3 HARDWARE OPERATING INSTRUCTIONS
3.1 Camera positioning
Mount the DUT on the mounting bracket of the iQ-Align XL. You can use the attached ¼” screw
or any other screw up to a diameter of 6.5 mm.
To position the DUT, loosen the locking wheel and manually guide the DUT to the desired
position. To secure the DUT at its new position, simply tighten the locking wheel again.
In addition to the range of the hydraulic arm, you can move the adjustable slider along the z-
axis. The slide is adjusted in a similar way: loosen the plastic wing screw on the right-hand side
of the iQ-Align XL, then move the slide and tighten the screw again.
Attention: To avoid damaging your setup please make sure you are holding the DUT when
loosening the locking wheel, as the hydraulic arm will collapse when pressure is released.
4 ADDITIONAL INFORMATION
4.1 Disposal instructions
After the service life of iQ-Align XL, it must be disposed of properly. Observe your national
regulations. Make sure that iQ-Align XL cannot be used by third parties after disposing of it.
Contact Image Engineering if assistance for disposal is required.
5 TECHNICAL DATA SHEET
See annex for the technical data sheet. It can also be downloaded from the Image Engineering
website: www.image-engineering.com.