6 MACHINE UNPACKING AND INSTALLATION
ATTENTION: The unit must be installed, opened and repaired by fully qualified technicians only.
6.1 UNPACKING
Find the most suitable place where to put the machine, then remove the packaging. Make sure that the machine has not been
damaged during the transport and the storage.
The packaging material does not require any special precautions for its disposal, for it is not dangerous or polluting at all. Please
refer to the local regulations for its disposal.
6.2 MACHINE INSTALLATION
The machine has not to be anchored to the floor. For a correct use and operation, as well as for an easy maintenance, leave
enough free space around the machine.
Do not place the machine in dangerous and/or explosive/inflammable places.
6.3 ELECTRICAL WIRING
The electrical wiring must be carried out as indicated in the drawing. Check that the supply voltage and the frequency
correspond to those indicated on the rating plate The feeding socket and the extension cable must suit the machine absorption
and comply to the current regulations. It is advisable to install a switch with fuses or a magnetothermal one.
ATTENTION: After having carried out all the electrical connections, make sure that the cables are protected
against any possible hits and are suitably fixed and isolated.
7 INSTUCTIONS FOR USE
7.1 PUTTING INTO OPERATION
• The whole unit can be used, opened and repaired by qualified technicians only.
• It is forbidden to use the machine if flooded by liquids or in particularly aggressive or explosive/inflammable places.
• Do not ignore the dangers for the operator’s health and follow the hygienic and safety regulations.
• Check that the electrical wiring is carried out correctly according to the current regulations, and that the fuse blocks are
closed and complete of fuses.
• Verify if the machine is intact.
• Place the boiler along with the steam iron on the relevant rest beside the ironing board.
• Unscrew the cap, letting out any possible air remnants inside the boiler and fill the tank of the Beta 3 with 1.5 lt. or with
3,8 lt. regarding Beta 3-L4 of drinking water (possibly warm, without adding any other fluids; do not use purified water
or softeners), by means of a funnel, paying attention to not let it run over.
• Connect the plug of the Beta 3 and of the T.P.A. to the relevant sockets.
• Place the pedals near the working place.
• Once this operation has been carried out, the machine is ready for use.
7.2 USE
• Verify the water level inside the boiler tank. If necessary, carry out the above mentioned steps.
• It is possible to iron even without having to fill the boiler completely, as with 1 lt. the steam generator has a working
range of about 1 ÷ 2 hours. In order to check the water volume inside the boiler, just insert the relevant level control rod
inside the boiler, by putting one finger on the upper hole upon its pulling out.
• Turn he main switch (of the ironing board) to “I”. The pilot light will go on, confirming that the table is now connected to
the power supply.
• Turn the boiler switch of the steam generator on. The pilot light will go on, confirming that the steam generator is now
connected to the power supply. Prior to this operation, it is advisable to set the iron knob on the “cotton” position,
indicated by the symbol “ °°° ”
• Wait a few minutes until the ironing board has reached the required temperature.
• Wait until the central pilot light of the boiler turns on, indicating “boiler under pressure” (approx. 15/20 minutes).
• The steam iron is now ready for use.
• By means of the relevant pedal, activate the vacuum function, both when the garments are to be placed on the ironing
board, in order to simplify a uniform positioning, and when the garments are steamed-up, thus eliminating any excess
steam off the clothes.
• At the end of the ironing operation, it is advisable to leave the table open to dry and to let the main switch turned on for
a few minutes, in order to remove any possible condensation remnants, formed during the ironing process.
• At the end of the work and once the drying process of the board is completed (optional), turn off the boiler and the
board by means of the relevant buttons.
• Disconnect the plug from the power supply and wait until both board and iron are completely cooled down before
closing the table and store it in a closed place.
N.B.: Do not unscrew the cap in order to exhaust the steam at the end of the ironing, never ever turn the steam generator
upside down, in order to pour out the water remnants inside.
7.3 HOW TO REFILL THE TANK WITH WATER
• If during the ironing process the steam output stops and the water warning light of the boiler remains turned on, it
means that there is not enough water inside the boiler.
• Switch off the boiler by means of the relevant switch.