IST ISTpure SR30-30V User manual

2022-06-17
INSTALLATION GUIDE
INNOVATION AND LEADING TECHNOLOGY
SOLVENT RECYCLERS
SR30-30V & SR60-60V

2
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
TABLE OF CONTENTS
Page
GENERAL SAFETY......................................................................................................................3
TOOLS REQUIRED FOR INSTALLATION OF VACUUM................................................................4
OPTION VACCUM : LIST OF PARTS INCLUDED IN THE KIT .......................................................7
OPTION VACCUM : PARTS TO ASSEMBLE.................................................................................8
OPTION VACCUM : INSTALLATION OF SOLENOID VALVE ........................................................9
OPTION VACCUM : INSTALLATION OF SOLENOID VALVE CONT’D...................................... 10
OPTION VACCUM : INSTALLATION OF SOLENOID VALVE END............................................ 11
OPTION VACCUM : INSTALLATION FOR VACUUM GENERATOR............................................. 12
OPERATION STEPS FOR THE SOLVENT RECYCLER ................................................................. 12
OPERATION STEPS FOR THE SOLVENT RECYCLER CONT’D................................................. 13
SECTION 8 TROUBLESHOOTING .......................................................................................... 14
SECTION 9 RECYCLER MAINTENANCE................................................................................. 14
SECTION 9 RECYCLER MAINTENANCE CONT’D ................................................................ 15
GENERAL ARRANGEMENT .................................................................................................. 16, 17

3
SR30-60 & SR30V-60V Installation guide
GENERAL SAFETY
Before operating the ISTpure Solvent Recycler, read this Instruction Manual completely. ISTpure products are
engineered and manufactured to the highest performance standards and have been subjected to detail testing
before shipment from the factory.
2 3 4
5 6 7 8
1
1. Presence of flammable vapors and solvents
2. No smoking or metal grinding nearby
3. Keep away from open flames
4. Wear breathing mask
5. Observe warnings at all times.
6. Read the Instruction Manual carefully.
7. Wear solvent-proof rubber gloves.
8. Wear protective eyewear before use.
DANGER AND WARNING LABELS

4
SR30-60 & SR30V-60V Installation guide
TOOLS REQUIRED FOR INSTALLATION OF VACUUM
Hex 5/16 Screw Driver
Flat 1/8’’ screw driver
Flat Screw Driver or Snips for removal of Staples
Teon Tape
Adjustable Wrench

5
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
TOOLS REQUIRED
Phillips Screw Driver for all Screws on The Unit Flat Screw
Driver or Snips for Removal of Staples Robertson Square
Screw Driver for Pallet Screws Teon
Tape Adjustable Wrench.
PARTS REQUIRED
•Hose and Fittings for connection to Regulator
•Disconnect per classication area (See General
Arrangement Drawings)
-220 Volt 1 Phase Power
-5 - 6 Ft from units at least
-18” above the ground
UNPACKAGING THE UNIT
Step 1 : Carefully inspect the shipping carton for any signs
of transport damage.
Step 2 : Begin by removing the staples attaching the box to
the skid (A Flat Screw Driver or Snips will do the job).
Step 3 : Carefully remove your solvent recycler from the
shipping carton. Remove the four screws from the bottom of
the solvent recycler screwed to the palette.
Step 4 : Remove the unit from the palette and place it in the
general area for installation.
Option vacuum : unpack the unit and assemble it on its
support with the provided bolts.
You are ready to begin with the installation of the
solvent recycler.
UNPACKING UNITS
Vacuums

6
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
ELECTRICAL CONNECTION
Step 5 : Now we are ready to have the electrician wire the solvent
recycler for model SR30 connect to 220 volts / 1 phase power to
the electrical junction box 1 that is provided in the back of the
unit. The 7.5 gallons recycler requires 15 Amp service.
for model SR60 connect to 220 volts / 1 phase power to the
electrical junction box that is provided in the back of the unit.
The 15 gallons recycler requires 30 Amp service.
Then connect a ground wire 2to the back of the unit ans use
the ground wire with a clip to ground the 55 gallons drum.
For units that come with the optional used solvent ll pump you
will need to connect with an ½ air line to the pump and suggest
to put a lter regulator before the air inlet of the pump and then
adjust the air pressure on the regulator to 80 PSI.
Note : Please Review the “General Arrangement”
Drawing
.
MAKE SURE ALL CODE REQUIREMENTS
ARE FOLLOWED
.
You are now ready to
follow the Start-up Process.
Please follow the ISTpure Start-up
2
1
SR30 & 60 INSTALLATION

7
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
OPTION VACCUM : LIST OF PARTS INCLUDED IN THE KIT
2
1
8
5
9
3
# STOCK DESCRIPTION QUANTITY
1324562 FILTER & REGULATOR 1
2911021 AIR GAUGE: 0 – 160 psi 1
3632202 CLOSE NIPPLE ¼’’ 1
5324560 90° PUSH IN FITTING 2
6324003 SOLENOID VALVE 1
7A 324503 BRASS BULK HEAD FITTING 1/4’’T x 1/4’’ FTP 1
7B 324502 BRASS BULK HEAD FITTING UNION 1/4’’ 1
8323135 ALUMINUM ½’’ CLOSE NIPPLE 1
9324571 POLYURETHANE BLUE TUBING 5’
6
7A
7B

8
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
OPTION VACCUM : PARTS TO ASSEMBLE
2
1
7A
7B
3
6
1. Air regulator assembly : put Teon tape where required. Remove plug on the regulator 1and screw gauge
2 on. Then put close nipple ¼’’ 3on regulator with bulkhead push in tting 7A
2. Install close nipple 8on solenoid valve 6.
3. Plug the nylon white hose‘‘to vacuum’’ to the bulkhead push in tting 7B
8
Head recycler panel
To
vacuum
Customer
air inlet
Air
inlet

9
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
OPTION VACCUM : INSTALLATION OF SOLENOID VALVE
A
B
C
D
1. Remove screws for top cover A.
2. Open top cover.
3. Open cover Bfrom ex proof box.
4. Remove the ½ plug Con the box.
5. Install the solenoid valve D

10
SR30-60 & SR30V-60V Installation guide
BEYOND THE SURFACE
E
OPTION VACCUM : INSTALLATION OF SOLENOID VALVE CONT’D
G
F
G
H
6. Install the 2 push in ttings
E
on the solenoid valve.
Then install the 2 bulk head F
and
G
ttings. Note : the one with
the regulator ( G
)
is on the left side.
7. Install blue hose G
from the bulk head of the pressure regulator
to the air inlet of the solenoid valve then install the other hose
between the outlet of the solenoid and the signal out to the
vacuum tank.
8. Install the 2 red wires H
from the solenoid valve on the relay as
shown.
This manual suits for next models
1
Table of contents
Other IST Industrial Equipment manuals


















