
1
12
2
2
3
3
6
7
8
10
4
5
12
2
10
9
9
9
9
>1.2V
<50
Ω
(6). Diode measurement and Continuity test
Range Open voltage Beeper
Overload protection: 250V DC/AC RMS
Content
Ⅰ、Feature
Ⅱ、Safety Precaution
Ⅲ、General Descripetion
Ⅳ、Operation instruction
V、General specification
Ⅵ、Technological specification
Ⅶ、Service and Maintenance
4-1. DC voltage measurement
4-2. AC voltage measurement
4-3. DC current measurement
4-4.AC current measurement
4-5. Resistance measurement
4-6. Diode measurement and continuity test
4-7. Data hold
4-8. Max. Value Hold
4-9. Auto shut-off
4-10. Circuit protection
Ⅶ、Service and Maintenance
(1). The instrument is a precise measuring instrument. Please avoid
to using it in strong magnetic field, dusty atmosphere and corrosive
area so as to prolong the usage life.
(2). In order to guarantee accuracy, be no means, one should
enter when the instrument is in calibration condition or when its
internal circuit is being altered. Incase of calibration need, enter
website and proceed with panel calibration according to
instruction.
(3). Check battery level regularly. Remove the batteries if you
do not intend to use the unit for a long time.
(4). When changing battery, measurement of electricity should
be cut-off and instrument should be switched off. Remove the 2
screws from battery door and take away the old battery that needs
to be changed and renew with new.
(5). When cleaning the surface of instrument, it is advisable to
employ mild cleanser with a piece of dry cloth. Using hard and
corrosive matter with strong chemicals to clean instrument
surface is strongly forbidden.
(6). In case of spilt water or being soaked in water, normal
measurement should wait until water is dried up.