
User InstructionsPage 6
LCD screen and the slow flashing Grant logo (and remote Grant logo
indicator, if fitted) will be automatically cancelled.
The boiler pellet hopper will not be completely filled by the side
pellet store. The auger will only transfer pellets to the boiler
pellet hopper until the contents switch is satisfied.
NOTE
!
The side pellet store is also fitted with a contents switch. The side
pellet store auger will only operate when this contents switch indicates
there are sufficient pellets in the side pellet store. If this level drops
below the minimum to activate the contents switch, the auger will no
longer operate to transfer pellets to the boiler pellet hopper.
In this instance, when the boiler pellet hopper contents switch detects
a low fuel level, no pellets will be transferred to the boiler pellet hopper.
The control panel LCD screen will show ‘Fuel Low Warning’ and the
Grant logo (on the front of the boiler) and the optional Remote Grant
logo Indicator (if fitted), will also flash (slowly) to indicate that the pellet
level in the boiler hopper has fallen to the pre-set minimum.
If the boiler pellet hopper is not topped up at this point, the boiler
will continue to operate for a short period before the burner is
automatically stopped.
Topping up the boiler pellet hopper with at least 20kg of pellets will
operate the contents switch and automatically re-start the burner (as
long as there is a demand present for the boiler to run). Both the ‘Fuel
Low Warning’ on the boiler control panel LCD screen and the slow
flashing Grant logo will be automatically cancelled.
In order to maximise the combined pellet storage capacity of
the boiler and side pellet store, it is recommended that both the
boiler pellet hopper and the side pellet store are filled to the
top when topping-up with pellets.
NOTE
!
The hinged lid on the side pellet store MUST be closed first to allow
the boiler hinged lid to close. The boiler (and side store) hinged lid
must be closed to activate the lid safety cut-out switch or the burner
will not operate. Refer to Section 1.3.
The hinged lids on BOTH the boiler and the optional side pellet
store (if fitted) MUST BE CLOSED for the boiler to operate. If
either the boiler hopper lid or side pellet store lid is opened for
longer than FIVE seconds, whilst the boiler is operating, the
burner will be automatically shut down.
NOTE
!
1.7 Boiler Operation
The burner output is determined by the delivery rate of the pellets via
the pellet feed auger (inside the pellet hopper). This is automatically
controlled by the boiler control system. During commissioning the
boiler control parameters will have been checked and adjusted as
necessary by your Installer.
Do not adjust or modify the appliance in any way as to do so
could cause malfunction of the appliance, injury to persons or
death or result in a potential fire hazard. Only an Installer, who
has completed the Grant UK training course, should carry out
any work on the appliance.
!WARNING
Once commissioned by a Grant trained Installer, your Grant Vecta
boiler will operate automatically to provide heating and domestic hot
water (if you have a hot water cylinder fitted), as long as:
• There are sufficient pellets of the correct type in the pellet
hopper (refer to Section 2)
• The heating system controls are set to ON and ‘calling’, i.e. the
programmer and room thermostat are on.
• The boiler ON/STANDBY switch on the control panel is set to ON
(refer to Section 3)
If your appliance is controlled by a remote programmer and/or a room
thermostat, it will provide heating and (when fitted) hot water during
the ON periods as set on the programmer, when either the room
thermostat and/or the hot water cylinder thermostat are ‘calling’.
Certain external surfaces of the boiler will be hot to touch when
in operation, due care is needed.
!WARNING
1.8 Cleaning
The burner, located within the boiler combustion chamber,
incorporates a brazier where the combustion of the wood pellets takes
place. This brazier is fitted with a self-cleaning system to prevent a
build-up of ash and clinker. This operates automatically after a pre-set
period has elapsed.
The heat exchanger of the Grant Vecta boiler has a self-cleaning
system to keep the heat exchanger tubes clear of ash build-up.
The Grant Vecta is a condensing boiler and, as such, has a second
(condensing) heat exchanger. Refer to ‘Condensing Boiler Operation’
(Section 1.1) for more details on how this works. This second heat
exchanger is fitted with a ‘wash down’ system to keep the tubes clear
of any ash build-up.
As with the brazier cleaning system, the heat exchanger cleaning
systems are operated automatically after a pre-set period has elapsed
and also whenever power is reconnected to the boiler.
Even with the automatic cleaning systems, it is vitally important
that the boiler ash pan is regularly emptied and the boiler
regularly serviced. Refer to Section 11 of these instructions for
further information on cleaning and servicing your boiler.
!CAUTION