16
0020004886A
5.1 Filling Secondary DHW Circuit
NOTE: Do not manually open the temperature and pressure
relief valve or expansion relief valve for venting purposes (any
foreign matter in the pipework may cause damage to the valve
seats).
Ensure that the cylinder drain valve (9, fig. 6) is closed.
Open all the hot and cold water taps or other terminal fittings.
Open the mains water supply to the Glow-worm cylinder and
continue filling until water runs freely from the terminal fittings,
ensuring all air pockets are purged.
Close the terminal fittings and check the system for leaks.
Specially check the connection of the immersion heater for
leaks.
The system should now be thoroughly flushed.
Open hot water taps at opposite ends of the system and allow
water to discharge for at least 5 minutes.
Close the hot water taps.
5.2 Filling the Primary Circuit.
NOTE: Do not use boiler pressure relief valve for venting
purpose.
The complete primary CH system must be flushed out with both
cold and hot water. Fill and vent the central heating system as
detailed in the boiler installation instructions.
To assist with this operation set the manual override lever on the
2 port diverter valve (fig. 7) to the MANUAL position, and lock
in this position by pushing the lever into the valve head.
Completely drain the CH system, then refill and vent.
Reset the lever on the 2 port valve to the ”AUTO” position by
releasing the manual operating lever from the valve head (pull
outwards). For commissioning purposes and to reduce the time
for the cylinder contents to reach temperature, set the cylinder
hot water thermostat knob to setting middle position (approx.
40°C).
Operate the boiler as in section 5.3 until both the cylinder has
reached temperature and all radiators in the system are hot.
Then once again drain the complete CH system to remove
residues from the pipework and refill and vent again as above.
Reset the manual operating lever on the 2 port valve to the
”AUTO” position once the system has been refilled and vented.
5 Commisioning
5.3 Operating the Boiler
Ensure the boiler mains switch is turned on.
Ensure that the programmer and thermostats are calling for
heat.
Check that the boiler fires and heats the cylinder contents and
the radiators according to the DHW and room thermostat
settings.
Carry out the commissioning and testing procedures detailed in
the installation instructions supplied with the boiler.
Upon completion of the commissioning procedures, set the
DHW thermostat knob on the Glow-worm cylinder to setting 5-
6, approx. 60°C, and set the back up immersion heater (fig. 9)
thermostat to 60°C.
5.4 Benchmark Log Book
Complete the Benchmark Log Book included in the instructions.
5.5 User’s Instructions
Hand these instructions for use to the user for retention and
instruct in the safe operation of the boiler and cylinder. Advise
the user of the operation of the cylinder thermostat and the
immersion heater thermostat, and that normally a setting of
max, which gives a stored water temperature of approximately
60°C is adequate.
NOTE: In hard water areas the DHW temperature setting
should not exceed this setting to avoid possible scale build-up.
Advise the user of the precautions necessary to prevent damage
to the system and to the building if the system does not remain
operative during frost conditions.
Advise the user that the immersion heater is provided as a back
up means of water heating and is not intended for use at the
same time that the boiler is heating the cylinder.
Finally, advise the user that for continued efficient and safe
operation, the boiler and Glow-worm cylinder should be serviced
at least once a year by a qualified servicing company. It is
important and strongly recommended that arrangements are
made for a maintenance agreement with a qualified servicing
company to ensure regular servicing of the boiler and cylinder.
Please contact Glow-worm's Own Service Organisation
(01773-828100) for further details.
NOTE: Leave installation, servicing and user instructions with
the user.
6 Maintenance
The following maintenance work has to be carried out annually
by the competent installer or Glow-worm's Own Service
Organisation.
Inspection of pressure/temperature relief valve and expansion
relief valve.
Manually operate each valve by twisting the operating cap, and
check if water flows unobstructed via the tundish to the discharge
point. Ensure that both valves re-seat satisfactorily.
Check pressure of expansion vessel.
Turn off mains water supply and open nearest hot water tap to
depressurise the secondary water system.
Check the expansion vessel charge with a pressure gauge at
the test point. If the pressure is below 3.0 bar, top up with
suitable air pressure pump.
Servicing procedures for the Glow-worm boiler are contained in
the boiler installation and servicing instructions.
Complete the service section of Benchmark Log Book.
NOTE: In the event that parts require replacement, use only
genuine spare parts supplied by Glow-worm.