Hydro systems Metro Collection User manual

1
INSTRUCTIONS PERTAINING TO A RISK OF FIRE, ELECTRIC SHOCK, OR INJURY TO PERSONS.
READ AND FOLLOW ALL INSTRUCTIONS
1. DANGER: To reduce the risk of injury, do not permit children to use this unit unless they are closely supervised at all times.
2. Use this unit only for its intended use as described in this manual. Do not use attachments not recommended by the
manufacturer.
3. Never drop or insert any object into any opening.
4. Do not operate this unit without the cover over the suction fitting.
5. The unit must be connected only to a dedicated electrical supply circuit that is protected by a Ground Fault Circuit
Interrupter (GFCI). The GFCI must be provided by the installer and should be tested on a routine basis by the homeowner.
To test the GFCI push the test button. The GFCI should interrupt power. Push the RESET button. Power should be restored.
If the GFCI fails to operate in this manner there is a ground current flowing, indicating the possibility of an electric shock.
Do not use the tub. Disconnect the power and have the problem corrected by a qualified service representative. Re-test
the GFCI, only when it is operating properly may the whirlpool tub be used.
6. A green colored terminal marked “Ground” is provided on the exterior of the control box. To reduce the risk of electric
shock, connect this terminal to the grounding terminal of your electrical service or supply panel with a conductor equivalent
in size to the circuit conductors supplying this equipment.
IMPORTANT SAFETY INSTRUCTIONS
INSTALLATION INSTRUCTIONS
USER MAINTENANCE INSTRUCTIONS
INSTALLATION INSTRUCTIONS
WARNING: WHEN USING YOUR HYDRO SYSTEMS TUB, BASIC PRECAUTIONS SHOULD BE FOLLOWED, SEE BELOW
•Read all instructions before proceeding with installation.
•Inspect the tub before installation. If any damage or defects are found, do not install the tub. If the tub is not the right
size, model or color do not install the tub. Contact tech support at 661-775-0686 or email [email protected]
•INSTALLATION OF A THE METRO COLLECTION BATHTUB MUST MEET ALL APPLICABLE CODES AND REGULATIONS.
IMPORTANT-
All tub and systems are thoroughly tested and inspected at the factory prior to shipment. However, it is possible for
damage to occur during shipment and installation. Such damage is not always readily visible. To maintain the warranty, it
is important to water test the tub, integral overflow and thermal system a minimum of 30 minutes for leaks during rough
inspection before enclosing the tub. Hydro Systems is not responsible for the cost to remove/reinstall a tub.
CARE AND CLEANING-
To assure a long lasting “like new” look on your Metro Collection bathtub we recommend the following easy
care procedures:
1) For normal maintenance, especially after use, clean with a soft cloth or sponge and a mild soap or liquid detergent.
2) DO NOT USE abrasives such as scouring compounds, scouring pads, steel wool or harsh chemicals on your
Hydro Systems bathtub. For deeper stains, hard scale deposits or any other cleaning or maintenance problem,
contact your Hydro Systems dealer.
SAVE THESE INSTRUCTIONS FOR LATER REFERENCE
WARNING: This product can expose you to chemicals including styrene, which is known to the State of California to cause
cancer. For more information, go to www.P65Warnings.ca.gov.

FREESTANDING INSTALLATION
(For exposed drain see Page 6)
PREPARATION
Note: Drain, waste locations, and trim options
vary by model.
Clean, level, and prepare the floor for installation.
Place the unit in the exact installed position on the floor
and trace the outline of the bath with a pencil or any
erasable marking (Figure 1). Templates for Freestanding
bathtubs come with the tub.
Determine the location of the drain pipe on the floor
by taking measurements of the drain and waste location
underneath the unit (Figure 2).
3
4
5
1
2
FIGURE 1
FIGURE 2
Using a blanket, cardboard, or other clean protective
surface, turn the unit on its side so that the unit is
properly supported during drain installation.
Clean the drain hole area in preparation of setting the
drain. The area should be dry and free of any debris.
The Metro Collection Tubs are manufactured from High-Quality HydroLuxe, a blend of both organic minerals
and the best in engineered composites. This blend combines a cast acrylic polymer for it’s benefits in durability
and bonding strength, and ATH which is derived from Bauxite Ore. Bauxite is an aluminum ore, found mostly in
tropical regions, and is the main source of aluminum. ATH is also natural fire-retardant. The nonporous surface
is able to prevent dirt from gathering and withstands stains better than the other materials. To keep this high
quality look on your Metro tub, please follow these instructions:
MATTE FINISH
• Remove dust with a soft damp cloth, for example; microfiber or calico cloths.
• Clean surface with water and any mild detergent or dish soap.
• For a more difficult stain such as oil, paint, ink or grease clean with rubbing alcohol and dry with a soft cloth.
• Please do not use any sharp objects because that might result in scratching the surface of the tub.
• Use 180 grit wet/dry sandpaper and clean it with a soft scrub.
GLOSS FINISH
• Clean with mild dish soap and water, any non abrasive product to clean high-gloss counter surfaces will work.
• Remove dust with a soft damp cloth, for example; microfiber or calico cloths.
• Clean oil, paint, ink or grease with rubbing alcohol and dry with a soft cloth.
• Avoid using abrasive cleaners, it is not safe to use these on your glossed product.
• Please do not use any sharp objects because that might result in scratching the surface of the tub.
Please do not use anything else other than what was instructed. Improper use can result in damage to the tub or
its finish and may void the warranty. Keep in mind, if you do end up damaging the tub, scratches can usually be
removed, buffed or polished out by an Authorized Hydro Systems Service Agent.
CLEANING INSTRUCTIONS
2
Please refer to www.hydrosystem.com for videos on how to install your bathtub and get specific dimensions on your
model bathtub

3
PREPARE TAIL PIECE
Drain waste vent must always be installed according to
local standard. Verify the placement of the bathtub before
drilling the hole for the drain waste vent.
Install 1½"rubber slip gasket over the drain body.
Thread in shoe.
Glue shoe to tail piece.
10
12
13
11
FIGURE 5
tail piece (shoe)
INSTALL DRAIN HARDWARE
Apply plumbers putty around the Drain Body and pass it
thrugh the drain hole (Figure 3).
Apply rubber gasket and slide it over the
bottom of the Drain Body (Figure 3)
Slide the rubber washer over the drain body.
Attach the drain Body to the ABS/ PVC Shoe fitting and
tighten until the Gasket has created a seal with the bottom
of the bathtub. DO NOT OVERTIGHTEN (Figure 4).
6
7
8
9
FIGURE 3
FIGURE 4
FIGURE 5
Please refer to www.hydrosystem.com for videos on how to install your bathtub and get specific dimensions on your
model bathtub

4
COMPLETE BATHTUB INSTALLATION
Fill tub with water to the overflow and then drain the tub
while inspecting the waste connections below the floor
for leaks. Access from below will be necessary for this step
(Figure 8).
17
FIGURE 8
FIGURE 6B
FIGURE 6A
INSTALL BATHTUB
Apply generous bead of adhesive or silicone to the
bottom of the tub supports (Figure 6A).
Then apply a bead of tub and tile caulk or silicone
around the edge of the base (Figure 6B).
16
14
15
FIGURE 7
Carefully set tub into position (Figure 7) and connect
the drain harware (previously installed).
Please refer to www.hydrosystem.com for specific dimensions on your model bathtub

5
FREE STANDING TUBS
GENERAL INFORMATION
•Rough In Dimensions – For critical dimensions, we suggest taking the measurements of the actual tub on site.
All printed specifications are +/- ½ inch and subject to change without notice.
•The tub must be level
BASIC INSTALLATION PROCEDURE
•Determine final location of the tub. Tub will sit on top of finished flooring.
•Ensure location is structurally sound, flat and level.
•Align the tub in a manner that the drain lines up with the P-trap in the floor. DO NOT LET THE TUB REST ON
THE DRAIN PLUMBING.
•Check the tub for level. It must be level end to end and side to side.
•Caulk the gap between the skirt and the floor.
SUPPLEMENTAL INSTALLATION INFORMATION
FIXTURES
•No Fixtures can be mounted on the tub deck. Floor and wall-mounted fixtures are required.
•Wall-Mounted – The position of the tub and the reach of the spout are critical. Pay special attention to the spout
reach when choosing your fixtures. Be careful to ensure the spout will extend out far enough to clear the tub deck
and the falling water will not hit too high up the side wall of the tub and splash.
•Floor-Mounted – Some freestanding fixtures must be anchored to the tub drain for stabilization.
•Remote Mounting Blower – Due to the limited space between the inner and outer shell on all of The Metro
Collection Freestanding tubs, the blower must be remote mounted. In addition to the air pipe there is one
electrical connections between the tub and the blower. The electrical connection and the air pipe exit through the
bottom end of the bath. It is always desirable to remote mount the air blower as close to the tub as possible to
minimize loss of heat. Pipe insulation may be used on the air line to minimize heat loss.
•It is not recommended that the blower be mounted over 8 feet away from the tub. The supplied wiring
between the tub and the blower is approximately 10 feet long.
•Remote blower locations – There are several locations where the blower can be located. There must be a GFCI
electrical outlet within 2 feet of the blower. The blower is approximately 9.25 inches long and 8 inches in diameter
and 5” high. Substantial ventilation is required to keep the blower from overheating and to supply the large volume
of air being sent to the tub. Never wrap insulation around the blower as this will cause the equipment to fail. The
best location is directly below the tub in the floor joists. This location keeps the distance short and offers easy access
from below. If the room below has a finished ceiling, there are many fixtures such as HVAC return that can be used to
camouflage the access panel in the ceiling. Other possible locations include an adjacent closet, vanity or a same
level attic. Every home is different and there may be other desirable locations. Keep in mind that the blower must be
accessible for any future servicing.
•Remote Blower Kit – If the blower is not mounted directly adjacent to the tub, a remote blower kit will be required.
The kit consists of: extension pipe, couplings and cable. Please indicate the necessary length of pipe and cable re
quired.
THERMAL AIR
ELECTRICAL REQUIREMENTS:
WARNING: When using electrical products, basic precautions should always be followed, including the folowing:
DANGER: RISK OF ELECTRICAL SHOCK. Connect only to a circuit protected by a ground fault circuit interrupter. Grounding is
required. All electrical connections should be made by a licensed electrician. Installation of Hydro Systems bathtubs must meet
all applicable codes and regulations.
– 1 HP Blower - A dedicated 120v 20 amp GFCI protected electrical circuit is requirred for tubs with the standard 1 HP 120v Blower.
Table of contents
Other Hydro systems Bathtub manuals
Popular Bathtub manuals by other brands

Whirlpool
Whirlpool Ariel ARL-702 installation manual

Kohler
Kohler K-1151 Homeowner's guide

American Standard
American Standard 3052OD.X0X Installation instructions and owner's manual

Kohler
Kohler K-1111-H2 Roughing-In Guide

Kohler
Kohler K-1158 Roughing-In Guide

Kohler
Kohler Hourglass K-1209-LA Roughing-In Guide