manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. Goodwe
  6. •
  7. Controllers
  8. •
  9. Goodwe SEC1000 User manual

Goodwe SEC1000 User manual

SEC1000
Setup Guideline
April 2021
SEC1000 C&I
1. The SEC1000
2. How to set up the EzLoggerPro
3. How to upgrade the firmware
4. Checks
5. Diagrams
Data may change without prior notice
1.1 The SEC1000
SEC1000 equipped with:
•IP65 cover
•AC switch
•EzLoggerPro
•3-phase meter
•Current transformer board
Functions
•Monitoring up to 60 inverters
•Export power limit function
•Load monitoring
•Reactive power control
•Massive update of FW
•Setup using SW Promate
Data may change without prior notice
1.2 The SEC1000
1. IP65 Cover
2. AC switch
3. EzLoggerPro
4. 3-pase meter
5. CT terminal (X/5 A)
RS485
Current transformer (X/5 A)
Ethernet
AC Line
(Reserved)
1
2
3
4
5
Data may change without prior notice
1.3 The SEC1000: current transformers
Connecting the current
transformers.
•Current Transformers (CTs) are not included in the SEC1000
•CTs must be appropriate to the electrical installationwhere they will be installed
•They must be installed in an ideal location to record the import/export flow
•For your selection,special attention should be paid to:
•Installation in bars vs wiring
•Primary (X/5 A): suitable for the maximum current of the entire installation(not just PV)
•Secondary (X/5 A): 5 amps
•Recommended open-core CT for easy installation
Example of open core current
transformers.
Explanatory diagram of the location of the current
transformers of the SEC1000.
GW SEC1000
Inverter –SEC1000 RS485 Line
CT (X/5 A)
Data may change without prior notice
2.1 Set up EzLoggerPro: Software Promate
•Download the Promate software from goodWe's website: www.goodwe.com/downloads.asp
Data may change without prior notice
2.2 Set up EzLoggerPro: Ethernet connection
Set up your computer (PC)
•Connect an Ethernet cable to your laptop and The EzLoggerPro Ethernet port
•Set up your computer's Ethernet connection before using Promate software
Data may change without prior notice
2.3 Set up EzLoggerPro (I)
•Make sure your computer's Ethernet connection is set up correctly
You need:
•Computer
•LAN Cable
•Software Promate (available on the web)
Steps:
1. Connect the computer to the Ethernet port of the EzLoggerPro
2. Press the "Reset" button of the EzLoggerPro (press > 10 sec.)
3. Watch the LEDs:
a. Right to left sequence correct (see point 4)
b. No sequence repeat point 2
4. Open the software Promate
a. Wait a few seconds
b. The LED will light up if the connection is correct
5. (Continue)
Ethernet port (RJ45)
Reset
LED lighting sequence
12345678
SEC1000
Data may change without prior notice
Step 1:
•Check the connection status with the equipment
•Connection Succeeds: correct
•Connection fails: failed
•Close and open Promate
•Repeat the "Reset" step, if necessary
•Check the correct upgarde of the FW
•FW ≥ V1.09: correct
•FW < V1.09: incorrect
•Repeat the upgrade
Confirm version FW
Confim Confim
Step 2:
•Activate the corresponding COM port
•Indicate the number of connected inverters (RS485) on the
activated port
•Confirm
Step 3:
•Refresh the list of inverters
•Check that all inverters connected via RS485 are displayed
•If an inverter is missing, you must check that it is correctly
installed and connected to the RS485
12 3
Confirm status
2.4 Set up EzLoggerPro (II)
Data may change without prior notice
Example "CT Ratio" of
Transformer 250/5A
250
5=50 Ratio
Step 4a:
•Click on the "Export Enab" box
Step 4b:
•Indicate the power of the PV system in the "Total Capacity" field
•Indicate the export power to the grid in the "Power Limit" field
•Without grid export: "0 kW"
•With export to grid: P Limit > P Total Capacity
•Confirm “Set”
Step 4c:
•Indicate the ratio of the current transformer installed
•Confirm “Set”
•Confirm “Get Data”
Step 4b (cont.):
•Select the corresponding analysis option
•Scan each phase: by phase
•Scan total of three phases: for the total number
of phases (suggested)
•Confirm “Ok”
Step 4c (cont.):
•Check the values
•Power (+): export of energy to the grid
•Power (-): import of energy from the grid
•If there is any inconsistency, check the installation of the CTs
4
4a
4b 4c
2.5 Set up EzLoggerPro (III)
Data may change without prior notice
Static IP
•Watch the LED
Step 6:
•Disconnect the computer from the SEC1000
•Connect the router cable to the ethernet port of the EzLoggerPro
Step 5A: Static IP
•Indicate the IP of the router
•Indicate the Subnet Mask, if necessary
•Indicate the DNS, if necessary
•Confirm “Set”
5A
Step 5B: Dynamic IP
•Check the "DHCP Enable" box
•With dynamic IP, the IP and mask are automatically
assigned by the router
•Confirm “Set”
5B
Dynamic IP
•Press the Reset button (pr > 5 sec.)
•LED sequence from left to right
•Watch the LED “Server”
LED “Server”:
•On: connecting and communicating correctly
•Flashing: communication failed, check assigned IP
•Off: connection failed, check the connection to the router
6
LED sequence, if IP Dynamic
12345678
2.6 Set up EzLoggerPro (IV)
•Proceed according to IP connection type: static (5A) or dynamic (5B)
Data may change without prior notice
•In order to be able to display the consumption and meter curves, the firmware (FW)
of the EzLoggerPro must be upgraded, using a USB memory stick.
•If necessary, you must update the SEC1000 using a USB stick.
You need:
•USB Memory Stick
•GoodWe Firmware File*
Steps:
1. The USB stick must be empty
2. Save the FW file to the root of the USB
•No folders or other documents should be on the USB
3. Turn off the AC switch
4. Insert the USB stick into the USB port of the EzLoggerPro
5. Turn on the AC switch
•The LEDs remain lit during the upgrade
6. Wait until the LEDs flash (approx. 2 mins.)
7. Retract USB stick
8. The upgrade has been completed
USB port
EzLoggerPro
AC switch
(*) You can request the FW file from GoodWe Technical Support.
SEC1000
USB stick
3.1 How to upgrade the Firmware
Data may change without prior notice
•The SEC1000 must be added to the FV plant in SEMS next to the inverter(s).
•The correct display in the SEMS Portal must be checked.
Steps:
1. Confirm that the SEC1000 has been added to the plant correctly
•SEMS > Settings > Plant setup > Device management
2. Status SEC1000:
a) Online: correct
b) Offline: check for proper communication:
i. SEC1000 - router
ii. Router - server
3. Check the curves shown at the PV plant
a) If the load curve is shown overlapping the PV generation curve and/or the meter curve is
shown flat (image 2), you must check the correct installation of the CTs (polarity)
b) If the curves are shown independent but inconsistent, you must check the correct
installation of the CTs (location) and/or the indicated CT ratio (step 4c)
c) If the curves are shown independently and coherently (image 3), the installation and
display is correct
4. The check has been completed
Image 1: status SEC1000.
Image 2: Incorrect PV system curves.
Image 3: Correct PV system curves.
4.1 Check the SEMS Portal
Data may change without prior notice
4.2 Check the CT
•The correct setting, location and direction of the current transformers (CT) should be checked
•CTs must be installed near the meter.
Checking the displayed real time data:
1. Turn OFF the PV system
•The energy consumed is supplied by the grid (import)
2. Refresh “Get Data” in Promate
• “RealTime Data” window will be displayed
3. Check the power values shown
•Power (+): energy-to-grid export impossible scenario (system OFF)
•Check the installation (direction) of CTs
•Power (-): importing power from the grid correct
4. Check the consistency of the displayed values*
•Check the “CT ratio” of the installed transformer (observe 4c)
•Check the correlation between the measured phase (voltage) and its CT
4c
* Ref.: Pi x Ii x Vi x Cos φ (± % measurement accuracy) under balanced conditions
Example "CT Ratio" of Transformer 250/5A
250
5=50 Ratio
Data may change without prior notice
4.3 Check the CT
Line 1 Line 2 Line 3 PV System
…
RCD
AC Switch
Meter
Main breaker.
User Utility
Schemas and diagrams are shown for illustrative purposes.
•The correct setting, location and direction of the current transformers (CT) must be checked
•CTs must be installed near the meter.
Line 1 Line 2 Line 3 PV System
…
RCD
AC Switch
Meter
Main breaker.
User Utility
Data may change without prior notice
4.4 Check the RS485 connection
•The correct installationand connection of the RS485 line must be checked.
Steps:
1. Check the RS485 connection, observe the inverter manual (available on the web).
2. Correctly locate the inverter's RS485 port
3. Check the RS485 connection on the EzLoggerPro, observe the manual
SMT Series
RS485 RS485
MT Series
RS485 port: COM1
RS485 port: COM2
RS485 port: COM3
SEC1000
RS485
SDT G2 Series
RS485
SDT G1 Series
Data may change without prior notice
5.1 Diagrams: Commercial & Industrial
PV Monitoring
(Wi-Fi / LAN)
PV + Load monitoring + Export limit (SEC1000)
Multiple inverters (up to 60 Inv.)
PV + Load monitoring + Export limit (SEC1000)
Multiple inverters (up to 60 Inv.)
PV monitoring (EzLoggerPro)
Data may change without prior notice
5.2 Diagrams: C&I + Weather Station
Multiple inverters (up to 60 Inv.)
PV + Load monitoring + Export limit (SEC1000)
Weather Station (EzLoggerPro)
EzLoggerPro
Weather Station
(Modbus RTU)
•Adding a Weather Station using an EzLoggerPro
Data may change without prior notice
5.3 Diagrams: C&I and Utility scale PV plants
Multiple inverters
Communication via RS485 y Optical fiber
SCB1000
Multiple inverters
Communication via RS485 y Optical fiber
SCB3000: SMT & HT series
SCB2000: MT series
•Optical fiber ring between subsystems and communication to inverters via RS485 or PLC
Data may change without prior notice
Thank you!

Other manuals for SEC1000

1

Other Goodwe Controllers manuals

Goodwe SEC1000S User manual

Goodwe

Goodwe SEC1000S User manual

Goodwe SCU3000 User manual

Goodwe

Goodwe SCU3000 User manual

Goodwe SEC1000 User manual

Goodwe

Goodwe SEC1000 User manual

Popular Controllers manuals by other brands

BB&S Pipeline 4 Way Controller manual

BB&S

BB&S Pipeline 4 Way Controller manual

Digitrax DN166I2 quick start guide

Digitrax

Digitrax DN166I2 quick start guide

DINUY PE K5X 002 instruction manual

DINUY

DINUY PE K5X 002 instruction manual

PI E-625 user manual

PI

PI E-625 user manual

Smartgen GENSET CONTROLLER MGC310 user manual

Smartgen

Smartgen GENSET CONTROLLER MGC310 user manual

Data Technology 5150XL installation guide

Data Technology

Data Technology 5150XL installation guide

BIGSTONE C500B-LCD instructions

BIGSTONE

BIGSTONE C500B-LCD instructions

Trolex TX9042 user manual

Trolex

Trolex TX9042 user manual

Kübler 573 Series operating instructions

Kübler

Kübler 573 Series operating instructions

Viconics VT8000 Series installation guide

Viconics

Viconics VT8000 Series installation guide

Omron E5EC instruction manual

Omron

Omron E5EC instruction manual

RYTEC System 4 Installation & owner's manual

RYTEC

RYTEC System 4 Installation & owner's manual

Adaptec ASR-2045 Important information about issues and errata

Adaptec

Adaptec ASR-2045 Important information about issues and errata

Martin M6 Series Guide

Martin

Martin M6 Series Guide

Franke AQUA802 Installation and operating instructions

Franke

Franke AQUA802 Installation and operating instructions

Chemitech IT Perdana pH/ORP-3500 Series Operation manual

Chemitech IT Perdana

Chemitech IT Perdana pH/ORP-3500 Series Operation manual

Altronic DE-2500 Installation & operating instructions

Altronic

Altronic DE-2500 Installation & operating instructions

Plasmatronics DINGO D8040N user guide

Plasmatronics

Plasmatronics DINGO D8040N user guide

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.