2
4.2 Attach mounting plate to wall ........................................................................................45
4.3 Drill wall hole for connective piping .............................................................................46
4.4 Prepare refrigerant piping ..............................................................................................47
4.5 Connect drain hose.........................................................................................................48
4.6 Wrap piping and cables..................................................................................................48
4.7 Mount indoor unit ..........................................................................................................49
5. Installation of cassette unit.......................................................................................................50
5.1 Space required for installation .......................................................................................50
5.2 Installation......................................................................................................................50
5.3 Panel installation............................................................................................................51
6. Installation of ducted unit ........................................................................................................53
6.1 Installation of main body ...............................................................................................53
6.2 Installation Method of Lifting Bolt................................................................................53
6.3 Adjustment of air return box ..........................................................................................54
6.4 Air Intake Panel of Air Return Box................................................................................54
7. Installation of console..............................................................................................................55
7.1 Space required for installation .......................................................................................55
7.2 Installation of main body ...............................................................................................55
8. Refrigerant pipe connection.....................................................................................................57
8.1 Flaring work...................................................................................................................57
8.2 Tightening Connection...................................................................................................58
8.3 Piping length and height difference ...............................................................................58
8.4 Connection pipe diameter ..............................................................................................59
9. Wiring connection....................................................................................................................60
9.1 Electrical safety regulations for the initial installation ..................................................60
9.2 Wiring connection..........................................................................................................61
10. Air purging .............................................................................................................................62
11. Safety and leakage check .......................................................................................................64
11.1 Electrical safety check..................................................................................................64
11.2 Gas leak check .............................................................................................................65
12. Water drainage .......................................................................................................................65
13. Insulation work ......................................................................................................................66
14. Test operation.........................................................................................................................67
Ⅲ. Troubleshooting .............................................................................................................................69
1. Error code list...........................................................................................................................69
1.1 Indoor unit......................................................................................................................69