
Note: The carbon sheet in the above 3 pictures is bonded to the board,
only the upper half of the body is bonded,
and the lower half of the body is not bonded!
So far, the aircraft’s built-in reinforcement has been fully completed.
11. Assemble, rst take out the parts board in the picture, remove the corresponding
parts and glue them in the corresponding positions as shown in the picture.
After bonding, make the lower half of the fuselage and the horizontal fuselage
fake Group, glue after the fake group is correct.
Note Because this aircraft is a 4D vector version, you need to install the steering
gear before installing the lower half of the fuselage.
The steering gear rod length is: 135mm. The aileron chuck needs to be reamed
with the 1.6mm drill included in the accessories.
The following is the physical installation image.