
Add-On
Upright Frame
STEP 1
STEP 2
Continue the installation by attaching each
add-on section. Using (4) 1/4-20 1/2” bolts
attach top and bottom pans to the add-on
right hand side upright frame. Ensure upright
is positioned correctly by top indicator. Using
(4) 1/4-20 1/2“ bolts attach left side of add-on
to right side of starter unit. Repeat these
steps for each remaining add-on unit.
Begin by choosing your assembly location
carefully. As the entire rack will be quite
cumbersome to move once partially
assembled. You will be required to access
the back of the rack sections to install the
back panels. Keep this in mind when
choosing where to begin your assembly.
Begin by attaching the universal
top/bottom pans to your first set of
uprights. The top of the upright is
identified by the small hole on the face of
the upright (as indicated on illustration).
Bolt (4) 1/4-20 1/2” Flange head bolts into
the pre installed nuts on ends of the
univeral top/bottom pans as shown.
Repeat for oposite side upright.
1/4-20 x 1/2”
Flange Head Bolt
Upright Frame
Upright Frame
Universal
top/bottom
Universal
top/bottom
x8
Upright Top
Indication Punch
1/4-20 x 1/2”
Flange Head Bolt
x8 (per add-on unit)
Continue the installation by attaching each
add-on section. Using (4) 1/4-20 1/2” bolts
attach top and bottom pans to the add-on
right hand side upright. Using (4) 1/4-20 1/2“
bolts attach left side of add-on to right side of
starter unit. Repeat these steps for each
remaining add-on unit.
Install the end panels by positioning the
panel as shown and resting the weight of the
panel on the ground. With 2 people, lift the
panel slightly off the ground to catch the
formed steel hook into the square holes in
the upright. This may take a couple attempts
to ensure all hooks are engaged. Secure the
end panels through the attachment holes
using the provided (6) #8 x 5/8” Machine
screws and lock nuts.
Starter Unit Universal
top/bottom