IPinium Tina 1200BU User manual

Contents Page
General instructions 3
Installation 4
Electrical connection 4
Water and drainage connection 4
Refrigerant connection 4
Testing 4
Technical specification 5-6
Thawing cabinet
Tina 1200BU
DOC.NO. ST0 9182-02
EDITION 12014.05

2
Producer: SteelTech i Alingsås AB. Lärkvägen 4. SE-441 40 Alingsås. Sweden
Phone: +46 322 668930 . Fax: +46 322 10870

3
Installation instructions
General instructions
If the instructions in this and other documentation for
the equipment are not followed, it could endanger safety
and void the supplier’s guarantee and liability for the
product.
· Read the instructions in this document carefully,
since they contain important safety information about
installation, operating reliability, use and maintenance
of the product. Keep these instructions in a handy
place so that they are accessible to all users.
· Installation and testing must be carried out by techni-
cians who are trained for such work, and in accord-
ance with the manufacturer’s instructions.
· The product must be installed and connected to the
necessary services in accordance with the relevant
standards and directives.
· All servicing, maintenance and repairs must be car-
ried out by technicians who are trained for such work.
Use only original spare parts. See the Service In-
structions* and Spare Parts Catalogue*.
· This product may only be operated and looked after
by trained personnel (operators).
* Not supplied. May be ordered from the manufacturer or manufac-
turer’s representative.
CE directives
Tina 1200BU has been manufactured in accordance
with EU directives LVD 2006/95/EG, EMC 2004/108/EG
and is CE-marked.
Safety instructions
· Switch off the power before attempting to rectify
faults or operating failures in the cabinet.
– Turn the Selector switch to position 0. (See Opera-
tion maunal)
– Wait approximatly 3 minutes to give the electrical
cooling valve time to close completely.
– Switch off “Main circuit breaker” (NOT included in
the delivery).
Warning! Electricity!
A warning sign indicates the electrical cabinet.The door
of the electrical cabinet and other cover panels may
only be opened by technicians who are trained for such
work.
Warning!
·DO NOT rinse the thawing cabinet EXTERNALLY.
· If water comes into contact with live components it
could be fatal. Always take care when cleaning, es-
pecially when close to electrical components.
· Use a damp cloth for cleaning.
Warning!
Note that the thawing cabinet’s internal plates can be-
come hot during the cleaning programme and as a re-
sult cause injury if touched.
It is also important to take care when opening the cabi-
net door. Heat escapes and can cause injury.
Technical data
Rating plate
Rating plates stating the machine’s serial number are
attached at the bottom of the thawing cabinet’s left side
and the rear of the electrical cabinet, as well as on the
EU declaration which accompanies the machine on de-
livery.
Noise level: <70 dB A
Enclosure class: IPX4

4
Installation
Placement
Leave the packaging on the cabinet during handling until
the cabinet is in place. (This is to reduce the risk of
damage to the large side panels.) The floor under the
cabinet may have a drop of max. ±1°. The cabinet
should be positioned so that the waste water can flow
freely from the discharge pipe to the drain in order to
minimise the risk of slipping. Check that the cabinet is
stable.
Note: the cabinet shall be welded on to a founda-
tion. Make sure that the cabinet is installed in level
and that the door closes in a proper way after
welding.
Electrical connection
Electrical connection work must be carried out in ac-
cordance with all relevant standards and regulations.
On installation, the machine must be connected via a
main circuit breaker to keep it separate from the mains,
with a break length of at least 3 mm. Not included in
the delivery.
· Check the rating plate to ensure that the machine’s
operating voltage matches the mains voltage.
· Check that the distribution box is capable of carrying
the required current and that it is adequately earthed.
· Both the power and pilot circuit (where appropriate)
should be fused.The fuses should have the required
rated current in order to deliver the required power to
the cabinet.
· The connection cable must have suffitient length in
order to be able to fold the electrical box forward.
· If you are in any doubt about the effectiveness of the
earthing provisions then the installation must be
checked by a qualified electrician.
· Connect the electrical cables as indicated by the
cable markings and wiring diagram.
· The connection cable must be oil resistant, class
H07RN-F.
· Once the machine has been connected and switched
on, you should check that the mains voltage does
not fluctuate more than 10% from the rated voltage.
Water connection
Cold water with min. pressure 100 kPa (1 bar), max.
pressure 700 kPa (7 bar) and min. flow capacity 0.1 m3/h.
DN15 (G 1/2”) int. thread. Incoming water pipe should
be fitted with a shut off valve. Connected water should
be decalcified.
Basic adjustment of the radiator coupling
Open the valve extremely little. The flow have to be 1 l /
min.
Drainage connection
The cabinet should be placed so that the discharge wa-
ter can flow freely from the discharge pipe to the floor
drain or some other drainage system.
Brine cooling connection
Connect the fluid pipes Ø22 to the brine cooling system
. The installation should be designed to allow effective
ventilation. Make sure that suffitient Brine flow is
reached. for example: Hycool 45: min. 360l/h at Brine
temp. 14°F (-10°C)
Testing
The Selector switch in position 1:
· Both fans start at low speed..
· The steam generator is emptied, before being refilled.
· After 5 min. voltage is supplied to the cooling cir-
cuit’s solenoid valve and the cabinet temperature is
lowered to 36°F(+2°C).
The Selector switch in the cleaning position:
· Both fans start at high speed.
· The steam generator is emptied, before being refilled.
· The steam generator and the air heater start to give
off heat.
Note! The Selector switch should be allowed to stand
for at least 3 min. in one position before being
changed to the other. (See Operation manual)
Accessories
See the Operation manual.
Other documentation
Manufacturer’s Declaration
Operation manual
Electrical diagram
Refrigeration flow chart
Service Instructions*
Spare Parts Catalogue*
* Not supplied. May be ordered from the manufacturer or manufac-
turer’s representative.

5
12
5
8
10 7
1
2
3
4
5
4
9
9
6
Return pipe Ø 22
Water connection DN15 (G 1/2”) int. thread
Electrical connection
Drainage
Inlet pipe Ø 22
1
2
3
4
5
Display, Target temperature
6
7
Selector switch, Cleaning-0-Thawing
Deliming tube
8
9
Display, Cabinet temperature
Key switch, deliming
10

6
Technical specification
Model S503502301 S503512301
Mains voltage 400/440 V ~3 60 Hz. 400/440 V ~3 60 Hz.
Cooling system Brine Brine
Total Power - kW 4 4
Compressor output - kW _ _
Max. phase current - A 8.1 8.1
Productivity per cycle - kg 150 150
Refrigerant _ _
Refrigerant weight - g _ _
Cooling Power - kW 1.5 1.5
Evaporation temperature - °C _ _
Total weight - kg 250 250
Volume - litre 1200 1200
Door hung Right Left

7
Table of contents
Popular Commercial Food Equipment manuals by other brands

Festive
Festive Somerset SD12 Installation and operating manual

Diamond
Diamond G17/4BFE8-AGA instructions

ISA
ISA GELATOSHOW 2 Use and maintenance manual

Diamond
Diamond FLAV-R-SAVOR FSHC-6W Series Installation and operating manual

Duke
Duke DK-FRY-27-S Installation and operation manual

ITV
ITV CD Series Technical manual