
1. Power the Supervisor first, by
moving the battery selector
switch to ALKALINE or
LITHIUM, depending on the
type of batteries installed
(The green LED on the side of
the unit will flash twice,
indicating it has power)
2. Power the Node in the same
manner as the Supervisor
Power the Devices