM.AU
QUALITY - SUPPORT - EXPERTISE

3
ELCOSEAL® LAY-DOWN EQUIPMENT - OPERATOR’S MANUAL
The ELCOSEAL® Lay-down Equipment is designed to be used as an aachment for earthmoving and other
equipment to facilitate the installaon of ELCOSEAL® Geosynthec Clay liners in suitable locaons.
Pre-operaonal consideraons:
• Before operang the ELCOSEAL® Lay-down equipment, it is important that you read and understand
the maintenance and safety precauons outlined below and in the Equipment Hire Agreement (General
Safety).
• Contact your nearest Geofabrics branch if you do not understand any of the instrucons in this
document.
• To operate the ELCOSEAL® Lay-down equipment, operators must be in good physical and mental
condion.
Safety Precauons and Working Techniques:
• A Safe Work Method Statement (SWMS) should be prepared by the user of the ELCOSEAL® Lay-Down
equipment for each work site.
• Because the ELCOSEAL® Lay-down equipment is suspended/slung from excavators, cranes and other
pieces of mobile plant, special safety precauons must be observed to reduce the risk of people being
hit/struck by the mobile apparatus.
• Establish an exclusion zone of at least three metres around the equipment when it is in moon.
• Do not use the ELCOSEAL® Lay-down Equipment for any applicaon other than its intended purpose.
• Do not abuse the ELCOSEAL® Lay-down Equipment in any way which may result in personal injury and/
or damage to the equipment.
• Check the condion of the ELCOSEAL® Lay-down Equipment (including D shackles and chains) before
each use for any damage. If the behaviour of the ELCOSEAL® Lay-down Equipment, changes check it
immediately and return it to Geofabrics for service if necessary.
• Never modify the equipment in any way.
Site Condions:
• The ELCOSEAL® Lay-down Equipment is designed for the applicaon of ELCOSEAL® geosynthec clay
liners in suitable applicaons.
• The ELCOSEAL® Lay-down Equipment should not be operated in condions which will endanger the
operator or other site personnel.
• The ELCOSEAL® Lay-down Equipment should be used in accordance with the ELCOSEAL® Installaon
Guidelines and/or project specic instrucons.
GEOFABRICS.COM.AU
QUALITY - SUPPORT - EXPERTISE

4
USING THE ELCOSEAL lay-down equipment
Operaon:
Sequence of Basic Job Steps Hazards Controls/Recommended Safe Work
Procedure
1
Ensure all liing equipment is in sound
order and the chains are not twisted,
are of equal length and spacing on the
spreader beam.
Uneven liing of the roll. Ensure chains are free and equal.
2Shackle spreader bar assembly onto
machine.
Incorrectly aached to plant/
equipment. Check shackles before liing.
3 Grease pole with WD40 or similar. Careful handling of greasy pole. Personnel to wear gloves
with extra grip.
4Insert Pole manually into central core
of ELCOSEAL® roll.
Don’t look down core from other
end. Don’t use machinery to force
pole through core.
Keep away unl pole protrudes.
5
Posion spreader beam over, or
preferably grounded alongside the roll
to be lied.
Wind or machine movement causing
the suspended frame to swing
around uncontrollably.
If roll needs to be suspended, then
ensure stability using guide ropes.
6Aach end collars onto pole and
ghten locking nuts.
Not adequately ghtening locking
nuts. Check nuts.
7
Check chain aachment posion
(eyelet) on frame to ensure chains
hang vercally when roll is suspended.
Chains angle outward (at top of
chain) tending to pull collars o the
end of the pole.
Check each roll as the core widths
(and hence posion of the collar)
may vary slightly from roll to roll.
8 Raise machine arm.
Liing too fast/tangle chains Raise in a control manner with no
personnel to go under lied roll.
Uncontrolled dispensing of
ELCOSEAL®.
Do not cut tape (around roll
diameter) and start dispensing unl
roll is in posion and grounded or in
a stable posion over level.
9Move roll into start posion. Roll/Frame jerking and swinging –
knocking someone over.
Keep personnel clear or use guide
ropes so personnel can minimise roll
swinging without standing beneath
or near the suspended roll.
10 Place roll in posion. Lowering onto personnel. Roll must be posioned and
grounded.
11
Unroll at no faster than walking pace
by moving the plant in the required
direcon. Avoid taking machinery over
previously deployed GCL.
Sliding of dispensed material across
the subgrade and ‘up-ending’
personnel following behind on
dispensed material.
Maintain exclusion zone.
Do not aempt to pull ELCOSEAL®
o the roll by hand as it is very
heavy.
Use equipment where possible.
12
Once roll is empty, remove from pole
from core by loosening collar. Pole
can remain in situ.
Removing pole with machine. Manual operaon only.
GEOFABRICS.COM.AU
QUALITY - SUPPORT - EXPERTISE
GEOFABRICS® is a registered trade mark of Geofabrics Australasia Pty Ltd.
SD 4 - 11/12
MELBOURNE SYDNEY NEWCASTLE COFFS HARBOUR PERTH ADELAIDE
(03) 8586 9111 (02) 8785 8800 (02) 4950 5845 (02) 6653 5706 (08) 9249 5411 (08) 8162 5855
Fax: (03) 8586 9186 Fax: (02) 9821 3670 Fax: (02) 4950 5895 Fax: (02) 6653 5706 Fax: (08) 9249 5447 Fax: (08) 8162 5755
HOBART BRISBANE TOWNSVILLE BUNDABERG GOLD COAST DARWIN
(03) 6273 0511 (07) 3279 1588 (07) 4774 8222 (07) 4155 9968 (07) 5594 8600 0407 523 669