Module
Unit:mm
Grounding holes
Mounting slot
Label
Front Side Rear
Assembly Drawing
JNMM60 JNMP60

晋能清洁能源科技股份公司
42018/12/25
Dimension Of Module 40-feet High Container
1650*992*35
Pcs/Pallet 31
Pallet/Stack 2
Extra Pcs/Stack 4
Stacks/Container 14
Pcs/Container 924
Unit:mm
Transportation
Packing configuration
Extra Pcs

晋能清洁能源科技股份公司
52018/12/25
Transportation
Unloading for container
S/N Operating procedure Photo Control Point
1
If the container is on the
ground, the
module
can be
unloading directly
If the container is not full
,the people need to cut the
bandage when unloading
(If the container is full,the
bandage is none
)
2
If the container is on the
flatbed trailer, the
module need a
landing platform when
unloading
1. If
the forklift hold up from the long side,
forklift arm need to beyond the box width
2. Box transportation needs to keep horizontal
or tilted to the direction of forklift
3.
Box short edge surface requires to
smooth and there
is no sharply extrude
3
The forklift can loading 2T or
more, raising
the
module smoothly pull out and keep slow
speed when holding the module
1. If
the forklift hold up from the short side,
forklift arm length of about 1520 mm or more
2. Box transportation needs to keep horizontal
or tilted to the direction of forklift
3. Box short edge surface requires
to
smooth and there
is no sharply extrude

晋能清洁能源科技股份公司
62018/12/25
Unit:mm
B
5:1
A
5:1
Unpacking
Material of package
A
B
A
B

晋能清洁能源科技股份公司
72018/12/25
Unpacking
Manner of packing
Stacked PackageSingle Package
Unit:mm Top Package

晋能清洁能源科技股份公司
82018/12/25
S/N Operating procedure Photo Control Point
1
Cut off the packing
tape, remove the top
package down and hold on flat floor
2
Cut off the packing tape and remove the box
cover
Operators must wear gloves to prevent scratching of
their hands by frame and keep the glass surfaces clear
3
Cut off the inner packing tape
4
1. Two
professional people unpacking the
module together from back side
2.
When take off the last eight modules, the
outermost module must be slanted to lean on
the other modules
Unpacking
Operating procedure of unpacking

晋能清洁能源科技股份公司
92018/12/25
Storage
Storage for modules
S/N Operating Procedure Photo Control Point
1
The module would be best set on the flat floor,
stand
side by side and place neatly
2
If there are not flat floor
,the stacked p
ackage
must be break
down, the
short part of carton is
facing down, s
tand side by side and place neatly
The pallet should be pulled firmly as following
3
The module should be protect when raining or
wet
,which wrapped by waterproof
It should be protected by waterproof whether
above two methods

晋能清洁能源科技股份公司
10 2018/12/25
Storage
Storage for scattered modules
S/N Operating procedure Photo Control Point
1
If
unpacked modules do not
installed
completely
It
can not remain in the box for long time, if it is necessary
to
storage the unpacked modules, we
suggest the following
method
2
Place the modules on the pallet
1. The pallet need to put on the flat ground
2. The glass of first module need to face
upward, it need
to face down from second module
3. It can not more than 20 Pcs/pallet totally
4. It is forbidden that carry module by cable of junction box
5. The modules should be stacked neatly, avoid the glass
blasting because of dislocation
6. People can not move the modules with this method
7. It is not allowed two or more adjacent modules which
have no corner protection
3
Modules
should be wrapped
by
waterproof
corner protection

晋能清洁能源科技股份公司
11 2018/12/25
Installation
Installation condition
State:
1. The modules which installed at one series should
be same power、same color、same current
Power:③ of dexter picture
Color:⑤ of dexter picture
Current:⑦ of dexter picture
2. If the modules must be gathered together, we
suggest that the first mix colors, secondly mix
current, mixed power is not recommended
3. Only high current modules can mixed into low
current modules series
4. The strapping tape of cable need to use scissors
to cut open, can't catch the connector pull off

晋能清洁能源科技股份公司
12 2018/12/25
Dimension(mm) A(mm) B(mm) C(mm)
1650*992*35 1650 200 210
Clamping
Installation
Installation method
Clamp Location

晋能清洁能源科技股份公司
13 2018/12/25
Bolting
Grounding holes
Mounting slot
Label
1.The specific way of installation is on the base of EPC
2.The four mounting slots are matched with M8 bolts
3.Put two washer into the bolt on both side of the frame
Installation
Installation method

晋能清洁能源科技股份公司
14 2018/12/25
Installation
Electrical installation
Ground
1. The module must ground by Grounding hole
2. The surface of frame is anodization coating,it is necessary for
tooth gasket or self-tapping screw in order to be well grounded
3. Every module must ground individually only when all modules of
series connect well
4. Bracket must be checked before the thunderstorm season,it is
necessary to carry out spot check on underground component if
it is ok
5. Jinneng recommend to use the ground cable which radius is 6 mm²
Recommended grounding way
Tooth Gasket Ground
Anti-thunder
Anti-thundered measure should be taken to module series
Photovoltaic grounding and lightning protection should implement by regulation of DL/T1364
Nut
Fixed end
Bolt
Fastening bolt
Ground wire
Frame
Gasket

晋能清洁能源科技股份公司
15 2018/12/25
Installation
Electrical installation
Operate
1. The maximum system voltage is 1000V/1500V
2. The series quantity of module must be matched
with electrical characteristics of inverter
3. It is possible to heat or burn up except for
hearing “ka”when people plug the connector
4. The minimum bended radius is 43mm and prohibit
to excessively bend Fail PassCable Bending
Fail Pass

晋能清洁能源科技股份公司
16 2018/12/25
Maintenance
Clean
1. The module should clean which the irradiance is lower than 200 w/m², suggested module cleaning
time: the summer before 6 o 'clock in the morning, after 7 PM;the winter before 7 o 'clock in the morning,
after 6 PM
2. You can use all kinds of soft sponge、foam、duster to clean module rather than Knife、steel wool in case of
scratching the glass
3. It is not recommended to clean with higher mineral water because there are remaining minerals after dry up
4. It is forbidden to clean with water which temperature is different largely with module,otherwise the glass is
impossible to broken
5. Clean the water pressure cannot be more than 690 Kpa
6. Do not touch the surface of module with bare hands
7. People can clear it with soft items if there is thick snow on the glass,be careful to not scratch glass. It is not
recommended to clean when the snow wait to be too thick,to avoid the module surface freeze

晋能清洁能源科技股份公司
17 2018/12/25
Maintenance
Others
The module is forbid to shield by grass、droppings and other sundry,Otherwise it will cause power
decreases, serious will cause hot spots, combustion

晋能清洁能源科技股份公司
18 2018/12/25
Maintenance
Others
Prohibit impact or use of sharp objects to wipe、touch the glass surface,Otherwise it may cause the
surface scratches or glass blowout, if glass burst, need immediate replacement of module
Modules shall not be piled up around flammable items, surrounding environment should be good
ventilation and heat dissipation
In order to keep the system security and work under maximum efficiency, electrical and mechanical
failure needs to be tested by authorized personnel

晋能清洁能源科技股份公司
19 2018/12/25
Maintenance
Others
Check the module and the bracket is fixed firmly, if not
may cause module is overturned by wind
Check the grounding line and modules are in good
condition
Check whether there is cable or other
components impact module, this
phenomenon may cause cell cracked、
power decreased, serious may cause hot
spot or burning

晋能清洁能源科技股份公司
20 2018/12/25
It can produce more than 30V voltage when module is in the sun.
Sparks、electric shock, and even cause fire if there is improper
operation to electrical connection. Do not directly touch module
no matter it under any circumstances.
The module can be installed on roof、vehicle and so on which be
matched to special bracket. Do not pull down anything such as
glass、label、frame and which belong to module .
Do not paint or paste anything on the surface of module.
Do not focus the suns ray on the module with burning glass or
mirror and so on.
Please let the child away from module and PV system in the
process of transportation and installation.
Safety
Safety
Other manuals for JNMP60 series
2
This manual suits for next models
1
Table of contents
Popular Control Unit manuals by other brands

DOEPFER
DOEPFER A-100 Series Assembly and Wiring Manual

Festo
Festo LFR-D Series operating instructions

HORNER
HORNER SmartStack HE800JCM100 manual

Mitsubishi Electric
Mitsubishi Electric A1S64TCTT-S1 user manual

tell
tell GSM Gate Control Pro 20 Installation and application manual

Ai-Thinker
Ai-Thinker TB-05 specification