9.4.3 Fitting the upper bearing
1. Heat up the ball bearing (154) to 110 °C and fit it on the shaft.
2. Let the assembly cool down.
3. Grease the ball bearing (154). Fill only 50 % of the free space
of the bearing.
9.4.4 Fitting the lower bearing
1. Place the rotor in vertical position with the shaft end pointing
upwards.
2. Fill the bearing bracket cover (60) with grease and place the
cover on the shaft so that it is lying against the rotor.
3. Place the washer (187a) and the circlip (187) on the shaft.
4. Heat up the ball bearing to 110 °C and fit it on the shaft.
5. Let the assembly cool down.
6. Grease the ball bearing (153). Fill only 50 % of the free space
of the bearing.
7. Heat up the lower bearing bracket (155) to 110 °C and press it
home.
8. Turn the assembly so that the shaft end points downwards.
9. Fit the bearing bracket cover (60) to the lower bearing bracket
cover (155).
9.4.5 Fitting the secondary shaft seal
1. Place the motor in vertical position so that the shaft end points
upwards.
2. Make sure that the shaft is clean and smooth.
3. Fit the O-ring on the stationary part of the secondary shaft
seal (105b).
4. Lubricate the O-ring and fit the stationary part on the
secondary shaft seal (105b) on the shaft and press it home
(50: Oand 54: Q).
5. Check that the O-ring is fitted on the rotating part of the
secondary shaft seal (105b).
6. Fit the rotating part of the secondary shaft seal (105b) on the
shaft and press it home (50: Oand 54: Q).
7. Tighten the set screws in the secondary shaft seal (105b) to a
torque of 6 Nm.
8. Remove the PUR-tool and the set-up clip from the secondary
shaft seal (105b).
9.4.6 Fitting the shaft seal housing
1. Fit and lubricate the O-ring (72).
2. Fit the shaft seal housing (58) on the stator housing (55).
3. Fit the screws (184).
9.4.7 Fitting the upper bearing bracket
1. Fit the O-ring (157b) to the upper bearing bracket (61).
2. Pull the stator cables through from the cable holes.
3. Fit the upper bearing bracket (61) to the stator housing (55).
If needed, tap gently.
4. Connect according to the wiring diagram. See section
11.5 Electrical connections.
5. Fit the absorbing bag.
9.4.8 Fitting the motor top cover
1. Fit the O-ring (157) on the motor top cover (164a).
2. Place the cover near the motor (301) and connect the cables
according to the wiring diagram. See section 11.5 Electrical
connections.
3. Fit the motor top cover (164a). Tap gently, if needed.
4. Fit the screws (178).
9.4.9 Fitting the cooling jacket
1. Fit the O-rings (37a and 157b).
2. Mount the cooling jacket (150c) on the stator housing (55)
using a hoist. Tap gently, if needed.
3. Fit the screws (150a).
4. Fit the lifting bracket (190) and the screws (190b).
9.4.10 Fitting the primary shaft seal
1. Make sure that the shaft is clean and smooth.
2. Fit the O-ring on the stationary part of the primary shaft seal
(105).
3. Lubricate the O-ring and fit the stationary part on the
secondary shaft seal (105) on the shaft.
Make sure that the gap in the stationary part meets the
projection on the lower bearing bracket (155).
4. Press the stationary part of the primary shaft seal home (105)
(50: Oand 54: Q).
5. Check that the O-ring is fitted on the rotating part of the
primary shaft seal (105).
6. Fit the rotating part of the primary shaft seal (105b) on the
shaft.
7. Fit the set-up clip between the seal parts and press the
rotation part of the seal home (50: Oand 54: Q).
8. Tighten the set screws in the primary shaft seal (105) to a
torque of 6 Nm.
9. Remove the PUR-tool and the set-up clip from the primary
shaft seal (105b).
10. See section 10.1 Tightness test of shaft seal housing.
9.4.11 Oil filling
See section 8.5 Oil check and oil change.
9.4.12 Fitting the impeller and pump housing
1. Fit the key (9a). Tap lightly, if needed.
2. Lubricate the cone of the shaft slightly.
3. Fit the impeller (49).
4. Fit the screw (67). Tighten to the torque specified in section
6.2 Special torques and lubricants
5. Mount the motor on the pump housing (50).
6. Fit the screws (26).
7. Check the impeller clearance. See section 8.6 Inspection and
adjustment of impeller clearance.
Only press on the inner ring of the bearing.
The pump must be fully assembled and closed
withing one hour after the new moisture absorbing
bag has been exposed to the atmospheric humidity.
Check the possible leak paths with leak detecting
liquid.
Tightness of complete motor must be verified through
a submersion test.