Hoops Pro Dunk Diamond User manual

OWNER’S
MANUAL
Warning
•! Do not slide, climb, or
play on pole.
•! Keep organic
material away from
pole base. Grass,
litter, etc. could cause
corrosion and /or
deterioration.
•! Check pole system
twice a year for signs
of corrosion (rust,
pitting, chipping).
Remove rust and/or
loose paint completely
and repaint with
exterior enamel paint.
If rust has penetrated
through the steel
anywhere, replace
pole immediately.
•! Check unit before
each use for loose
hardware, excessive
wear, and signs of
corrosion and repair
before using.
•! During play, use
extreme caution to
keep players face
away from the
backboard, rim, and
net.
•! Wear a mouth guard
when playing to avoid
dental injuries.
•! When adjusting
height, keep hands
and fingers away from
moving parts.
•! During play, do not
wear jewelry (rings,
watches, necklaces,
etc.). Objects may
entangle in net.
Pro Dunk®Diamond
Basketball System
MODEL NUMBER
PD-D-G
WELCOME TO THE FAMILY OF PRO
DUNK®OWNERS
Thank you for purchasing our basketball system. We try hard to
ensure that our products are of high quality and free of
manufacturing defects and of missing parts. However, if you have
any problems with your basketball pole, such as a manufacturing
defect or a missing part please contact us at the following:
Please provide model number, serial number, and/or part number
of the product and/or part when you call, write or email. These
numbers can be found on the product, packaging, or in this owner's
manual.
Read this manual all the way through before starting to put up
your pole. Then read each step completely before beginning
that step.
Toll Free: 1.800.294.4667
Web: www.hoopsincorporated.com
FAX: (281) 357-4822
Hoops Incorporated
22047 Lutheran Church Rd.
Tomball, TX 77377
1

Bill of Materials
Ref. Qty. Description
A 1 Vertical Post
B 1 Main Extension Arm
C 2 Parallel Linkage
D 1 H-Frame Backboard Mount
E 2 Spring-Assist Cartridge
F 1 Crank Adjustment Cylinder
G 1 Rim Height Indicator
H 1 Rim Height Sticker
I 6 18mm Anchor J-Bolts
J 18 18mm Hex Nuts
K 2 42cm X 20mm Hex Bolts
L 2 20mm Hex Nuts
M 2 36cm X 16mm Hex Bolts
N 2 16mm Hex Nuts
O 2 42cm X 16mm Hex Bolts
P 2 16mm Hex Nuts
Q 1 19cm X 14mm Hex Bolt
R 1 14mm Hex Nut
S 1 14cm X 14mm Hex Bolt
T 1 14mm Hex Nut
U 4 Steel/Plastic Backboard/Rim Spacers
V 8 35mm X 8mm hex bolts (backboard frame)
W 8 8mm Hex Nuts, Washers, Lock Washers (Backboard Frame)
2

Installation Instructions
In order to have the safest fun and longest use of your Pro Dunk® system,
please note and heed the following:
1. Prior to main post preparation and goal assembly, call utility services for
location of underground utility lines before you dig.
2. NOTE: Immediately unpack all components and cross check against bill of
materials. Report any shortages to Hoops customer service at
1.800.294.4667.
3. Vertical main post assembly is a two part process.
PART 1 PART 2
Day 1.
Complete Anchor System
Installation Instructions. (Below) Day 5. Complete Pro Dunk®
assembly instructions.
Day 2. Allow concrete to cure.
Day 3 Allow concrete to cure.
Day 4. Allow concrete to cure.
4. For safety measures have at least 3 capable persons to assist you in
assembly of your Pro Dunk® Goal.
3

ANCHOR SYSTEM INSTALLATION INSTRUCTIONS
(Day 1)
1. Choose the proper location to
dig for the concrete footing. Use
the distance chart in figure A to
help you make your decision.
When choosing the exact
position to dig, make sure to
maximize the amount of playing
surface while minimizing possible driveway obstruction.
Rim Height Distance from the face of the backboard to
the front of the Vertical Post (A)
6’ 73.5”
8’ 70”
10’ 60”
2. Dig hole 48" deep and 24" square. Be sure to bell out the bottom of the
hole to give added stability to the footing.
NOTE: If you live in an area where the frost
line is below 48" it is advisable to dig to
normal frost line. Do not cheat on the hole
size, it is imperative that the hole be a
minimum of 48" deep and 24" square!
3. Assemble the anchor kit as shown in figure B. First thread an 18mm hex
nut all the way on to each J-Bolt. Place the threaded end of each J-Bolt
through the 4 holes located in the anchor template. Then thread a second
18mm nut on to each J-Bolt until tight against the template, making sure to
keep the J-Bolt hooks pointing in toward the center of the template.
4. For this step you will need: Level; Broomstick; Tape Measure. The 48" x
24" anchor footing will require a little over a 1/2 yard of 3000 psi concrete
(32-34 60# sacks of premix concrete). More will be needed if you dig a
larger hole.
NOTE: Make certain that you have enough
concrete to finish the job. Allowing a
portion to dry while you purchase more
concrete will weaken the footing.
5. Mix the concrete according to the instructions on the bag. Fill the hole full
to ground level with as little time between batches as possible.
NOTE: It is better to mix it slightly wet
4

than too dry.
6. Insert the broomstick in 3 or 4 different places and vibrate up and down to
settle the concrete. Submerge the (4) anchor footing rebar pieces into the
center of the hole spaced evenly. Next set the anchor bolt assembly into
the wet concrete, vibrate it as it goes in to make sure the concrete fills in
around the J-Bolt hooks. Make sure the template is pressed firmly against
the top of the wet concrete. Use the level to ensure that it is level in all
directions. Additionally, the center line of the J-Bolts must be parallel with
the edge of the playing surface. (See figure C)
STOP HERE!
Allow footing to cure for 3-7 days before proceeding.
5

PRO DUNK® ASSEMBLY INSTRUCTIONS
(Day 5)
7. Loosen the top 18mm nuts (J) ½ turn from the J-Bolts (I). These will be
your level adjustment nuts. Leave black metal template in place.
8. Place the vertical post (A) down over the footing making sure not to
damage the J-Bolt (I) threads. Using the final 6 18mm hex nuts (J), bolt
down post (A) finger tight with two metal ears to the rear.
9. Level the vertical post (A) by adjusting the 18mm nuts (J) located
underneath the base plate. Then tighten top nuts against the top side of
the base plate.
10.Slide the main arm (B) over the top of the vertical post (A) and attach to
the lower pivot tube with a 42cm X 20mm hex bolt (K) and a 20mm hex
nut (L).
11.Next attach the hand crank adjustment cylinder (F) using a 42cm X 16mm
hex bolts (O) and 14cm X 14mm hex bolt (S). Tighten each with a 16mm
(P) and 14mm hex nut (T).
12.Line up the hole located in the rim height indicator (G) which is plastic with
a hole in one end over the hole in one of the second set of welded tubes in
the main arm (B). Attach both spring-assist cartridges (E) to the main
extension arm (B) using a 42cm X 20mm hex bolt (K) and 20mm hex nut
(L) to attach both cartridges (E), lower the open end of each spring-assist
cartridge (E) down over the top of each welded tab as shown in Figure A.
Use the 19cm X 14mm (Q) and 14mm hex nut (R) to attach them to the
welded tabs. You may need to turn the spring assist cartridges (E) or
rotate to line up holes. The rim height indicator (G) should hang freely
along the outside of one of the cartridges. Next, remove and discard the
blue plastic spreader tube from spring-assist cartridges (E).
13.Attach parallel linkages (C) to vertical post (A) with 36cm X 16mm hex bolt
(M) and a 16mm hex nut (N).
NOTE: It does not matter which end of the
parallel link you attach to the vertical post.
CAUTION: Injury may occur if linkages are
allowed to fall off main arm during assembly.
14.Next, lay the H-Frame (D) down into backboard aligning the four top and
bottom holes in the H-Frame (D) with the four holes in the top and bottom
of the backboard. Check to make sure the rim hole pattern in the H-Frame
(D) lines up with the rim hole pattern in the backboard, adjust as needed.
When you are satisfied with alignment, attach backboard to H-Frame (D)
at all points along the top and bottom of the board using the 35mm X 8mm
hex bolts, flat washers, lock washers and hex nuts (V) as shown in figure
D. Tighten all 8mm hardware (V).
6

15.Mount the H-Frame (D) and Backboard assembly lower pivot tube first to
the main arm (B) using 1 42cm X 20mm hex bolt (K) and 1 20mm hex nut
(L). Next, attach the upper H-Frame (D) pivot tube to the upper parallel
linkages using 1 36cm X 16mm hex bolt (M) and 1 16mm hex nut (N).
16.Check face of backboard to see if it is level forward and back. If it is not
level, correct it by adjusting the 18mm nuts (J) located underneath the
vertical post (A) base plate.
17.Prior to installing the rim, locate four plastic and steel spacers (U). Insert
them into four rim holes in backboard. This is very important to prevent
backboard breakage.
CAUTION: Do not proceed with rim
installation without these spacers!
18.Mount the rim to the H-Frame (D) and Backboard assembly using the
hardware supplied in the rim box. Use a level to make sure rim is level
side to side before tightening nuts.
19.After everything is square, make sure all nuts have been tightened.
NOTE: Use a level to make sure rim is
level side to side before tightening nuts
NOTE: Do not over tighten. If unit is
excessively difficult to crank up and down
the main pivot nuts are probably too tight.
20.To apply the rim height sticker (H), first use a tape measure to crank rim
up to exactly 10' from the playing surface. Use a pencil to make a mark on
the spring-assist outer tube (E) where the bottom of the rim height
indicator stops. Then, peel and apply sticker to outside of spring-assist
cartridge (E) lining up the pencil mark with the 10' mark on the sticker. See
figure A for a diagram of a completed height indicator assembly.
NOTE: It is advisable to wait up to two
weeks to allow the anchor footing to fully
cure before aggressive play.
7

Installation Figures
8

9

Figure E
10

Pro Dunk® Care Information
BACKBOARD
Items needed to clean backboard:
•100% cotton soft cloth, (only)
•Mild dish washing liquid for soap
•Luke warm water
Cleaning Directions
Rinse backboard with lukewarm water. Wash gently with a 100% Cotton soft
cloth, lukewarm water and mild soap. Do not scrub. Rinse backboard with
lukewarm water again. Dry with 100% cotton soft cloth. To minimize scratches
and minor abrasions to your backboard
Rim
•The goal should not be cranked under 5’ 6” or over 10'. Adjustments of the
goal should be done under adult supervision.
•When attempting slam dunk activity you should always wear a mouth guard to
avoid dental injury.
11

Hoops Inc. Pro Dunk® Limited Lifetime Warranty
Hoops Pro Dunk® basketball structural components are warranted to the original purchaser to be
free from defects in material or workmanship for the duration of ownership by the original retail
purchaser. The word “defects” is defined as imperfections that impair the use of the product.
Warranty Fulfillment
Merchandise must be shipped prepaid with a copy of proof of purchase to Hoops Inc. for
examination to see whether it needs to be repaired or replaced. Any labor costs, travel expenses
and any other changes involved in the removal, installation or replacement of the
defective/repaired parts from/to your Hoops Pro Dunk system will be your (the purchaser's)
responsibility. Shipping charges for replaced or warranted merchandise being sent back to the
customer must be prepaid by the customer in advance. If not, the replacement shipment will be
sent out collect. Hoops Inc. reserves the right to examine photographs or physical evidence of
merchandise claimed to be defective, and to recover said merchandise, prior to authorization of
warranty claims.
What is not covered by this warranty
This warranty does not cover defects or damage due to improper installation, shipping, handling,
alteration, accidents, vandalism, weather conditions (rusting), exposure to corrosives, negligence,
misuse (anything other than a type of basketball activity or related contact with the unit),
scratching, scuffing or any event beyond the control of the Hoops Inc..
Liability
Hoops Inc. shall not be liable for indirect, special, or consequential damages arising out of or in
connection with the use or performance of the products or other damages with respect to any
economical loss, loss of property, loss of enjoyment of use, costs of removal, installation or other
consequential damages for breach of any expressed or implied warranty on these products.
Guidelines
Keep your proof of purchase (original retail purchaser). Without it, we will not be able to proceed
with any warranty service.
•Call
1-800-294-4667 / Warranty Dept.
•Write
Hoops Inc.
Attn: Warranty Dept
22047 Lutheran Church Rd.
Tomball TX 77377
•Email
support@hoopsincorporated.com
Toll Free: 1.800.294.4667
Web: www.hoopsincorporated.com
FAX: (281) 357-4822
Hoops Incorporated
22047 Lutheran Church Rd.
Tomball, TX 77377
12
This manual suits for next models
1
Table of contents
Other Hoops Sport & Outdoor manuals

Hoops
Hoops Pro Dunk Elite User manual

Hoops
Hoops Pro Dunk Adjustable Select User manual

Hoops
Hoops Pro Dunk Arena Ultimate User manual

Hoops
Hoops Pro Dunk Platinum User manual

Hoops
Hoops Pro Dunk Competitor User manual

Hoops
Hoops Pro Dunk Original Select User manual

Hoops
Hoops Pro Dunk Gold PD-G-G User manual