Assembly and Installation
1. Locate the vertical support (stud) in the wall of the trailer.
Fasten two Mounting Brackets for each post to the side of
the trailer vertically and spaced accordingly for the length of
your side posts. Install the upper bracket just below the drip
rail where the three provided TEK screw fasteners will
penetrate the vertical support. (If through bolts are desired,
acquire necessary hardware locally). Applying a bead of caulk
between the mounting bracket and trailer wall will prevent
water infiltration (caulk not included). Repeat this process for
each of the side mounted posts.
2. In each bracket, assemble the bolts through the slots
into the double T-Nut loosely. Slide the posts (sold separately)
over the T-Nuts into position. Before tightening, use a tape
measure from the top of the post to the drip rail or upper
bracket to maintain consistent height of each of the side
mounted posts. (Note that you should not exceed the legal height
limits for the roads on which you will travel.)
If the optional Bow Stiffener was purchased, install it now, see instructions bellow.
3.. Place the Ladder Rack Bow across the top of
the trailer, insert a spacer (2x4) between roof and
Rack cross member. (For trailers under 6’ wide the
crossmember needs to be cut or replaced with a shorter
side mount post). Slide the eyebolts where you want
an attachment point.Loosely attach 2 long double
T-nuts to each rack corner with one bolt in each T-
nut, so that the T-nuts can pivot. Slide the
assembly to the desired height on the side
mounted post. Insert a second bolt in each T-nut. Check position with a tape measure
and tighten all bolts. Repeat this process to install a right and left rack corner at each
side mounted post.