joule Cyclone series Instruction Manual

Cyclone Direct / Indirect Installation Guide
1
Direct, Indirect & Solar
Un-Plumbed & Pre-Plumbed
Unvented Cylinder
Installation & Maintenance Manual
REGISTER THIS PRODUCT
ONLINE WITHIN 28 DAYS OF
COMMISSIONING
IRELAND
www.joule.ie/register-a-product
UNITED KINGDOM
www.jouleuk.co.uk/register-a-product
JL-CYDID-INS-003-09-2017

www.jouleuk.co.uk | www.joule.ie
2
Warranty Card
Please register your product online
Homeowner
Name
Address
Contact Tel.
Contact Email
Installer
Name
Address
Contact Tel.
Contact Email
Product Product
Installed
Serial Number Installation
Date
Cylinder Located on
cylinder badge
Solar Thermal Take from
solar controller
Solar PV Ser. No. from
String / Micro Inverter
Air Source Heat Pump Located on external
heat pump badge
Integrated Heat Pump
and Cylinder
Located on
cylinder badge
Underoor Heating Project ref. on
supplied schematic
Direct Gas Fire Cylinder Located on
cylinder badge
Was a Pre-Plumbed
cylinder installed too?
If installed, please ll out the Heat Pump Commissioning
Sheet too
Joule Advance Installer
I accept the terms and conditions in the installation manual
MUST BE COMPLETED AND
THEN REGISTERED ONLINE
TO COMPLETE WARRANTY

Cyclone Direct / Indirect Installation Guide
3
Joule Product Warranty Terms & Conditions
Joule Wellmaster
The JOULE Wellmaster stainless steel vessel car-
ries a fully transferable 10-year guarantee against
faulty materials or manufacture provided that:
• It has been installed in the United King-
dom or the Republic of Ireland as per the
instruc- tions provided in the installation
manual provided with the cylinder and in
accord- ance with all of the relevant stand-
ards, regulations and codes of practice in
force at the time.
• Ithasnotbeenmodiedinanyway,other
than by JOULE.
• Ithasnotbeenmisused,tamperedwithor
subjected to neglect.
• Ithasonlybeenusedforthestorageofpo-
table water.
• Thesacricialanodeisremovedforinspec-
tion within 3 months of the cylinder instal-
lation. If there are signs of corrosion on the
anode it must be replaced.
• Areplacementschedulefortheanodemust
be put in place based on the ndings of the
initial 3 month inspection.
• Maximum interval between anode inspec-
tions is 12 months.
• Thewarrantycardislledinandacopyis
Exclusions
Theguaranteedoesnotcovercylindersaected
by the following;
• Wellmastercylinderswheretheanodehas
not been routinely maintained.
• Anylabourchargesassociatedwithreplac-
ing the unit or its parts.
• Any consequential losses caused by the
failure or malfunction of the unit.
Please note that invoices for servicing may be
requestedtoprovethattheunithasbeenser-
viced annually.
Joule fully endorse the Benchmark scheme
and the code of practice can be obtained from
www.centralheating.co.uk
Joule Cyclone
The JOULE Cyclone stainless steel vessel car-
ries a fully transferable 25-year guarantee against
faulty materials or manufacture provided that:
• IthasbeeninstalledintheUnitedKingdom
or the Republic of Ireland as per the instruc-
tions provided in the installation manual
provided with the cylinder and in accord-
ance with all of the relevant standards,
regulations and codes of practice in force
at the time.
• Ithasnotbeenmodiedinanyway,other
than by JOULE
• Ithasnotbeenmisused,tamperedwithor
subjected to neglect.
• The system is fed from the public mains
water supply.
• Ithasonlybeenusedforthestorageofpo-
table water.
• Ithasnotbeensubjectedtofrostdamage.
• Theunithasbeenservicedannually.
• TheServiceLogBookhasbeencompleted
after each annual service.
• Thewarrantycardislledinandacopyis
Exclusions
Theguaranteedoesnotcovercylindersaected
by the following;
• Theeectsofscalebuilduponthecylinder.
• Anylabourchargesassociatedwithreplac-
ing the unit or its parts.
• Any consequential losses caused by the-
failure or malfunction of the unit.
Please note that invoices for servicing may be
requestedtoprovethattheunithasbeenser-
viced annually.
Unvented Kit & Other Components
The expansion vessel and cold water controls
supplied with JOULE models carry a 1-year
guarantee.Allothercomponentsthatarettedto,
or supplied, with the unit carry a 1-year guarantee.

www.jouleuk.co.uk | www.joule.ie
4
Warning To The User
• Donotremoveoradjustanypartofthisunventedwaterheater.
• Iftheunventedwaterheaterdevelopsfault,suchasalowofwaterfromthedischargepipe
switchtheheatero.
• Inallcasescontactacompetentinstaller.
• TheBenchmarkLogBookattheendofthemanualmustbelledinatannualservice.
Warning To The Installer
• Readtheinstallationinstructionsbeforecommencing.
• UnventedwaterheatersareacontrolledserviceasdenedinthelatesteditionoftheBuilding
&Regulationsandshouldonlybettedbyacompetentinstaller.
• Theinstallationissubjecttobuildingregulationapproval.
• Youmustnotifythelocalauthorityofintentiontoinstall.
• Afterinstallationtheinstructionsmanualmustbecompletedandleftwiththehouseholder.
• Useonlymanufacturer’srecommendedreplacementparts.
Installed by
Installer
Name
Address
Contact Tel.
Completion
Date

Cyclone Direct / Indirect Installation Guide
5
Table Of Contents
6 Introduction
10 GeneralRequirements
14 UnventedKitComponents
15 UnventedKitChecklist
16 ErP Product Fiche
17 TechnicalData
18 IndirectVerticalTechnicalSpecication
20 DirectVerticalTechnicalSpecication
22 SolarVerticalTechnicalSpecication
24 DirectHorizontalSpecication
25 IndirectHorizontalSpecication
26 PlumbingG3UnventedKit
27 Testing
28 Smart Control Immersion Setup
28 Immersion Testing
Un-PlumbedCylinderSchematic
30 • MechanicalDiagramS-Plan
31 • ElectricalDiagramS-Plan
Un-PlumbedCylinderSchematic
32 • MechanicalDiagramY-Plan
33 • ElectricalDiagramY-Plan
Pre-PlumbedCylinderSchematic
34 • MechanicalDiagramIndirectSystemBoiler,OneHeatingZone
35 • ElectricalDiagramIndirectSystemBoiler,OneHeatingZone
Pre-PlumbedCylinderSchematic
36 • MechanicalDiagramIndirectSystemBoiler,TwoHeatingZone
37 • ElectricalDiagramIndirectSystemBoiler,TwoHeatingZone
Pre-PlumbedCylinderSchematic
38 • MechanicalDiagramIndirectHeatOnlyBoiler,OneHeatingZone
39 • ElectricalDiagramIndirectHeatOnlyBoiler,OneHeatingZone
Pre-PlumbedCylinderSchematic
40 • MechanicalDiagramIndirectHeatOnlyBoiler,TwoHeatingZone
41 • ElectricalDiagramIndirectHeatOnlyBoiler,TwoHeatingZone
42 ElectronicControls
43 DischargeArrangement
46 Commissioning
47 Maintenance
49 TakingTheCylinderOutOfUse
50 Troubleshooting
52 BenchmarkChecklist
54 Service Record
55 Notes
NEW

www.jouleuk.co.uk | www.joule.ie
6
Introduction
The instructions are an integral part of the appliance and must be given to the end user on comple-
tion of the installation in order to comply with the current regulation.
It is important to carefully read the manual to understand all the information to enable safe installa-
tion,useandservicing.Theseinstructionsconsistofdetailsforinstallation,servicing,faultnding
and replacement of parts for the cylinder purchased.
JOULE will not accept any liability in the event of damage for not complying with the guidance in
this instruction manual.
The instructions for this installation manual apply to the range of JOULE Cyclone Unvented Cylinders.
Safety is paramount when installing unvented hot water systems and the following instructions must
be adhered to:
• Onlycertiedcompetantinstallerscaninstall,commissionandservicetheequipmentsupplied.
• Thecylindermustbeusedforpotablehotwateronly.Anyotherapplicationswillbeconsidered
incorrect use and JOULE will not be held liable for any losses resulting from such use.
• Allinstallationandmaintenanceinstructionsmustbeobservedtoensurethecorrectoperation
oftheequipment.
• Theelectricimmersionmustnotbeswitchedonunlessthecylinderiscompletelyfullofwater.
• Domestichotwatermaybestoredattemperaturesexceeding60°C.Preventativemeasures
should be put in place to negate the possibility of scalding.
• Amaintenancescheduleshouldbeputinplacewithacompetentpersontoservicetheequip-
ment annually to comply with the warranty conditions.
• Whenservicingthesystemthemainssupplytothecylindershouldbeisolated.
• Onlygenuinesparepartsshouldbeused.Afulllistofitemswithrelevantcodescanbefound
on page 13.
The installation must be carried out by a person competent to install unvented hot water systems.
The installation must be carried out in accordance with the following recommendations:
AllcurrentBuildingRegulationsissuedbytheDepartmentoftheEnvironment,i.e.ApprovedDocu-
mentL1BuildingStandards(Scotland)(Consolidation)RegulationsissuedbytheScottishDevelop-
mentDepartmentUKWater Regulations/Byelaws (Scotland)Health&Safety Document No. 635
(TheElectricityAtWorkRegulations1989).Theinstallationshouldalsobeinaccordancewiththe
followingBritishStandardCodesofPractice:
BS 5449:1990 Forced circulation hot water systems
BS 5546:2000 Installation of hot water supplies for domestic purposes
BS 5918:1989 Solar heating systems for domestic hot water
BS6700:2006Design,installation,testingandmaintenanceofservicessupplyingwater.
Failure to install this appliance correctly could lead to prosecution and will invalidate the guarantee.
It is in your own interest and that of safety to ensure that the law is complied with.

Cyclone Direct / Indirect Installation Guide
7
Handling
Caremustbetakenwhentransporting,storingandinstallingtheequipment:
• Atleasttwopeopleshouldliftthecylindertopreventinjuries.
• Thecylindermustbestoredinadryareaandmustneverbesetdownhardduringhandling.
• Packagingshouldonlyberemovedattheinstallationlocation.
• Thecylindermustbeinstalledonalevelorwiththerequiredloadbearingcapability.Installation,
servicing, maintenance and repair must be carried out by a competent person.
• Allelectricalwiringmustbecarriedoutbyaqualiedelectricianandbeinstalledinaccordance
with current I.E.E Wiring Regulations.
• Alackofsafetydevicescanleadtopotentiallyfatalinjuries,allnecessarysafetydevicesmust
be installed correctly in the system. The use of an electric immersion may lead to the build up
of electrical potential in the water. This can in turn cause corrosion of the immersion. To prevent
this, ensure the immersion heater, and the hot and cold pipework are correctly bonded and
connected to the earth line.
• Ifplasticpipesareusedtheymustbeapprovedtemperatureresistantto95°Catapressureof
10bar.
Athermostaticmixershouldbeinstalledinthesystemtopreventtheriskofscalding.Ifthereare
leaks found in the system, shut o the cold water stop valve from the main supply and contact a
competent person immediately.
What Is Benchmark?
Benchmark places responsibilities on both manufacturers and installers. The purpose is to ensure
thatcustomersareprovidedwiththecorrectequipmentfortheirneeds,thatitisinstalled,commis-
sionedandservicedinaccordancewiththemanufacturer’sinstructionsbycompetentpersonsand
thatitmeetstherequirementsoftheappropriateBuildingRegulations.
TheBenchmarkChecklistcanbeusedtodemonstratecompliancewithBuildingRegulationsand
shouldbeprovidedtothecustomerforfuturereference.Installersarerequiredtocarryoutinstalla-
tion,commissioningandservicingworkinaccordancewiththeBenchmarkCodeofPracticewhich
isavailablefromtheHeatingandHotWaterIndustryCouncilwhomanageandpromotethescheme.
Visit www.centralheating.co.uk
HWA Charter Member
JouleareproudtobeachartermemberofthetheHotWaterAssociation(HWA),whohasbeen
formedthroughtheunionofthetwoUKindustrytradebodies,WMA(WaterHeaterManufacturers
Association)andMODUS(ManufacturersOfDomesticUnventedSystems).
TheobjectivesoftheHWAare“Toberecognisedastheleadingbodyindomestichotwaterstorage
and, through cooperation and partnerships, to support, drive and promote the sustained growth
and improvement of standards within the entire domestic hot water industry”.
TheHWAoperateaCharterthatallmembersoftheassociationobserve.
TheHWACharterStatementrequiresthatallmembersadheretothefollowing:
• Tosupplytforpurposeproductsclearlyandhonestlydescribed
• Tosupplyproductsthatmeetorexceedappropriatestandardsandbuildingandwaterregulations
• Toprovidepreandposttechnicalsupport
• Toprovideclearandconcisewarrantydetailstocustomers

www.jouleuk.co.uk | www.joule.ie
8
Water Supply
The performance of any unvented system is only as good as the mains water supply available. To
this e ect the maximum possible water demand should be assessed, with the knowledge that the
mains supplies both hot and cold services simultaneously. The water heater itself operates at a
pressure of 3bar, controlled by the inlet control set, and is capable of delivering over 50 litres per minute.
Thehighqualityinletcontrolsethasbeendesignedtomakethemostofthelowratesavailable.
Thewatersupplyshouldbecheckedtoensureitcanmeettheserequirements.Ifnecessary,consult
thelocalwaterauthorityregardingthelikelypressureandowrateavailability.
Considerationshouldbegiventoupgradingexisting1⁄2”(15mm)coldmainspipeworktoalarger
sizeiftherecommendedminimumpressure/owrateisnotbeingachieved.JOULErecommend
that primary pipework used has a minimum diameter of 22mm to ensure low pressure loss.
Ahighstatic(noow)mainspressureisnoguaranteeofgoodowavailability.Ina
domestic installation 1.5bar and 25ltr/min should be regarded as the minimum. The
maximum mains pressure that the inlet control set can cope with is 10bar.
Change Of Water Supply
Thechangingoralternatingfromonewatersupplytoanothercanhaveadetrimentaleectonthe
operation and/or life expectation of the water heater storage cylinder, pressure temperature relief
valve and heating unit.
Where there is a changeover from one water supply to another, e.g. a rainwater tank supply, bore
water supply, desalinated water supply, public reticulated water supply or water brought in from
another supply, then water chemistry information should be sought from the supplier or it should
betestedtoensurethewatersupplymeetstherequirementsgivenintheseguidelinesfortheJoule
warranty to apply.
Water Chemistry
This water heater must be installed in accordance with this advice to be covered by the Joule war-
ranty. This water heater is manufactured to suit the water conditions of most public reticulated water
supplies.However,therearesomeknownwaterchemistrieswhichcanhavedetrimentaleectson
the water heater and its operation and/or life expectancy. If you are unsure of your water chemistry,
you may be able to obtain information from your local water supply authority. We recommend not to
usewatersoftener,howeverifitisusedthewaterisrequiredtobekeptatpotablestandards.This
water heater should only be connected to a water supply which complies with these guidelines for
the JOULE warranty to apply.
Introduction

Cyclone Direct / Indirect Installation Guide
9
Water Chemistry Levels Aecting Warranty
The JOULE warranty of this water heater will not cover resultant faults on components including
the storage cylinder where water stored in the storage cylinder exceeds at any time any of the fol-
lowing levels:
Components Maximum Permitted Levels
TotalDissolvedSolids 600 mg/litre
TotalHardness 200 mg/litre
Chloride 300 mg/litre
Magnesium 10 mg/litre
Calcium 20 mg/litre
Soldium 150 mg/litre
Iron 1 mg/litre
MaximumpH 9.5
MinimumpH 6.5
Total Dissolved Solids (TDS)
Some water analysis reports may state the conductivity of the water rather than the level of total dis-
solvedsolids.Conductivity,measuredinmicrosiemenspercentimetre(μS/cm),isdirectlyproportional
totheTDScontentofthewater.TDS,inmg/L,isapproximately70%oftheconductivityinμS/cm.
The JOULE warranty will not cover resultant faults to the storage cylinder if this water heater is con-
nectedatanytimetoawatersupplywheretheTDScontentofthewaterexceeds600mg/L.16In
locationswhereTDSapproaches600mg/L,e.g.duetosediment,westronglyrecommendttingan
appropriateltertoensurewaterenteringorinthewaterheaterdoesnotexceedthislevelatany
time i.e. due to sediment build up.
Features Of The Unvented Cylinder
• MadefromDuplexStainlessSteelforexcellentcorrosionresistance.
• Strongrust-proofedsteelcase.
• InsulationisbymeansofanapprovedCFC/HCFCfreepolyurethanefoamwithanozonedeple-
tionfactorofzero.
• Availableinavarietyofsizestosuit-100L,125L,150L,170L,200L,250L,300L,400Land500litres.
• AllmodelsincludingSolarmodelsareavailableinTwinorTripleversionssuppliedcomplete
with all the necessary safety and control devices needed to connect to cold water mains
• Allsafetyandcontroldevicesarepre-set.
• Highqualitycontrolsselectedthatcombinehighowrateperformancewithminimumpressure
drop which gives fantastic performance in all areas, with great improvements in areas with poor
water pressure.

www.jouleuk.co.uk | www.joule.ie
10
General Requirements
Wellmaster Cylinders
Only JOULE Wellmaster cylinders may be installed on a well, private water scheme or any water
source that does not come from the public mains.
Watersuppliedtothecylindermustconformtothewaterchemistrytableonthepreviouspage.A
descaleronthecoldwaterfeedmaybeusedifrequired.
If any of the water parameters are higher than set out in the table including total
hardness regardless of wheter or not it is fed from a main water connection a Joule
Wellmaster cylinder must be used.
IfanyofthewaterparametersarehigherthansetoutinthetableincludingTotalHardnessregardless
of whether or not it is fed from a main water connection a JOULE Wellmaster cylinder must be used.
Siting The Unit
This unit can supply outlets above it or at some distance from it but any outlets above the unit will
reduce the available outlet pressure by 0.1 bar for every 1m of height derence. The maximum
lengthofthe“deadleg”shouldbeasstatedintheWaterSupply(WaterFittings)Regulations1999
G18.7,inparticulartotheareaofmostfrequentuse.
Particular attention is needed if sitting in a garage or outbuilding as the unit should be protected
fromfrost.Allexposedpipeworkmustbeinsulated.Theunitmustbeinstalledupright on a at base
capable of supporting its weight when full (please see the tech- nical speci cation section for weights).
Sucientaccesstoallowmaintenanceofthevalvesshouldbeconsidered.Inadditiontheimmer-
sion heaters are 400mm in length and this distance should be considered to allow withdrawal for
servicingifrequired.Thedischargepipeworkfromthesafetyvalvesshouldfallcontinuouslyand
terminate safely.
Negative pressure may form in cylinders installed very high in a building. To counteract this, an anti-
vacuum valve can be installed to prevent damage to the cylinder. The anti-vacuum valve ensures
thatpressurecompensationasaresultofairowingintothecylinder.
Connecting To The Cylinder
Allofthepipeworkconnectionsonthecylinderarefemalethreaded.Uponlling/commissioning,
ensure all connections are completely watertight.
Nocontrolorisolationvalveshouldbettedbetweentheexpansionreliefvalveandthe
storage cylinder. The relief valve connections should not be used for any other purpose.

Cyclone Direct / Indirect Installation Guide
11
Cold Mains Pipework
Run the cold main through the building to the place where is to be installed. Take care not to run the
coldpipenearhotwaterorheatingpipeworksothattheheatpick-upisminimized.Identifythecold
watersupplypipeandtanisolatingvalve(notsupplied).A22mmBS1010stopcockcantypically
beusedbuta22mmquarterturnfullborevalvewouldbebetterasitdoesnotrestricttheowas
much.Donotuse“screwdriverslot”orsimilarvalves.
Make the connection to the cold feed of the cylinder and incorporate a drain valve. Position the
inlet control just above the Temperature & Pressure Relief Valve (TPRV) mounted on the side of the
cylinder. This ensures that the cylinder does not have to be drained down in order to service the inlet
controlset.Ensurethatthearrowpointsinthedirectionofthewaterow.Selectasuitableposition
for the expansion vessel. Mount it to the wall using the bracket provided.
Balanced Cold Connection
If there are to be showers, bidets or monobloc taps in the installation then a balanced cold supply
is necessary. There is a 22mm balanced connection on the inlet control set.
Fitting The Inlet Control Group
Excess pressure can lead to the cylinder bursting. The inlet control set supplied has an expansion
relief valve with a 15mm connection to allow it to be connected to the tundish. Make sure that there
is su cient space for future maintenance and also for connection of the discharge pipe for the ex-
pansion relief valve.
It is essential that this connection is not covered or closed. The hot water expansion vessel should
behardxedintopipeworkandinsulated.
Hot Water Pipework
Runtherstpartofthehotwaterdistributionpipeworkin22mm.Thiscanbereducedto15mm
and10mmasappropriateforthetypeoftapetc.Youraimshouldbetoreducethevolumeofthe
hotdraw-opipeworktoapracticalminimumsothatthetimetakenforthehotwaterisasquick
as possible.
Donotusemonoblocmixertaporshowersifthebalancedcoldconnectionisnotprovided.Outlets
of this type can back pressurise the unit and result in discharge.
Expansion Vessel
The expansion vessel receives the increased water volume when expansion takes place as the
system heats up and it maintains a positive pressure in the system. The expansion vessel contains
a exible diaphragm, which is initially charged on one side with nitrogen, but can be topped up with
airwhenrequired.
Select a suitable position for the expansion vessel. Mount it to the wall using the bracket provided
andhardxintopipeworkandinsulate.Ensurethatthetopofthevesselisaccessibleforservicing.
The pipe connecting the expansion vessel to the system should have a diameter of not less than
15mm and must not contain any restrictions.

www.jouleuk.co.uk | www.joule.ie
12
General Requirements
Priortoconnectingtheexpansionvesseltothesystemthepipeworkshouldbeushedandtested.
When the vessel is connected the system should be pressurised when cold. If the initial system
water pressure is too high, the diaphragm will be displaced too far into the vessel. This will leave the
vessel unable to accommodate the volume of expansion water. The result of this is an increase in
system pressure and the safety valve will lift.
Primary Coil Connections
Connecttheprimaryconnections (Indirectonly).Theprimary circuitmustbepositivelypumped.
Eitherprimaryconnectionmaybeusedastheprimaryow.Reheattimesareidenticaleitherway.
The primary circuit can be open vented or sealed, with up to a maximum pressure of 3.5 bar. If you
sealtheprimarycircuitanadditionalexpansionvesselandsafetyvalveisrequired.
TheboilermaybeGas,ElectricorOilbutmustbeundereectivethermostaticcontrol.Uncontrolled
heatsourcessuchassomeAGA’s,backboilers,solidfuelstoves,etc.arenot suitable. Please con-
tactourTechnicaldepartmentforguidance.Connectthetwoportzonevalve(indirectonly)intothe
primaryowpipework.Thedirectionofowarrowshouldbetowardstheprimaryowconnection.
Installing The Two Port Motorised Valve
The function of the Two Port Motorised Valve prevents the cylinder from overheating. It can be in-
stalledoneitherhorizontalorverticalpipework.
Ifitismountedontohorizontalpipeworkthevalveheadmustfaceupwards.Thedirectionofowis
marked on the body of the valve with arrows.
Thermostatic Mixer
WheninstallingasolarsystemwithanunventedJOULECyclonetwincoilcylinder,athermostatic
mixing valve should be installed. Its function is to act as an anti scald protection. The thermostatic
mixeristobesettoatemperatureofbetween30°Cand60°Candissuppliedbytheinstaller.
Secondary Circulation
Onlargerinstallationslongpiperunstodraw-opointscancausesignicantvolumesofwatertobe
drawnobeforeanacceptabletemperaturecanbereached.Secondarypumpedcirculationusing
astainlesssteelorabronzepump,andcombinedwitheectivetimeandtemperaturecontrolscan
overcomethisproblem.Wheresecondaryreturncirculationisrequiredthepipeworkshouldberun
in15mmpipe.AsuitableWRASapprovedstainlesssteelorbronzecirculationpumpmustbeused.
Acheckvalvemustalsobeinstalledtopreventbackow.
On large secondary circulation systems it may be necessary to incorporate an extra expansion
vessel into the circuit to accommodate the increased system water volume. Secondary circulation
shouldbeavoidedon Directelectricallyheatedunits being used ono-peakelectricitytaris.It
should be noted that the use of a secondary circulation circuit can increase running costs as there
willbecirculationpipelosses.Highlevelsofinsulationonsecondarypipeworkarerequiredtokeep
energy losses to a minimum.

Cyclone Direct / Indirect Installation Guide
13
Dead Legs
Thelengthofhotwaterdrawototapsandotheroutletsshouldbekepttoaminimumtoreducethe
amountofcoldwaterdrawnobeforethehotwaterarrives.Themaximumrecommendeddeadleg
lengthsareshowningure2.b.Wherethereismorethanonesizeofpipeonadeadleg,theequiva-
lentlengthandsize should be estimated.Wherethe dead leg lengthexceedstherecommended
maximum, secondary circulation should be installed. It should be controlled by a time switch and
incorporateamotorizedvalvethatcanpreventgravitycirculationinthecircuit.
PipeSize(mm) Maximum Length (m)
10, 12 20
15, 22 12
28 8
35 and above 3
System Noise
Noise in pipework may occur as a result of expansion of pipework over joists or where the pipe has
beenlefttouchingotherpipesorapartofthebuildingstructure.Caremustbetakentoensurethat
the pipework is correctly bracketed, is not in tension or compression, and does not carry the weight
of components such as a circulation pump.
Setting The Hot Water Temperature
The hot water temperature is set on the dual thermostat by the competent person during the instal-
lation.Thedualthermostatshouldbesetto60°C.Ifyouareheatingwaterinthecylinderforthe
rsttime,orthetimecontrolsfortheDHWzonehavebeenoforaprolongedperiodoftime,the
cylinder may take additional time to heat up.
Inappropriate adjustments can lead to the damages in the system. In any changes
are made to the cylinder, the controls, the water and power supply lines or the expan-
sion relief components there is a risk of steam escaping or rupture to the system.

www.jouleuk.co.uk | www.joule.ie
14
TZ9-4.0-0000.5
TZ9-4.0-000.75
TZC-Y-0000000Z TZC-D-000000Z
TZU-000015X22
TZU-0000022X1
TZM-I-00022MM
TV-P-000012L
TV-P-000019L
TV-P-000024L
TZG-3.0-0.75L
TZG-3.0-0001L
TI-I-L-14-3-1
Unvented Kit Components
TV-P-000035L
TV-P-000050L TI-S-L-14-3-1

Cyclone Direct / Indirect Installation Guide
15
Capacity(ltr) 100 125 150 170 200 250 300 400 500
Inlet Group TZG-3.0-0.75L TZG-3.0-
0001L
Expansion Vessel TV-P-000019L TV-P-
000024L
TV-P-
000035L
TV-P-
000050L
T&P Valve TZ9-4.0-0000.5 TZ9-4.0-000.75
Tundish TZU-000015X22 TZU-0000
022X1
DualStat TZC-D-000000Z
Prim.Coil2-PZ.Valve TZM-I-00022MM
Unvented Kit Checklist
Direct Indirect
InletControlGroup InletControlGroup
Tundish Tundish
T&PValve(tted) T&PValve(tted)
3kWImmersion(tted) 3kWImmersion(tted)
Expansion Vessel Expansion Vessel
DualCylinderStat
2-portZoneValve

www.jouleuk.co.uk | www.joule.ie
16
NominalCapacity(ltr) 100 125 150 170 200 250 300 400 500
Direct Vertical
Storage volume V (ltr) 99 127 150 169 200 250 294 - -
Mixedwaterat40°C(ltr) 149 191 225 254 277 347 407 - -
Thedeclaredloadprole LLLLLLXL - -
ErP Rating CCCCCCC - -
EnergyEciency(%) 37 37 37 37 37 37 38 - -
Ann.el.consumption(kWh)
2773 2773 2785 2797 2764 2764 4426 - -
Sound Power Level (dB) 16 16 16 16 16 16 16 - -
ThermostatTemp.Set.(°C) 60 60 60 60 60 60 60 - -
DailyEn.UsageQelec
(kWh/24h) 12,916 12,916 12,989 13,062 12,868 12,868 20,477 - -
NominalCapacity(ltr) 100 125 150 170 200 250 300 400 500
Direct Horizontal
Storage volume V in ltr 99 127 150 169 200 250 294 - -
Mixedwaterat40°C(ltr) 149 191 225 254 277 347 407 - -
Thedeclaredloadprole LLLLLLXL - -
ErP Rating CCCCCCC - -
EnergyEciency(%) 37 37 37 37 37 37 38 - -
Ann.el.consumption(kWh)
2773 2773 2785 2797 2764 2764 4426
- -
Sound Power Level (dB) 16 16 16 16 16 16 16 - -
ThermostatTemp.Set.(°C) 60 60 60 60 60 60 60 - -
DailyEn.UsageQelec
(kWh/24h) 12,916 12,916 12,989 13,062 12,868 12,868 20,477 - -
ErP Product Fiche Information

Cyclone Direct / Indirect Installation Guide
17
NominalCapacity(ltr) 100 125 150 170 200 250 300 400 500
Indirect & Solar Vertical
Storage Volume V (ltr) 96 124 147 168 194 247 290 390 495
Standing Loss (kW) 44 52 55 58 78 87 92 102 115
ErP Rating B B B B CCCCC
NominalCapacity(ltr) 100 125 150 170 200 250 300 400 500
Indirect & Solar Horizontal
Storage Volume V (ltr) - - 147 168 194 247 290 - -
Standing Loss (kW) - - 63 69 89 97 104 - -
ErP Rating - - CCCCC - -
Maximum mains water supply pressure 2.5MPa (25 bar)
Operating pressure/PRV 0.3MPa (3 bar)
Expansion vessel pressure 1.0MPa (10 bar max)
Expansion relief valve setting 0.6MPa (6 bar)
Maximum design pressure 0.4MPa (4 bar)
T&P relief valve setting 0.7MPa/90°C(7bar)
Primary coil operating pressure (max) 0.3MPa (3 bar)
Immersion heater rating (a.c. supply only) single phase 3kW50/60Hz~
Storage weights (empty and full) SeeSpecicationTables
Indirect coil ratings SeeSpecicationTables
Pressure drop across the indirect coils SeeSpecicationTables
Coilsurfacearea SeeSpecicationTables
Technical Data
Indirect models in conformance with BS EN 12897:2016

www.jouleuk.co.uk | www.joule.ie
18
Indirect Vertical Technical Specication
2 Boiler Return
3 ColdWaterInlet
7 AquastatPocket
8 Boiler Flow
9 IncoloyImmersion(fact.tted)
10 Secondary Return
13 T&P Relief Valve
14 HotWaterDrawO
F
CC
D
A
B
13
10
9
8
7
3
2
E
G
H
14
15º
30º
93
30º

Cyclone Direct / Indirect Installation Guide
19
Dimensions 100 125 150 170 200 250 300 400 500
CylinderHeight(A,mm) 950 1030 1190 1310 1490 1815 1600 1570 1900
CylinderDiameter(B,mm) 500 540 540 540 540 540 600 710 710
ConnectionHeightC(mm) 188 196 196 196 196 196 218 225 225
ConnectionHeightD(mm) 333 211 341 341 341 361 383 405 455
ConnectionHeightE(mm) 478 511 486 486 516 586 608 675 745
ConnectionHeightF(mm) 543 651 651 651 581 651 673 740 810
ConnectionHeightG(mm) 628 751 786 881 981 1271 1153 1180 1440
ConnectionHeightH(mm) 743 800 911 1031 1211 1531 1333 1280 1640
Performance 100 125 150 170 200 250 300 400 500
HeatUpTime10ºCto60ºC(min) 22 23 26 27 31 37 42 52 54
1ºRe-Heattime(70%dr.o)15L/m 12 14 17 18 21 25 29 37 38
Weight Empty (kg) 27 30 34 37 41 49 56 62 89
Weight Full (kg) 152 155 184 207 241 299 356 462 589
Prim.CoilSurf.Area(m2) 0.58 0.58 0.58 0.58 0.67 0.77 0.77 1.16 1.25
Prim.CoilRat.@15L/m(kW,80±2ºC) 20 20 20 20 21 23 23 25 26
Pr.CoilPress.Drop@60L/hr(mbar) 45 45 45 45 65 76 76 88 90
Cont.Output(L/hr) 382 382 382 382 401 440 440 478 497
ConnectionSizes&Safety 100 125 150 170 200 250 300 400 500
Hot&ColdConn.Ø(mm) 22 22 22 22 22 22 22 28 28
CoilConnectionØ(mm) 22 22 22 22 22 22 22 22 22
SecondaryReturnØBSP(“) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.5
T&PConnectionØBSP(“) 0.5 0.5 0.5 0.5 0.5 0.5 0.5 0.75 0.75
3bar T&P Press. Sett. (bar) 777777777
Exp. Relief Set. (bar) 666666666

www.jouleuk.co.uk | www.joule.ie
20
Direct Vertical Technical Specication
3 ColdWaterInlet
9 IncoloyImmersion(fact.tted)
10 Secondary Return
13 T&P Relief Valve
14 HotWaterDrawO
15 SmartImmersion(fact.tted)
DC
A
B
13
10
9
3
F
G
14
15
E
30º 30º
10 3
This manual suits for next models
1
Table of contents
Other joule Water Heater manuals
Popular Water Heater manuals by other brands

German pool
German pool GPN user manual

German pool
German pool GPU Series user manual

AquaMAX
AquaMAX HP325-36-1B Series Owner's guide and installation instructions

Haier
Haier ES50V-F1(R) Service manual

SPX FLOW
SPX FLOW Johnson Pump AquaH instruction manual

McQuay
McQuay TGZ 040A Operation and maintenance manual

Fondital
Fondital LIPARI TN 11i Installation, use and maintenance guide

Midea
Midea MWH-38P3 instruction manual

Marey
Marey Gas Models instruction manual

Kenmore
Kenmore 153.333931 owner's manual

Sonnenkraft
Sonnenkraft DHW Compact Series manual

Lochinvar
Lochinvar EcoShield SHW60-325CE Installation, commissioning and maintenance instructions