
STREAMLINE STORAGE ASSEMBLY
GYM RAX® INSTALLATION | STORAGE & SUSPENSION SYSTEMS 1 REVISON 20A
STREAMLINE STORAGE ASSEMBLY
PLANNING AHEAD
•Following the GYM RAX® Storage systems installation sequence is critical to the
performance of the structures and safety of the users.
•Read all instructions before proceeding.
•Review all supplied drawings & packing lists before starting any work.
•Identify any installation uncertainties and contact a GYM RAX customer success
representative for clarification.
•Consider the number of persons required to safely install GYM RAX.
•Plan for the method of installation and tools required.
•Take precautions to avoid damaging finishes.
•Do not over-torque bolted joints as walls of posts and tubes may crush.
•Never leave unsecured or unstable GYM RAX structures unattended.
ESTIMATED INSTALLATION TIME
30 minutes per bay
RECOMMENDED BOLT TORQUE SPECS
1/2” fasteners: 30-35 ft-lbs.
3/8” fasteners: 20-25 ft-lbs.
REQUIRED TOOLS AND SUPPLIES
9/16” & 3/4” drive sockets and/or wrenches