JCM GLOBAL iVIZION Series User manual

© 2012, Japan CashMachine Co., Limited
Support: http://www.jcmglobal.com/en/contact/default.aspx Web-Site: http://www.jcmglobal.com
iVIZION®Series
Next-Generation Banknote
Acceptor Unit
Operation and Maintenance
Manual
(Revision 3)
P/N 960-100929R_Rev. 3 {EDP #148849}
Issue #4074-SME-01-03

This product document (hereinafter referred to as “Manual”) is fully covered by legal Copyrights owned by the Japan
Cash Machine, Co., Ltd., (hereinafter referred to as “JCM”) under Japanese laws and other Foreign Countries.
This Manual contains many copyrighted, patented or properly registered equipment items manufactured by JCM, that
are prohibited and illegal to duplicate, replicate, copy in whole, or in part, without the express authorization by JCM with
the following exceptions:
1. When an authorized JCM agency or distributor duplicates the Manual for sales promotion and/or service
maintenance of the product, or technical service personnel education as required; and
2. When an end user duplicates the Manual to maintain operation of the product or operate the product in general.
JCM retains all rights to amend, alter, change or delete any portion of this Manual in whole, or in part, or add items
thereto without notice regarding the product or its related products.
JCM is a registered trademark of Japan CashMachine Co, Limited. All other product names mentioned herein may be
registered trademarks or trademarks of their respective companies. Furthermore, ™, ®and © are not always mentioned
in each case throughout this publication.
Copyright © 2012 By Japan CashMachine Co, Limited
iVIZION® Series Next-Generation Banknote Acceptor Unit Operation and Maintenance Manual
International Compliance
• RoHS Directives
• UL & c-UL Marks
• CE Mark
• CB Scheme
• FCC & IC Directives
REVISION HISTORY
Rev №.Date Reason for Update Comment
A1-06-11
Initial Version
1 3-1-11 Section 7 Parts List Number Changes incorporated. Engineering
dictated changes
27-11-11
Additional Section 7 Parts List Number Changes incorp-
orated and LD Version information added.
Engineering
dictated changes
3 1-25-12 Added Specifications, installation information and Graphics
regarding the iVIZION LD Version Unit.
Engineering
dictated changes
or or or
File No. E142330, Subscriber 857947001, Vo.2
NO58326
See Below.
Issue #4074-SME-01-03
Contains Transmitter Module
FCC ID: VZQNRWA3
MODEL NO.: NRWA3
IC: 8285A-NRWA3
This device complies with Part 15 of FCC Rules and RSS-Gen of IC Rules. Operation is subject to the following two conditions:
(1) this device may not cause interference, and (2) this device must accept any interference, including interference that may
cause undesired operation of this device.
FCC WARNING
Changes or modifications not expressly approved by the party responsible for compliance could void the user’s authority to
operate the equipment.
FCC NOTICE
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC
Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated
in a commercial environment.
This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the
instructions, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely
to cause harmful interference in which case the user will be required to correct the interference at his own expense.
IC NOTICE
This class A digital apparatus complies with Canadian ICES-003.
Cet appareil numerique de la classe A est conforme a la norme NMB-003 du Canada.

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
i
iVIZION® Series
Next-Generation Banknote Acceptor Unit
Table of Contents Page
TOC
1 GENERAL INFORMATION.................................................................................. 1-1
Description.....................................................................................................................1-1
iVIZION Units................................................................................................................. 1-1
Model Number Specifications........................................................................................ 1-2
Type Descriptions .......................................................................................................... 1-2
Software Descriptions.................................................................................................... 1-2
Precautions.................................................................................................................... 1-2
User Cautions................................................................................................................ 1-2
Installation Cautions ..................................................................................................................1-2
Mounting, Dismounting & Transportation ..................................................................................1-3
Preventive Maintenance............................................................................................................1-3
Banknote Fitness Requirements ...............................................................................................1-3
Reference Paper Use Precautions............................................................................................1-3
Primary Features ........................................................................................................... 1-4
Component Names........................................................................................................ 1-4
Specification (iVIZION SS Version) ............................................................................... 1-5
Technical Specifications ...........................................................................................................1-5
Environmental Specifications ....................................................................................................1-5
Electrical Specifications.............................................................................................................1-6
Structural Specifications ............................................................................................................1-6
Specification (iVIZION LD Version)................................................................................ 1-7
Technical Specifications ............................................................................................................1-7
Environmental Specifications ....................................................................................................1-7
Electrical Specifications.............................................................................................................1-8
Structural Specifications ............................................................................................................1-8
iVIZION Entire Unit Outside Dimensions....................................................................... 1-9
iVIZION SS Version Installation/Maintenance Space Requirements........................... 1-10
iVIZION LD Specification Unit Dimensions.................................................................. 1-11
Various Cash Box Unit Dimensions............................................................................. 1-12
Standard Cash Box Outside Dimensions ................................................................................1-12
Large Cash Box Outside Dimensions .....................................................................................1-12
International Compliance............................................................................................. 1-13
Technical Contact Information ..................................................................................... 1-14
Americas & Oceania................................................................................................................1-14
JCM American ......................................................................................................................1-14
Europe, Africa, Russia & Middle East .....................................................................................1-14
JCM Europe GmbH ..............................................................................................................1-14
UK & Ireland ............................................................................................................................1-14
JCM Europe (UK Office) .......................................................................................................1-14
Asia .........................................................................................................................................1-14
JCM Gold (HK) Ltd. ..............................................................................................................1-14
Japan Cash Machine Co, Limited (HQ) ................................................................................1-14
2 INSTALLATION ................................................................................................... 2-1
Installation Process ...................................................................................................................2-1

Table of Contents
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
ii
Page
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
Cable Interconnection ................................................................................................... 2-2
DIP Switch Configurations............................................................................................. 2-2
Primary LED Indications ........................................................................................................... 2-2
Connector Pin Assignments .......................................................................................... 2-3
Connector Pin Assignments (Continued 1)............................................................................... 2-4
Connector Pin Assignments (Continued 2)............................................................................... 2-5
Connector Pin Assignments (Continued 3)............................................................................... 2-6
Connector Pin Assignments (Continued 4)............................................................................... 2-7
Connector Pin Assignments (Continued 5)............................................................................... 2-8
Preventive Maintenance................................................................................................ 2-8
Retrieving Banknotes................................................................................................................ 2-8
Clearing a Banknote Jam .........................................................................................................2-8
Cleaning Procedure....................................................................................................... 2-9
Sensor Cleaning Procedure...................................................................................................... 2-9
iVIZION Optional LD Version Unit Installation ............................................................... 2-9
iVIZION Sensor Locations........................................................................................... 2-10
Standard Interface Circuit Schematics .........................................................................2-11
Interface Circuit Schematics (Continued 1) ............................................................................ 2-12
Interface Circuit Schematics (Continued 2) ............................................................................ 2-13
Interface Circuit Schematics (Continued 3) ............................................................................ 2-14
Operational Flowchart ................................................................................................. 2-15
Operational Flowchart (Continued 1)...................................................................................... 2-16
Operational Flowchart (Continued 2)...................................................................................... 2-17
3 COMMUNICATIONS ............................................................................................ 3-1
Americas & Oceania ................................................................................................................. 3-1
JCM American........................................................................................................................ 3-1
Europe, Africa, Russia & Middle East....................................................................................... 3-1
JCM Europe GmbH................................................................................................................ 3-1
UK & Ireland ............................................................................................................................. 3-1
JCM Europe (UK Office)......................................................................................................... 3-1
Asia........................................................................................................................................... 3-1
JCM Gold (HK) Ltd. ................................................................................................................ 3-1
Japan Cash Machine Co, Limited (HQ).................................................................................. 3-1
4 DISASSEMBLY/REASSEMBLY .......................................................................... 4-1
Tool Requirements......................................................................................................... 4-1
Pusher Unit Timing Belt Removal.................................................................................. 4-1
Home Position Sensor Board/Home Position Sensor, FFC & Interface Connector
Board Removals............................................................................................................ 4-3
RFID Module & Harness Removals .............................................................................. 4-4
Validation CPU & Controller CPU Board Removals ...................................................... 4-4
USB FPC, Power FPC & Interface FPC Cable Removals ............................................ 4-4
Validation Unit Harness Removal.................................................................................. 4-5
Interrupter Board Removal ........................................................................................... 4-5
Motor Unit Timing Belt Removal.................................................................................... 4-5
Stacker Motor & Transport Motor Removals ................................................................. 4-6
Bezel Retainer Clips A & B Removal............................................................................. 4-6

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
iii
Page
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
Table of Contents
Sensor Transfer Board/CIS FFC/Transmissive Light FFC & Upper UV FPC Sensor
Removals....................................................................................................................... 4-6
Validation Sensor Board Assembly Removal ................................................................ 4-7
Validation Sensor FPC Cable Removals ....................................................................... 4-8
CIS/Transmissive Light & Upper UV Sensor Removals ................................................ 4-8
CIS/CIS FPC/Lower UV Sensor & Lower UV FFC Removal......................................... 4-9
Validation Unit Timing Belt Removal............................................................................ 4-10
Reassembly Cautions.................................................................................................. 4-10
5 WIRING DIAGRAMS............................................................................................ 5-1
iVIZION System Wiring Diagram................................................................................... 5-1
6 CALIBRATION AND TESTING............................................................................ 6-1
Download and Installation Workbench Tool Requirements ........................................... 6-1
Application Software Installation.................................................................................... 6-1
Driver Installation Procedure ......................................................................................... 6-2
JCM Tool Suite Standard Edition Mode ......................................................................... 6-3
Software Download Tool Requirements ....................................................................................6-3
Software Download Procedures .................................................................................... 6-4
Download the Upgrade Program ............................................................................................6-4
Downloading the Program First Time .....................................................................................6-5
Calibration .....................................................................................................................6-6
When to Calibrate......................................................................................................................6-6
Calibration Order ....................................................................................................................6-6
Calibration Tool Requirements ..................................................................................................6-6
Placing the KS-072 Reference Paper .......................................................................................6-7
Calibration Procedure................................................................................................................6-7
Calibration Only ......................................................................................................................6-7
Calibration Plus Serial Number Writing.................................................................................6-10
Performance Tests....................................................................................................... 6-10
Performance Test Tool Requirement using a PC .................................................................... 6-11
Performance Test Items using a PC........................................................................................ 6-11
PC Performance Test Preparation........................................................................................... 6-11
Performance Test Procedures.................................................................................................6-12
Any Motor Test......................................................................................................................6-12
LED Indicator Test ................................................................................................................6-12
Sensor ON/OFF Test ............................................................................................................6-13
Banknote Acceptance Test ...................................................................................................6-13
ICB Function Setting (Barcode Coupon) ..............................................................................6-14
DIP Switch ON/OFF Test ......................................................................................................6-14
Performance Test Tool Requirement using an External DIP Switch Box ................................6-15
External DIP Switch Performance Test Procedure Settings....................................................6-15
Performance Tests using the External DIP Switch Procedures...............................................6-15
iVIZION Utility Tools..................................................................................................... 6-16
ICB/Image Setting Tool Requirements ....................................................................................6-16
ICB/Image Setting Change Preparation ..................................................................................6-16
CIS Image Tool........................................................................................................................6-16
ICB Function Setting ...............................................................................................................6-17
Setting ICB Enable/Disable Functions..................................................................................6-17

Table of Contents
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
iv
Page
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
ICB Function Operational Condition ....................................................................................... 6-19
7 EXPLODED VIEWS & PARTS LISTS.................................................................. 7-1
iVIZION Entire Unit Exploded View ............................................................................... 7-1
iVIZION Entire Unit Parts List ................................................................................................... 7-2
iVIZION Validation Unit 1 Exploded View ...................................................................... 7-3
iVIZION Validation Unit 1 Parts List .......................................................................................... 7-4
iVIZION Validation Unit 2 Exploded View ...................................................................... 7-5
iVIZION Validation Unit 2 Parts List .......................................................................................... 7-6
iVIZION Validation Unit 3 Exploded View ...................................................................... 7-7
iVIZION Validation Unit 3 Parts List .......................................................................................... 7-8
iVIZION Transport Unit 1 Exploded View ...................................................................... 7-9
iVIZION Transport Unit 1 Parts List ........................................................................................ 7-10
iVIZION Transport Unit 2 Exploded View .....................................................................7-11
iVIZION Transport Unit 2 Parts List ........................................................................................ 7-12
iVIZION Transport Unit 3 Exploded View .................................................................... 7-13
iVIZION Transport Unit 3 Parts List ........................................................................................ 7-14
iVIZION Transport Unit 4 Exploded View .................................................................... 7-15
iVIZION Transport Unit 4 Parts List ........................................................................................ 7-16
iVIZION Transport Unit 5 Exploded View .................................................................... 7-17
iVIZION Transport Unit 5 Parts List ........................................................................................ 7-18
iVIZION Transport Unit 6 Exploded View .................................................................... 7-19
iVIZION Transport Unit 6 Parts List ........................................................................................ 7-20
iVIZION SS Version Frame Unit Exploded View ......................................................... 7-21
iVIZION SS Version Frame Unit Parts List.............................................................................. 7-22
iVIZION Cash Box Unit 1 Exploded View .................................................................... 7-23
iVIZION Cash Box Unit 1 Parts List ........................................................................................ 7-24
iVIZION Cash Box Unit 2 Exploded View .................................................................... 7-25
iVIZION Cash Box Unit 2 Parts List ........................................................................................ 7-26
iVIZION Cash Box Unit 3 Exploded View .................................................................... 7-27
iVIZION Cash Box Unit 3 Parts List ........................................................................................ 7-28
iVIZION LD Version Frame Exploded View................................................................. 7-29
iVIZION LD Version Frame Parts List ..................................................................................... 7-30
iVIZION Optional Components Exploded Views ......................................................... 7-31
iVIZION Optional Components Parts List .............................................................................. 7-32
8 INDEX ................................................................................................................... 8-1
A TROUBLESHOOTING......................................................................................... A-1
Introduction....................................................................................................................A-1
Troubleshooting Overview.............................................................................................A-1
Malfunction LED Error Codes........................................................................................A-1
LED Indication Conditions .............................................................................................A-1
Error, Jam and Reject Code Tables...............................................................................A-2
Jam Error Codes.......................................................................................................................A-4
Reject Error Code .....................................................................................................................A-5
Maintenance Equipment................................................................................................ A-6
iVIZION Maintenance Equipment ............................................................................................. A-6
Reference Paper Handling .......................................................................................................A-6
B GLOSSARY ......................................................................................................... B-1

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
v
iVIZION® Series
Next-Generation Banknote Acceptor Unit
List of Figures
Page
LOF
Figure 1-1 iVIZION Units ......................................................................................... 1-1
Figure 1-2 Precautionary Symbols .......................................................................... 1-2
Figure 1-3 Unacceptable Banknotes ....................................................................... 1-3
Figure 1-4 KS-072 Reference Paper Handling Precautions.................................... 1-3
Figure 1-5 iVIZION Component Names .................................................................. 1-4
Figure 1-6 iVIZION Banknote Acceptor SS Version Unit Outside Dimensions ....... 1-9
Figure 1-7 iVIZION SS Version Unit Installation and Maintenance Space
Requirements Diagram ........................................................................ 1-10
Figure 1-8 Maximum Gradient Angle = 50 Degrees.............................................. 1-10
Figure 1-9 iVIZION LD Version Unit Outside Dimensions ..................................... 1-11
Figure 1-10 iVIZION LD Version Unit with Bezel Outside Dimensions ................... 1-11
Figure 1-11 iVIZION Standard Cash Box Outside Dimensions............................... 1-12
Figure 1-12 iVIZION Large Cash Box Outside Dimensions .................................... 1-12
Figure 2-1 Interface Harness Installation Location.................................................. 2-1
Figure 2-2 M4 Screws Locations (Left/Right Side).................................................. 2-1
Figure 2-3 Flat Head Screws Locations (Rear Side) ............................................... 2-1
Figure 2-4 Cable Interconnection ............................................................................ 2-2
Figure 2-5 Retrieving Banknote............................................................................... 2-8
Figure 2-6 Open the Upper Guides ......................................................................... 2-8
Figure 2-7 Retrieving Cash Box Banknote Jam ...................................................... 2-9
Figure 2-8 Interface Harness Installation Location.................................................. 2-9
Figure 2-9 M3 Screws Locations............................................................................. 2-9
Figure 2-10 iVIZION Sensor Cleaning Locations .................................................... 2-10
Figure 2-11 iVIZION USB Circuit Interface Schematic Diagram ............................. 2-11
Figure 2-12 iVIZION Photo-Coupler Circuit Interface Schematic Diagram ............. 2-11
Figure 2-13 iVIZION RS232C Circuit Interface Schematic Diagram ....................... 2-12
Figure 2-14 iVIZION ccTalk Circuit Interface Schematic Diagram .......................... 2-12
Figure 2-15 iVIZION TTL Circuit Interface Schematic Diagram .............................. 2-13
Figure 2-16 iVIZION LED Circuit Interface Schematic Diagram.............................. 2-14
Figure 2-17 iVIZION SS/LD Banknote Acceptor Operational Flowchart (Part 1 -
Initializing) ............................................................................................ 2-15
Figure 2-18 iVIZION SS Banknote Acceptor Operational Flowchart (Part 2 -
Validating) ............................................................................................ 2-16
Figure 2-19 iVIZION LD Banknote Acceptor Operational Flowchart (Part 2 -
Validating) ............................................................................................ 2-17
Figure 4-1 Pusher Mechanism Screws Removal .................................................... 4-1
Figure 4-2 Pusher Mechanism Removal ................................................................. 4-1
Figure 4-3 Pusher Mechanism Cover Removal....................................................... 4-1
Figure 4-4 Stacker Guide Removal ......................................................................... 4-2
Figure 4-5 Stacker Guide Reassembly.................................................................... 4-2

List of Figures
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
vi
Page
iVIZION® Series Next-Generation Banknote Acceptor Unit
Figure 4-6 Right Frame Outer “R” Removal............................................................. 4-2
Figure 4-7 Left Frame Outer “L” Removal................................................................4-2
Figure 4-8 Timing Belt Removal .............................................................................. 4-3
Figure 4-9 TR Bottom Cover Removal..................................................................... 4-3
Figure 4-10 TR Side Cover “A” Removal................................................................... 4-3
Figure 4-11 Home Position Sensor Board, Home Position Sensor FFC Assembly
and Interface Connector Board Removals ............................................. 4-3
Figure 4-12 RFID Module & Harness Removal .........................................................4-4
Figure 4-13 CPU Board Module Removal ................................................................. 4-4
Figure 4-14 Extension Memory Board Removal........................................................ 4-4
Figure 4-15 Validation CPU Board and Control CPU Board Removal ...................... 4-4
Figure 4-16 Motor Module Removal .......................................................................... 4-5
Figure 4-17 USB FPC, Power FPC & Interface FPC Cable Removal ....................... 4-5
Figure 4-18 Validation Unit Harness Removal........................................................... 4-5
Figure 4-19 Interrupter Board Removal ..................................................................... 4-5
Figure 4-20 Timing Belt Removal .............................................................................. 4-5
Figure 4-21 Timing Belt Reassembly Path ................................................................4-6
Figure 4-22 Stacker & Transport Motor Removal ...................................................... 4-6
Figure 4-23 Bezel Retainer Chips A&B Removal ...................................................... 4-6
Figure 4-24 Upper Cover Removal............................................................................ 4-7
Figure 4-25 Sensor Transfer Board Assembly, CIS FFC, Transmissive Light &
Upper UV FPC Cable Removal .............................................................. 4-7
Figure 4-26 iVIZION Head Cover A Removal............................................................ 4-7
Figure 4-27 Validation Sensor Board Assembly Removal......................................... 4-7
Figure 4-28 Validation Sensor FPC Removal............................................................ 4-8
Figure 4-29 Validation Sensor FPC Reassembly ...................................................... 4-8
Figure 4-30 Upper Validation Part Removal .............................................................. 4-8
Figure 4-31 iVIZION Head BG85B Removal ............................................................. 4-8
Figure 4-32 CIS, Transmissive Light & Upper UV Sensor Removal.......................... 4-9
Figure 4-33 iVIZION BG 85A HEAD Removal........................................................... 4-9
Figure 4-34 Lower Validation Part Removal .............................................................. 4-9
Figure 4-35 CIS, CIS FPC, Lower UV Sensor & Lower UV FFC Removal.............. 4-10
Figure 4-36 Timing Belt Removal ............................................................................ 4-10
Figure 4-37 Timing Belt Replacement ..................................................................... 4-10
Figure 4-38 Upper/Lower UV Sensors Location ...................................................... 4-10
Figure 5-1 iVIZION System Wiring Diagram ............................................................ 5-1
Figure 6-1 Tool and Harness Connections .............................................................. 6-1
Figure 6-2 USB Cable Type Requirement ............................................................... 6-1
Figure 6-3 Setup.exe File Location.......................................................................... 6-1
Figure 6-4 Install Shield Wizard Screen................................................................... 6-1
Figure 6-5 Customer Information Screen................................................................. 6-2
Figure 6-6 Destination Folder Screen...................................................................... 6-2
Figure 6-7 Current Settings Confirmation ................................................................ 6-2
Figure 6-8 Installation Completion Screen............................................................... 6-2

List of Figures
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
vii
iVIZION® Series Next-Generation Banknote Acceptor Unit
Page
Figure 6-9 Hardware Update Wizard Screen 1 ........................................................6-2
Figure 6-10 Hardware Update Wizard Screen 2 ........................................................6-3
Figure 6-11 Hardware Update Wizard Screen 3 ........................................................6-3
Figure 6-12 Hardware Update Wizard Screen 4 ........................................................6-3
Figure 6-13 Normal Mode Selection ..........................................................................6-3
Figure 6-14 Test Mode Selection ...............................................................................6-3
Figure 6-15 Required Software Download Tools .......................................................6-3
Figure 6-16 DIP Switches All OFF .............................................................................6-4
Figure 6-17 JCM Tool Suite Standard Edition Screen ...............................................6-4
Figure 6-18 JCM Tool Suite Standard Edition Screen Pull-Down Menu....................6-4
Figure 6-19 Browse Screen Button Location .............................................................6-4
Figure 6-20 iVIZION Software Program Selection .....................................................6-4
Figure 6-21 Download Progress Screen 1 .................................................................6-5
Figure 6-22 Download Completed Screen 1 ..............................................................6-5
Figure 6-23 DIP Switches 6, 7, & 8 ON......................................................................6-5
Figure 6-24 JCM Tool Suite Standard Edition Screen 2 ............................................6-5
Figure 6-25 JCM Tool Suite Standard Edition Screen Pull-Down Menu 2.................6-5
Figure 6-26 Browse Screen Button Location .............................................................6-5
Figure 6-27 iVIZION Software Program Selection .....................................................6-6
Figure 6-28 Download Progress Screen 2 .................................................................6-6
Figure 6-29 Download Completed Screen 2 ..............................................................6-6
Figure 6-30 Remote Calibration Tools Required........................................................6-7
Figure 6-31 Reading KS-072 Reference Paper .........................................................6-7
Figure 6-32 Reference Paper Setting 1 .....................................................................6-7
Figure 6-33 Reference Paper Setting 2 .....................................................................6-7
Figure 6-34 DIP Switch #8 ON...................................................................................6-7
Figure 6-35 JCM Tool Suite Standard Edition Screen 3 ............................................6-7
Figure 6-36 iVIZION Calibration Ver.X.XX Screen.....................................................6-8
Figure 6-37 Feed-Out Calibration Proceeding Screen...............................................6-8
Figure 6-38 Calibration Information Screen 1 ............................................................6-8
Figure 6-39 Calibration Information Screen 2 ............................................................6-8
Figure 6-40 Pusher Plate Release Location ..............................................................6-8
Figure 6-41 Cardboard Setting Location ....................................................................6-8
Figure 6-42 Exit Calibration Proceeding Screen ........................................................6-9
Figure 6-43 Calibration Information Screen 3 ............................................................6-9
Figure 6-44 UV Calibration Proceeding Screen .........................................................6-9
Figure 6-45 Calibration Information Screen 4 ............................................................6-9
Figure 6-46 Calibration Information Screen 5 ............................................................6-9
Figure 6-47 CIS Calibration Proceeding Screen ........................................................6-9
Figure 6-48 Calibration Information Screen 6 ............................................................6-9
Figure 6-49 Calibration Value Writing Screen..........................................................6-10
Figure 6-50 Calibration Complete Screen................................................................6-10
Figure 6-51 iVIZION Calibration Service Suite Edition Screen ................................6-10
Figure 6-52 Setting Manufacture No. Screen...........................................................6-10

List of Figures
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
viii
Page
iVIZION® Series Next-Generation Banknote Acceptor Unit
Figure 6-53 Calibration Value Writing Screen ......................................................... 6-10
Figure 6-54 Adjustment Info Screen 8 ..................................................................... 6-10
Figure 6-55 PC Performance Test Tools Required ................................................. 6-11
Figure 6-56 DIP Switch #8 Set ON .......................................................................... 6-11
Figure 6-57 JCM Tool Suite Standard Edition Screen............................................. 6-11
Figure 6-58 iVIZION Test Item VerX.XX Screen ..................................................... 6-11
Figure 6-59 Start, Stop & Exit Screen Button .......................................................... 6-12
Figure 6-60 Transport Motor Normal Forward Test Screen..................................... 6-12
Figure 6-61 LED Indicator Test Screen ................................................................... 6-12
Figure 6-62 Sensor ON/OFF Test Screen ............................................................... 6-13
Figure 6-63 Denomination Indication Location ........................................................ 6-13
Figure 6-64 ICB Function Test Screen .................................................................... 6-14
Figure 6-65 DIP Switch ON/OFF Test Screen 1...................................................... 6-14
Figure 6-66 DIP Switch ON/OFF Test Screen 2...................................................... 6-15
Figure 6-67 Calibration Tool Requirements............................................................. 6-15
Figure 6-68 ICB Setting Tool Requirements............................................................ 6-16
Figure 6-69 JCM Tool Suite Standard Edition ......................................................... 6-16
Figure 6-70 iVIZION Utility Tool Version X.XX for Suite Edition Screen 1............... 6-17
Figure 6-71 Empty CIS IMAGE Screen ................................................................... 6-17
Figure 6-72 Last Acceptance CIS IMAGE Screen................................................... 6-17
Figure 6-73 iVIZION Utility Tool Version X.XX for Suite Edition Screen 2............... 6-17
Figure 6-74 ICB Function Screen ............................................................................ 6-17
Figure 6-75 Enable Setting Completion................................................................... 6-18
Figure 6-76 Disable Setting Completion .................................................................. 6-18
Figure 6-77 ICB Current Status Screen................................................................... 6-18
Figure 6-78 Machine Number Setting...................................................................... 6-18
Figure 6-79 Machine Number Setting Completion................................................... 6-18
Figure 6-80 Machine Number Indication.................................................................. 6-18
Figure 6-81 Inhibit Screen Button Location ............................................................. 6-19
Figure 6-82 Inhibit Setting Completion .................................................................... 6-19
Figure 6-83 ICB System Status Indication............................................................... 6-19
Figure 7-1 iVIZION Entire Unit Exploded View Diagram.......................................... 7-1
Figure 7-2 iVIZION Validation Unit 1 Exploded View............................................... 7-3
Figure 7-3 iVIZION Validation Unit 2 Exploded View............................................... 7-5
Figure 7-4 iVIZION Validation Unit 3 Exploded View............................................... 7-7
Figure 7-5 iVIZION Transport Unit 1 Exploded View ............................................... 7-9
Figure 7-6 iVIZION Transport Unit 2 Exploded View ............................................. 7-11
Figure 7-7 iVIZION Transport Unit 3 Exploded View ............................................. 7-13
Figure 7-8 iVIZION Transport Unit 4 Exploded View ............................................. 7-15
Figure 7-9 iVIZION Transport Unit 5 Exploded View ............................................. 7-17
Figure 7-10 iVIZION Transport Unit 6 Exploded View ............................................. 7-19
Figure 7-11 iVIZION SS Version Frame Unit Exploded View .................................. 7-21
Figure 7-12 iVIZION Cash Box Unit 1 Exploded View............................................. 7-23
Figure 7-13 iVIZION Cash Box Unit 2 Exploded View............................................. 7-25

List of Figures
P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
ix
Page
iVIZION® Series Next-Generation Banknote Acceptor Unit
Figure 7-14 iVIZION Cash Box Unit 3 Exploded View............................................. 7-27
Figure 7-15 iVIZION LD Version Frame Exploded View.......................................... 7-29
Figure 7-16 iVIZION Optional Components Exploded Views .................................. 7-31
Figure A-1 Additional Maintenance Equipment Requirements.................................A-6

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
x
THIS PAGE INTENTIONALLY LEFT BLANK
iVIZION® Series Next-Generation Banknote Acceptor Unit List of Figures

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
xi
iVIZION® Series
Next-Generation Banknote Acceptor Unit
List of Tables Page
LOT
Table 1-1 iVIZION Model Number Specifications .................................................. 1-2
Table 1-2 iVIZION Type Number Specifications .................................................... 1-2
Table 1-3 iVIZION Software Number Specifications .............................................. 1-2
Table 1-4 iVIZION SS Version Technical Specification ......................................... 1-5
Table 1-5 iVIZION SS Version Environmental Specification.................................. 1-5
Table 1-6 iVIZION SS Version Electrical Specifications ........................................ 1-6
Table 1-7 iVIZION SS Version Structural Specifications........................................ 1-6
Table 1-8 iVIZION LD Version Technical Specification.......................................... 1-7
Table 1-9 iVIZION LD Version Environmental Specification .................................. 1-7
Table 1-10 iVIZION LD Version Electrical Specifications......................................... 1-8
Table 1-11 iVIZION LD Version Structural Specifications........................................ 1-8
Table 2-1 Denomination INHIBIT DIP Switch Settings .......................................... 2-2
Table 2-2 JCM Private Line DIP Switch Setting..................................................... 2-2
Table 2-3 Software DIP Switch Settings ................................................................ 2-2
Table 2-4 Serial Communications DIP Switch Settings ......................................... 2-2
Table 2-5 LED Error Pattern Indications ................................................................ 2-2
Table 2-6 iVIZION SS/LD USB Connection Pin Assignments ............................... 2-3
Table 2-7 iVIZION SS/LD Photo-Coupler Connector Pin Assignments ................. 2-4
Table 2-8 iVIZION SS/LD RS232C Connector Pin Assignments........................... 2-5
Table 2-9 iVIZION SS/LD ccTalk Connector Pin Assignments .............................. 2-6
Table 2-10 iVIZION SS/LD TTL Connector Pin Assignments .................................. 2-7
Table 2-11 iVIZION SS/LD Bezel JPL (CN7) Connection Pin Assignments ............ 2-8
Table 2-12 iVIZION Sensor Cleaning Location Types ........................................... 2-10
Table 6-1 iVIZION Sensor Calibration Order ......................................................... 6-6
Table 6-2 PC Performance Test Items................................................................. 6-11
Table 6-3 LED Indications for each condition ...................................................... 6-12
Table 6-4 Sensor Actions and Conditions............................................................ 6-13
Table 6-5 Denomination Valuation List ................................................................ 6-13
Table 6-6 Performance Test DIP Switch Settings................................................ 6-15
Table 6-7 ICB Setting Function Operational Condition ........................................ 6-19
Table 7-1 iVIZION Entire Unit Parts List ................................................................ 7-2
Table 7-2 iVIZION Validation Unit 1 Parts List ....................................................... 7-4
Table 7-3 iVIZION Validation Unit 2 Parts List ....................................................... 7-6
Table 7-4 iVIZION Validation Unit 3 Parts List ....................................................... 7-8
Table 7-5 iVIZION Transport Unit 1 Parts List ..................................................... 7-10

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
xii
iVIZION® SeriesNext-Generation Banknote Acceptor Unit
List of Tables
Page
Table 7-6 iVIZION Transport Unit 2 Parts List ..................................................... 7-12
Table 7-7 iVIZION Transport Unit 3 Parts List ..................................................... 7-14
Table 7-8 iVIZION Transport Unit 4 Parts List ..................................................... 7-16
Table 7-9 iVIZION Transport Unit 5 Parts List ..................................................... 7-18
Table 7-10 iVIZION Transport Unit 6 Parts List ..................................................... 7-20
Table 7-11 iVIZION SS Version Frame Unit Parts List .......................................... 7-22
Table 7-12 iVIZION Cash Box Unit 1 Parts List ..................................................... 7-24
Table 7-13 iVIZION Cash Box Unit 2 Parts List ..................................................... 7-26
Table 7-14 iVIZION Cash Box Unit 3 Parts List ..................................................... 7-28
Table 7-15 iVIZION LD Version Frame Parts List .................................................. 7-30
Table 7-16 iVIZION Optional Components Parts List ............................................ 7-32
Table A-1 LED Code Condition .............................................................................. A-1
Table A-2 LED Error Codes.................................................................................... A-2
Table A-3 Jam LED Flash Error Codes .................................................................. A-4
Table A-4 LED Reject Codes ................................................................................. A-5
Table A-5 Additional Maintenance Equipment Parts List ....................................... A-6

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-1
iVIZION® Series
Next-Generation Banknote Acceptor Unit
Section 1
This section provides a general overview of the
iVIZION®Next-Generation Banknote Acceptor
Series pictured in Figure 1-1. This first section is
designed to help you navigate through this guide
with ease and provides the following information:
• iVIZION®Unit
• Component Names
• Primary Features
• Model Description
• Type Description
• Software Description
• Precautions
• Specifications
• Unit Dimensions
• International Compliance
• Technical Contact Information.
In order to make operation of this device easier and
make navigation within this manual simpler, the
following illustrations were used within the text:
• Safety Instructions, which need to be observed in
order to protect the operators and equipment, have
been written in bold text and have been given the
pictographs:
• Special Notes, which effect the use of the Banknote
Acceptor, have been written in italic text and have
been given the pictograph:
• Steps, requiring the operator to perform specific
actions are given sequential numbers (1., 2., 3., etc).
1 GENERAL INFORMATION
Description
iVIZION Units
iVIZION (SS Version)iVIZION (LD Version)
Figure 1-1 iVIZION Units

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-2
Section 1 iVIZION® Series Next-Generation Banknote Acceptor Unit General Information
Model Number Specifications
Table 1-1 lists the iVIZION®Model Number
Descriptions.
Type Descriptions
Table 1-2 lists the iVIZION®Type Number
Descriptions.
Software Descriptions
Table 1-3 lists the iVIZION®Software Number
Descriptions.
Precautions
The Figure 1-2 symbols are defined as follows:
1. (Type 1) Do not insert a torn, folded, or wet
Banknote into the Unit, as this action may cause a
Banknote jam inside the unit.
2. (Type 2) Do not expose the Unit to water. The
unit contains several precision electronic devices
which can be damaged if water or liquid of any
kind is sprayed or spilled into the Unit.
3. (Type 3) Do not install the Unit into a dusty
environment. Dust may affect and degrade the
Sensor’s performance.
User Cautions
Careful measures are taken in this product to
ensure its quality, however, the following Cautions
should be read and understood by all users in order
to confirm safe operation.
I
NSTALLATION
C
AUTIONS
1. Do not allow the Unit to endure or operate at a
high temperature, in high humidity and/or in a
dusty environment.
2. Do not install the Unit into an area where exces-
sive vibration or shock are present.
3. This equipment is not fully warranted for outdoor
use. Be sure that the Host Machine contains
enough protection to avoid wet or dusty condi-
tions when installing it in both open-air and
indoor spaces.
4. Avoid exposing the Unit to direct Sunlight and/or
Incandescent Lamp illumination having a Gradi-
ent Angle of 15 Degree or more, and illumination
index of 3000 Lux or less.
5. Insure that the Host Machine is designed for
daily operational access such as maintenance
and/or clearing a Banknote jam.
Table 1-1 iVIZION Model Number Specifications
NoModel: iVIZION - * * * - SS
No(1)(2)(3) (4)
(1) Validation Head
1: Standard
2 - 9: Reserved
(2) CPU Board (Memory)
0: Standard
1 - 9: Reserved
(3) Transport Unit Type
0: Standard
1 - 9: Reserved
(4) Stacker Type
SS: Security Stacker Down
LD: Less Down (No Stacker)
Table 1-2 iVIZION Type Number Specifications
NoType: * * * - 00 - * * * * *
No(a)(b)(c) (d) (e)(f)(g)(h)(i)
(a) Box Capacity*
5: 500 notes (New Banknote)
9: 900 notes (New Banknote)
0: No Cash Box
*. The numbers of stacked Notes depends on the Banknote’s condition.
(b) Box Type
0: Standard
(c) Box Handle
0: Standard
(d) Transport Unit Type
00: Standard
(e) Bezel (Option)
0: Without Bezel
1: With LED Bezel (UBA Standard 85)
(f) ICB (RFID Type)
0: None
1: ICB-Compliant (Standard) (for SS Version Only)
(g)
Optional Board (Memory)
0: Standard Memory (64M Bit)
1: Memory Extension Board (128M bit)
2: Memory Extension Board (192M bit)
(h) Input/Output Signal Selection
P: Photo-Coupler Isolation (Standard)
R: RS232C
(d)
External Harness Type
0: No Harness
1: Standard Harness (One side cut)
2: Harness (with USB I/F Cable) (One side cut)
3: Harness 2 (with Connector and USB I/F Cable)
Table 1-3
iVIZION Software Number Specifications
NoSoftware: iVIZION-100-SS * * * - * * * - V *.* *
No(A) (B) (C) (D)
(A) Software Model Name
(B) Denomination (Country Code)
(C) Interface Protocol Name
(D) Software Version
Type 1 Type 2 Type 3
Figure 1-2 Precautionary Symbols

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-3
General Information iVIZION® Series Next-Generation Banknote Acceptor Unit Section 1
M
OUNTING
, D
ISMOUNTING
& T
RANSPORTATION
1. Be sure to turn the Power OFF before mounting
or removing the Unit from its permanent loca-
tion. Plugging or unplugging Connector Plugs
from their receptacles while the Power is ON
may cause damage to the Unit.
2. When reassembling a disassembled Unit Part,
ensure that the each part is properly replaced in
its correct original location.
3. Be sure to carry the Unit by both hands when
transporting it. Holding the Unit by one hand
may cause personal injury if the Unit accidently
becomes disassembled and drops away.
4. Be careful not to use excessive outside pressure
on the Unit, or subject it to excessive vibration
during transportation.
P
REVENTIVE
M
AINTENANCE
1. Be sure to turn the Power OFF before beginning
a maintenance procedure. The equipment can
produce abnormal operating signals while in
maintenance mode that may cause personal
injury.
2. If the Validator Section is dirty due to dust, for-
eign objects or other such debris adhering to it,
Banknote acceptance rates will degrade. Clean
the Unit once a month to keep its performance
stable.
3. Use a soft, lint-free cloth, cotton swab or a com-
pressed air spray to clean dust and debris from
the Banknote path.
4. Do not disassemble the Unit incorrectly or rede-
sign it in any way. Unauthorized use by inade-
quately trained personnel, or use outside the
original manufacturer’s intent for operation voids
the warranty.
5. When the Unit is exposed to liquid such as water,
wipe and thermally dehydrate dry the wet areas
immediately. Remaining liquid fluids may affect
and degrade the Sensors and the Validation
Section’s performance.
B
ANKNOTE
F
ITNESS
R
EQUIREMENTS
The following Banknote types may not validate
correctly, or can cause a Banknote jam and/or dam-
age to the Unit’s Transport path. Banknotes exhib-
iting the conditions listed below and illustrated in
Figure 1-3 should be avoided:
• Torn
• Having excessive folds
• Dirty
• Wet
• Having excessive wrinkles
• Adhering foreign objects and/or oil.
R
EFERENCE
P
APER
U
SE
P
RECAUTIONS
When calibration using the KS-072 Reference
Paper is complete, proceed as follows:
• Ensure that the Reference Paper Carrier is kept in
an upright position following use (See Figure 1-4 a)
or, replace it into its protective Shipping Carton
when calibration is complete (See Figure 1-4 b).
• Do not lay the Reference Paper Carrier down on
any irregular surface, otherwise the Reference
Paper may become wrinkled making it useless for
future calibration use.
• ALWAYS return the KS-072 Reference Paper into it
protective Shipping Carton following each use.
Caution: DO NOT use any alcohol,
solvents, scouring agents or citrus
based cleaners that can damage
the plastic surfaces of the device
when cleaning it.
Caution: Make Interface Harness
connections to the Host Machine
shorter than 9.84 Feet (3 Meters) in
length. Cut off all unused portions
of the Interface Harness wiring to
avoid static electrical effects or
short circuit possibilities that
could cause damage to the Unit.
WARNING: This Unit is designed
for use with a Current limiting
Power Source! Design the Host
Cabinet space to meet all local
related safety standards.
Figure 1-3 Unacceptable Banknotes
Damaged Banknotes
Wrinkled Banknotes
Curled Banknotes
Folded or Partial Banknotes
Figure 1-4 KS-072 Reference Paper
Handling Precautions
a
b
KS-072
Reference
Paper
KS-072
Reference Paper
Shipping Carton

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-4
Section 1 iVIZION® Series Next-Generation Banknote Acceptor Unit General Information
Primary Features
The iVIZION®Series of Banknote Acceptor
contains the following primary features:
• Easily swappable single Validation Head for
inventory and maintenance efficiently.
• CIS technology allowing 100% scanning of
document details and fine line imagery.
• RFID Intelligent Cash Box with lockable Frame
Unit, and a single handle for one-hand action
removal without having to use a Button or Lever to
release the Cash Box.
Component Names
Figure 1-5 illustrates the iVIZION®Component
Names and Locations.
Figure 1-5 iVIZION Component Names
A. Acceptor Unit
B. Front Upper Guide Access Lever (Acceptor Unit)
C. Bezel (Option)
D. Interface Connector
E. Rear Upper Guide Access Lever (Transport Unit)
F. Transport Unit
G. Frame Housing (SS Specification)
H. DIP Switch Block (Denomination INHIBIT)
I. DIP Switch Block (JCM Custom Private Line)
J. Acceptor Unit Release Pushbutton
K. Status LED
(Four (4) Colors: Red/Yellow/Green &
Blue)
L. Front Panel Bezel JPL Connector
M. Transport Unit Release Lever
N. Power ON LED (Green)
O. USB (Mini-B) Software Download/Calibration
& Maintenance Connector
P. C a s h B o x
Q. Stack Volume Indicator Window
R. Cash Box Window - confirms the last stacked
Banknote Denomination Value
S. Lock Installation Hole
(user provided)
T. Pusher Lever - manually moves the Pusher
Plate down (Activate lever to confirm the denom-
ination value through Cash Box Windows “R”)
U. Frame Housing (LD Version).
A
B
C
D
E
F
G
H
I
JL
K
M
N
O
Q
P
R
S
T
U

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-5
General Information iVIZION® Series Next-Generation Banknote Acceptor Unit Section 1
Specification (iVIZION SS Version)
T
ECHNICAL
S
PECIFICATIONS
E
NVIRONMENTAL
S
PECIFICATIONS
Table 1-4 iVIZION SS Version Technical Specification
Acceptance Rate*:
*. Refer to the specific Country’s “Software Information Sheet” for each Country’s particular Banknote acceptance rate.
98% or greater
Note: The following Banknote types are excluded:
a) Banknotes with unclear graphics
b) Double (dual) notes
c) Worn, dirty, wet, stained, torn or excessively wrinkled Banknotes
d) Banknotes having folded corners or edges
e) Banknotes having the wrong cut dimensions or a printing displacement
f) Returned Banknotes because of incorrect or failed insertion.
Banknote Types Accepted: Long edge: 110-170 mm (4.33-6.69 in.)
Short edge: 60-85 mm (2.36-3.35 in.).
Barcode Coupon†:
†. Refer to the specific Country’s “Bar Code Coupon Specification” for more details.
Standard Specification
a) Read Code interleaved: 2 of 5
b) Narrow Bar: 0.5mm-0.6mm (0.019-0.023 in.)
c) Wide Bar: Narrow Bar = 3:1
d) Characters: 18 Characters
e) Print Position: Middle (by dividing a Coupon equally on the left, right, top and
bottom of the Coupon’s exact center)
f) Print Width: Wider than 10mm (0.39 in.).
Insertion Direction: Refer to the specific Country’s Software Information Sheet.
Processing Speed:
Approximately 2 seconds from Banknote insertion to Vend signal output.
Approximately 3 seconds from Banknote insertion to completion of the
stacking operation.
Validation Method: Optical
Diagnostic Indicators: Power LED, Status LED, Bezel LED (Optional)
Escrow: 1 Note
Cash Box Type‡:
‡. User supplied installed Locks (including the attached Plate, Lock and Key).
Secure Cash Box
Intelligent Cash Box (available with RFID Specification)
Cash Box Capacity**:
**.The number of Notes stacked depends on the Banknote’s condition.
Standard: 500 Banknotes
Large: 900 Banknotes.
Fraud Detection: Equipped
Interface††:
††.The Interface Harness connecting to the Host should be less than 3m.
USB Interface: USB Specification Rev.2.0
Serial Interface: Photo-Coupler Isolation
Serial Interface: RS232C Communication Protocol.
Table 1-5 iVIZION SS Version Environmental Specification
Operating Temperature: 5º C to +50º C (41º F to 122º F)
Storage Temperature: -20º C to +70º C (-4º F to 158º F)
Relative Operating Humidity: 15% to 85% RH (non-condensed)
Relative Storage Humidity: 15% to 85% RH (non-condensed)
Installation: Indoors Only
Hydrothermal Condition Table
[°C]
[RH%]
Allowable Operating
Temperature and
Humidity Range
35°C/85%
50°C/40%

P/N 960-100929R_Rev. 3 {EDP #148849} © 2012, Japan CashMachine Co., Limited
1-6
Section 1 iVIZION® Series Next-Generation Banknote Acceptor Unit General Information
E
LECTRICAL
S
PECIFICATIONS
S
TRUCTURAL
S
PECIFICATIONS
Table 1-6 iVIZION SS Version Electrical Specifications
Supply Voltage: 12V DC (-5%) to 24V DC (+10%) [NOTE: Use a Current Source Limiting
Power Supply]
Current Consumption:
Standby: 24V DC = 0.2A, 12V DC = 0.2A
Operation: 24V DC = 1.3A, 12V DC = 2.3A
Maximum: 24V DC = 3.2A, 12V DC = 3.0A
Table 1-7 iVIZION SS Version Structural Specifications
Weight Empty: Approximately 4.1kg (9.04 lbs)
Mounting: Horizontal (Maximum gradient limitation within 50 degrees; See Figure 1-
8 on page 1-10)
Outside Dimensions: Refer to “iVIZION Banknote Acceptor SS Version Unit Outside Dimen-
sions” on page 1-9 of this document.
This manual suits for next models
2
Table of contents