Huawei RRU3931E User manual

RRU3931E
V100R011C10
Installation Guide
Issue Draft A
Date 2016-03-30
HUAWEI TECHNOLOGIES CO., LTD.

Copyright © Huawei Technologies Co., Ltd. 2016. All rights reserved.
No part of this document may be reproduced or transmitted in any form or by any means without prior written
consent of Huawei Technologies Co., Ltd.
Trademarks and Permissions
and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd.
All other trademarks and trade names mentioned in this document are the property of their respective
holders.
Notice
The purchased products, services and features are stipulated by the contract made between Huawei and the
customer. All or part of the products, services and features described in this document may not be within the
purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information,
and recommendations in this document are provided "AS IS" without warranties, guarantees or
representations of any kind, either express or implied.
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute a warranty of any kind, express or implied.
Huawei Technologies Co., Ltd.
Address: Huawei Industrial Base
Bantian, Longgang
Shenzhen 518129
People's Republic of China
Website: http://www.huawei.com
Email: [email protected]
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
i

Contents
1 RRU3931E Installation Guide..................................................................................................... 1
1.1 Changes in RRU3931E Installation Guide.....................................................................................................................4
1.2 Installation Preparations................................................................................................................................................. 4
1.2.1 Installation Environment............................................................................................................................................. 4
1.2.2 Reference Documents..................................................................................................................................................5
1.2.3 Tools and Instruments..................................................................................................................................................5
1.2.4 Skills and Requirements for Installation Personnel.....................................................................................................6
1.2.5 Installation Scenarios...................................................................................................................................................7
1.2.6 Installation Clearance Requirements........................................................................................................................... 8
1.3 Unpacking Inspection..................................................................................................................................................... 9
1.4 Obtaining the SN.......................................................................................................................................................... 11
1.5 Installation Process....................................................................................................................................................... 11
1.6 Installing a RRU3931E.................................................................................................................................................12
1.6.1 Mounting Kits............................................................................................................................................................12
1.6.2 Installing a RRU3931E on a Pole..............................................................................................................................14
1.6.3 Installing a RRU3931E on a Wall............................................................................................................................. 17
1.7 Installing Cables........................................................................................................................................................... 21
1.7.1 Cabling Requirements............................................................................................................................................... 21
1.7.2 Cable Connections.....................................................................................................................................................23
1.7.3 Opening the Maintenance Cavity Covers..................................................................................................................24
1.7.4 Installing a Power Cable............................................................................................................................................25
1.7.5 Installing an CPRI Fiber Optic Cable........................................................................................................................27
1.7.6 (Optional) Installing an CPRI Fiber Optic Cable for Cascading...............................................................................29
1.7.7 Closing the Maintenance Cavity Covers................................................................................................................... 30
1.7.8 Installing a PGND Cable........................................................................................................................................... 31
1.7.9 (Optional) Installing an RF Jumper........................................................................................................................... 33
1.8 (Optional)Replacing the Internal Antenna with External Antennas.............................................................................36
1.9 Checking the Hardware Installation............................................................................................................................. 41
1.10 Performing a Power-On Check...................................................................................................................................42
1.11 References...................................................................................................................................................................43
1.11.1 Assembling a Shielded RJ45 Connector and an Ethernet Cable............................................................................. 43
1.11.2 Checking the Appearance of Metal Contact Strips..................................................................................................47
1.11.3 Testing the Connection of Assembled Cables......................................................................................................... 49
RRU3931E
Installation Guide Contents
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
ii

1.11.4 Assembling a Tool-less Female Connector (Pressfit Type) and a Power Cable......................................................53
1.11.5 Small Cell Engineering Label..................................................................................................................................56
1.11.6 Attaching a Sign Plate Label................................................................................................................................... 57
1.11.7 SN Collection Template...........................................................................................................................................59
RRU3931E
Installation Guide Contents
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
iii

1 RRU3931E Installation Guide
Introduction
This document describes how to install a RRU3931E in different scenarios and provides the
hardware installation checklist as a reference.
Product Version
The following table lists the product versions related to this document.
Product
Name
Solution Version Product Version
RRU3931E lSRAN11.1 and later versions
lRAN18.1 and later versions
leRAN11.1 and later versions
V100R011C10 and later versions
Intended Audience
This document is intended for:
lRRU3931E installation engineers
lSystem engineers
lSite maintenance engineers
Organization
1.1 Changes in RRU3931E Installation Guide1.1 Changes in RRU3931E Installation
Guide
This section describes the changes in RRU3931E Hardware Description.
1.2 Installation Preparations1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1

1.3 Unpacking Inspection1.3 Unpacking Inspection
This section describes how to unpack and check the delivered materials to ensure that all the
materials are included and intact.
1.4 Obtaining the SN1.4 Obtaining the SN
This section describes how to obtain the serial number (SN) of a RRU3931E. Before
installing the RRU3931E, record its SN for future use during commissioning.
1.5 Installation Process1.5 Installation Process
This section describes the process for installing a RRU3931E. The process includes:
lInstalling a RRU3931E
lInstalling cables
lChecking the hardware installation
lPerforming a power-on check
1.6 Installing a RRU3931E1.6 Installing a RRU3931E
This section describes the procedure and precautions for installing a RRU3931E.
1.7 Installing Cables1.7 Installing Cables
This section describes the procedure and precautions for installing cables.
en-us_topic_0027706033.xmlen-us_topic_0027706033.xml
This section describes the procedure and precautions for adjusting the installation angles of a
RRU3931E.
1.9 Checking the Hardware Installation1.9 Checking the Hardware Installation
This section describes how to check the hardware installation after a RRU3931E is installed.
1.10 Performing a Power-On Check1.10 Performing a Power-On Check
This section describes the procedure for performing a power-on check on a RRU3931E.
1.11 References1.11 References
This section describes reference information and common operations involved during
installation.
1.1 Changes in RRU3931E Installation Guide
This section describes the changes in RRU3931E Hardware Description.
1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
1.3 Unpacking Inspection
This section describes how to unpack and check the delivered materials to ensure that all the
materials are included and intact.
1.4 Obtaining the SN
This section describes how to obtain the serial number (SN) of a RRU3931E. Before
installing the RRU3931E, record its SN for future use during commissioning.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
2

1.5 Installation Process
This section describes the process for installing a RRU3931E.
1.6 Installing a RRU3931E
This section describes the procedure and precautions for installing a RRU3931E.
1.7 Installing Cables
This section describes the procedure and precautions for installing cables.
1.8 (Optional)Replacing the Internal Antenna with External Antennas
This section describes how to replace the RRU3931E internal antenna with external antennas.
1.9 Checking the Hardware Installation
This section describes how to check the hardware installation after a RRU3931E is installed.
1.10 Performing a Power-On Check
This section describes the procedure for performing a power-on check on a RRU3931E.
1.11 References
This section describes reference information and common operations involved during
installation.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3

1.1 Changes in RRU3931E Installation Guide
This section describes the changes in RRU3931E Hardware Description.
Draft A (2016-03-30)
This is a draft.
1.2 Installation Preparations
This section describes the preparations for installation. Before starting the installation, you
must get the installation environment ready, obtain the required reference documents, tools,
and instruments, and familiarize yourself with the skills required.
1.2.1 Installation Environment
Before starting the installation, ensure that the power supply equipment, transmission
equipment, and related matching equipment are ready.
Precautions for Site Selection
lDo not install a RRU3931E near an interference source, such as a broadcast and
television tower, high and low-voltage substation, high-voltage tower, high-power radio
transmitter, and radar station.
lFor the sake of surge protection, the mounting height of a RRU3931E should not be
greater than 10 m. Do not install a RRU3931E along a highway or railway or on the
mountain top, tower, standalone pole in a suburban area or open field, or standalone
rooftop in a non-urban area.
Requirements for the Upper-level Circuit Breaker
Slow-blow fuses of the gL (DIN VDE)/gG (IEC) class in accordance with IEC60269-1 are
recommended. Fuses of the same specifications must be configured for L and N wires for the
sake of O&M security.
Type C bipolar circuit breakers in accordance with IEC60934 are recommended. Circuit
breakers must be configured for L and N wires for the sake of O&M security.
Table 1-1 describes the recommended specifications.
Table 1-1 Requirements on the upper-level circuit breakers and power cables
Power Supply Current of the Upper-
level AC Circuit
Breakers (or Fuses)
Cross-Sectional Area of
the Input Power Cable
220 V AC single-phase lMinimum value: 5 A
lRecommended value: 16
A
1.5 mm2 to 2.5 mm2
110 V AC dual-live-wire
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
4

Power Supply Current of the Upper-
level AC Circuit
Breakers (or Fuses)
Cross-Sectional Area of
the Input Power Cable
110 V AC single-phase lMaximum value: 20 A
NOTE
lThe requirements provided in the preceding table are based on the peak power of a RRU3931E and
do not represent power consumption when the RRU3931E is running.
lMinimum value: Ensures that a RRU3931E can work normally under normal circumstances.
However, lightning strikes or abnormal voltage fluctuations may trip the circuit breaker or melt the
fuse.
lRecommended value: Ensures that a RRU3931E can work normally under normal circumstances
and that the circuit breaker does not trip in the event of lightning strikes or abnormal voltage
fluctuations.
lMaximum value: Indicates the maximum rated current allowed in the product design.
Requirements for Surge Protection and Grounding
Huawei by default uses a three-core power cable to connect a RRU3931E and external power
supply equipment. The power supply side must ensure that the PE wire of the three-core
power cable can be properly grounded. In outdoor installation scenarios or outdoor cabling
scenarios, PGND cables must be used to guarantee the surge protection and grounding for the
ground terminals of the mounting kits.
Requirements for power supply
During installation, power off the RRU3931E.
1.2.2 Reference Documents
This section describes reference documents required for installation.
Before starting the installation, you must be familiar with the following reference documents:
lSafety Information
lRRU3931E Hardware Description
1.2.3 Tools and Instruments
Before starting the installation, prepare the following tools and instruments.
Marker (diameter ≤ 10 mm) Hammer drill (Ø12 bore) Rubber mallet
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5

Level Torque screwdriver
Phillips (M3, M4)
Flat-head (M6, M8)
Torque wrench
Cable cutter Wire stripper COAX crimping tool
Crimping tool for power
cables
RJ45 crimping tool Diagonal pliers
Heat gun Utility knife Multimeter
ESD gloves Vacuum cleaner Measuring tape
1.2.4 Skills and Requirements for Installation Personnel
Installation personnel must be qualified, trained, and familiar with correct operation methods
and safety precautions before performing any operations.
Before starting the installation, pay attention to the following items:
lThe customer's technical engineers must be trained by Huawei and be familiar with the
proper installation and engineering methods.
lThe number of required installation personnel depends on the engineering schedule and
installation environment. Generally, three to five installation personnel are necessary.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
6

1.2.5 Installation Scenarios
The RRU3931E can be installed on a pole or a wall.
Pole-mounted Installation
A RRU3931E can be installed on a pole with a diameter of 60 mm to 381 mm.
Figure 1-1 illustrates a pole-mounted RRU3931E.
Figure 1-1 Pole-mounted installation
(1) RRU3931E (2) Attachment plate (3) Mounting
bracket
(4) Steel belt
Wall-mounted Installation
In wall-mounted installation scenarios, note the following:
lThe wall has a capacity of bearing at least four times the weight of the RRU3931E to be
installed without damage.
lExpansion bolts must be torqued to 28 N·m to ensure the bolts work properly without
causing cracks on the wall.
Figure 1-2 illustrates a wall-mounted RRU3931E.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
7

Figure 1-2 Wall-mounted installation
(1) RRU3931E (2) Attachment plate (3) Mounting bracket
1.2.6 Installation Clearance Requirements
This section describes the clearance requirements for installing a RRU3931E on a pole or
wall.
Figure 1-3 shows the recommended installation clearances around a RRU3931E.
Figure 1-3 Recommended installation clearances around a RRU3931E
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8

Figure 1-4 shows the minimum installation clearances around a RRU3931E.
Figure 1-4 Minimum installation clearances around a RRU3931E
1.3 Unpacking Inspection
This section describes how to unpack and check the delivered materials to ensure that all the
materials are included and intact.
Prerequisites
NOTICE
After a RRU3931E is unpacked, power it on within 24 hours. If the RRU3931E is powered
off for maintenance, restore power to it within 24 hours.
Context
NOTE
When transporting, moving, or installing the equipment, components, or parts, you must:
lPrevent them from colliding with doors, walls, shelves, or other objects.
lWear clean gloves, and avoid touching the equipment, components, or parts with bare hands, sweat-
soaked gloves, or dirty gloves.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
9

Procedure
Step 1 Check the total number of articles in each packing case against the packing list.
If... Then...
The total number tallies with the packing
list
Go to Step 2
The total number does not tally with the
packing list
Find out the cause and contact the local
Huawei office.
Step 2 Check the exterior of each packing case.
If... Then...
The outer packing is intact Go to Step 3.
The packing case is severely damaged or
soaked
Find out the cause and contact the local
Huawei office.
Step 3 Check the type and quantity of the equipment in each packing case against the packing list.
If... Then...
The type and quantity tallies with the
packing list
Sign the Packing List with the customer.
There is any shipment shortage or wrong
shipment
Fill in and submit the Cargo Shortage and
Mishandling Report.
There is damaged shipment Fill in and submit the Article Replacement
Report.
NOTICE
To protect the equipment from damage, keep the unpacked equipment and packing materials
indoors. To help find out the cause of any damage in the future, take photos of the storeroom,
rusted or eroded equipment, packing cases, and packing materials, and then file the photos.
----End
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
10

1.4 Obtaining the SN
This section describes how to obtain the serial number (SN) of a RRU3931E. Before
installing the RRU3931E, record its SN for future use during commissioning.
Context
The SN uniquely identifies a device and is required during commissioning. The SN label of a
RRU3931E is attached to the surface of the RRU3931E.
Procedure
Step 1 Remove the backup SN label from the surface of the RRU3931E. See Figure 1-5
NOTE
Before removing the backup SN label, photograph it.
Figure 1-5 Removing the SN label
(1) Backup SN label -
Step 2 Record the SN by using the template described in section 1.11.7 SN Collection Template,
and report it to the RRU3931E commissioning personnel.
----End
1.5 Installation Process
This section describes the process for installing a RRU3931E.
The process includes:
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
11

lInstalling a RRU3931E
lInstalling cables
lChecking the hardware installation
lPerforming a power-on check
Figure 1-6 outlines the process for installing a RRU3931E.
Figure 1-6 Process for installing a RRU3931E
1.6 Installing a RRU3931E
This section describes the procedure and precautions for installing a RRU3931E.
1.6.1 Mounting Kits
This section describes the kits for mounting a RRU3931E on a pole or wall.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
12

Slim Attachment Plate
Figure 1-7 shows the appearance of a slim attachment plate.
Figure 1-7 Slim attachment plate
(1) RRU3931E (2) Slim attachment plate
Mounting Bracket
Figure 1-8 shows the appearance of a Mounting bracket.
Figure 1-8 Mounting bracket
(1) Hole for a fastening
screw
(2) Mounting hole for an
expansion bolt
(3) Mounting hole for a steel
belt
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
13

1.6.2 Installing a RRU3931E on a Pole
This section describes the procedure and precautions for installing a RRU3931E on a pole.
Procedure
Step 1 Route two steel belts separately through the up and down mounting holes on the Mounting
bracket, but do not route the steel belts through the buckles. See Figure 1-9.
Figure 1-9 Routing steel belts
(1) Visible window
NOTE
Before installing a steel belt, check the rotation axis from the visible window. If the rotation axis is not
connected to the end of the bolt, loose the bolt and adjust the rotation axis to the end of the bolt. The
position of the rotation axis is shown in Figure 1-11.
Step 2 Fit the Mounting bracket onto the target pole. See Figure 1-10.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
14

Figure 1-10 Fitting the Mounting bracket onto the target pole
NOTE
Redundant steel belts must be bound.
1. Open the bolt on each steel belt according to the arrow direction on the mounting base,
and ensure that the rotation axis is connected to the end of the bolt, as shown in Figure
1-11.
Figure 1-11 Position of the rotation axis
2. Partially tighten each steel belt with the force not less than 50 N, bend it by 180°, and
press the steel belt at turns firmly. See Figure 1-12.
Figure 1-12 Tighten steel belts
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
15

3. Restore the bolt in position on the mounting base of the steel belt. See Figure 1-13.
Figure 1-13 Restoring the bolt in position on the mounting base
4. Use an M6 hex key screwdriver to torque the bolts to 7 N·m.
Check the steel belt installation status from the visible window. If the rotation axis is close to
the end of the bolt, remove the steel belt and fasten it again. See Figure 1-13.
Figure 1-14 Check the rotation axis status
(1) Rotation axis
Step 3 Fit the RRU3931E onto the Mounting bracket, and use an M6 hex key screwdriver to torque
the screw to 5 N·m. See Figure 1-15.
RRU3931E
Installation Guide 1 RRU3931E Installation Guide
Issue Draft A (2016-03-30) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
16
Other manuals for RRU3931E
1
Table of contents
Other Huawei Receiver manuals
Popular Receiver manuals by other brands

Keysight Technologies
Keysight Technologies N4917BSCB 400G user guide

Boss Audio Systems
Boss Audio Systems ELITE BV765B owner's manual

Autel Robotics
Autel Robotics Live Deck 2 user guide

Technics
Technics SA-GX670 Service manual

DEVA Broadcast
DEVA Broadcast DB3011 Maintenance and operation instruction manual

Harman Kardon
Harman Kardon AVR 745 Service manual

Yamaha
Yamaha RX-V667 Service manual

Cambridge Audio
Cambridge Audio CXR120 owner's manual

Onkyo
Onkyo Integra TX-DS898 instruction manual

Meccanica Fadini
Meccanica Fadini Birio 868 Quick reference card

Hall Research Technologies
Hall Research Technologies URA user manual

Marantz
Marantz SR-8001 specification