16 - 30
Hanskamp AgroTech B.V. (the Netherlands) www.hanskamp.nl/en
MulDos
EN Dosing system – Dosiersystem – Systeme de dosage - Doseersysteem
14. Take the rotor to turn it on the side of the recess (protruding side) in the sha of
the pump motor. With the last ghtening turn, press the HanskampQualityTube
into the recess of the pump. The tube is now clamped between the rollers and the
pump casing. Turn the rotor by hand on the motor sha (g. 36 and 37).
Note! The tube must be placed as perfect as possible in the curve of the pump
(g. 37).
15. Take the transparent cover (art.nr. 003-502-000) with the associated four long
ange head screws (art.nr. 003-509-000). Posion the cover so that it is right for
the recess in the pump. Tighten the screws evenly unl the lid is ght. Note: solid
xed! (g. 38 and 39)
16. Connect the motor of the MulDos to the control board of the feeding staon.
First, make the control board voltage free, before connecng the motorcable.
Aenon! During the connecng of the motor to the control board, light
electric shocks can exist.
Maintenance:
Check the MulDos on faults and wearing on a daily basis. Do this by means of a test on
the output of de tubes and electric cables. Check periodical the quanty and calibrate if
necessary. When the HanskampQualityTube is worn by intensive use (leaking), replace it
according described steps. A repair kit is available by Hanskamp. Also check the rollers
and bearings for wear. Also these parts are available as a repair kit by Hanskamp.
We recommend to disconnect the rotor when the system is temporarily decommis-
sioned. Replace the HanskampQualityTube every year, or aer pumping 1000L of uid.
Calibraon:
For calibraon: operate the motor manually ll the liquid emerges from the nozzle.
Aenon! During the rst rotaons you will not see anything
happen, this is because the rotor gets fastened to the axel of
the motor.
The MulDos is calibrated by allowing the feeding computer to emit a
pulse ten mes. Then you measure the amount of dispended liquid, divide
this by 10 and enter this value into the feeding computer. Repeat this pro-
cedure every month and also aer changing the liquid. This is one of the
possibilies for calibraon. When the manual of your feeding computer
describes another method of calibrang, you need to apply that way of
calibrang the MulDos.
Installaon instrucon Process Computer
Nedap: (001-669-000 motor SolidState5)
-Dosage volume: 30 (equals 3cc dosage volume of MulDos)
-Interval/dispensing speed 5sec/0,6kg/min.
Congure the minimum and maximum feeding speed per interval according to the same
rao as feedstus 1 and 2. Thereto don’t enter the same numbers, but enter as a rao of
concentrates/ liquid addive.
Conguring liquid addive can be done in the same way as conguring chop. But the
dosage weight is a tenth (1/10) part of the programmed weight.
Example: Programmed feed 3: 0,10 is the same as 10cc liquid addive
Programmed feed 3: 1,00 is the same as 100cc liquid addive
36
37
38
39