manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. JYEBAO
  6. •
  7. Control Unit
  8. •
  9. JYEBAO SMA3200PA-0085/4*f User manual

JYEBAO SMA3200PA-0085/4*f User manual

Popular Control Unit manuals by other brands

Seitz 14A80 user manual

Seitz

Seitz 14A80 user manual

Wilo RS485 Installation and operating instructions

Wilo

Wilo RS485 Installation and operating instructions

Becker CentralControl CC41 Commissioning Instruction

Becker

Becker CentralControl CC41 Commissioning Instruction

SICK CDB650 operating instructions

SICK

SICK CDB650 operating instructions

Panduit NetKey NKP5E88M Series installation instructions

Panduit

Panduit NetKey NKP5E88M Series installation instructions

MX Options Concentric Petite Fitting instructions

MX

MX Options Concentric Petite Fitting instructions

Clean Water Systems Fleck 2510 Installation & start?up guide

Clean Water Systems

Clean Water Systems Fleck 2510 Installation & start?up guide

Fairchild FSB44104A user guide

Fairchild

Fairchild FSB44104A user guide

LEGRAND Wattstopper LMIN-104 installation instructions

LEGRAND

LEGRAND Wattstopper LMIN-104 installation instructions

PMK ATT10BNCS instruction manual

PMK

PMK ATT10BNCS instruction manual

Tektronix TDS3FFT user manual

Tektronix

Tektronix TDS3FFT user manual

Woodward easYgen Technical manual

Woodward

Woodward easYgen Technical manual

Balluff BNI EIP-502-105-R015 user guide

Balluff

Balluff BNI EIP-502-105-R015 user guide

NXP Semiconductors TWR-LS1021A Getting started

NXP Semiconductors

NXP Semiconductors TWR-LS1021A Getting started

Advantech PCM-3117 Startup manual

Advantech

Advantech PCM-3117 Startup manual

Danfoss MCO 101 manual

Danfoss

Danfoss MCO 101 manual

Moons' Lin Engineering R701P user manual

Moons'

Moons' Lin Engineering R701P user manual

Aventics RV1 operating instructions

Aventics

Aventics RV1 operating instructions

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.

This part number complies with RoHS.
Notice: JYEBAO reserves the right to make modications deemed appropriate.
SMA3200PA-0085/4*f SMA Plug Phase Adjustable
Weight:
Suitable Cables:
Parts Material Plating (Micro-inch)
Retainer Ring Beryllium Copper Tin-Zinc-Copper-Alloy 100 Over Copper 50
Gasket Silicon
Hex Nut Brass Tin-Zinc-Copper-Alloy 100 Over Copper 50
Insulator Teon
Collet Body Beryllium Copper Gold 4 Over Nickel-Phosphorous Alloy 80 Over Copper 20
Adjustment Nut Brass Tin-Zinc-Copper-Alloy 100 Over Copper 50
Contact Pin Beryllium Copper Gold 4 Over Nickel-Phosphorous Alloy 80 Over Copper 20
Body Brass Tin-Zinc-Copper-Alloy 100 Over Copper 50
Solder Barrel Brass Tin-Zinc-Copper-Alloy 100 Over Copper 50
Coupling Nut Brass Tin-Zinc-Copper-Alloy 100 Over Copper 50
8 HEX
30.3
Ø2.3
3.5
(1.193)
(.315 HEX)
(Ø.091)
(Ø.138)
Typical VSWR
Part Number 1~4Ghz 5~11Ghz 12~18Ghz
SMA3200PA-0085/4*f 1.1 1.15 2.35
Typical PHASE (DEGREES)
Part Number 1Ghz 2Ghz 3Ghz 4Ghz 5Ghz 6Ghz 7Ghz 8Ghz 9Ghz
SMA3200PA-0085/4*f
4º 8º 12º 16º 20º 24º 28º 32º 36º
10Ghz 11Ghz 12Ghz 13Ghz 14Ghz 15Ghz 16Ghz 17Ghz 18Ghz
40º 44º 48º 52º 56º 60º 64º 68º 72º
50Ω
This part number complies with RoHS.
Notice: JYEBAO reserves the right to make modications deemed appropriate.
PHASE TRIMMER INSTRUCTION
SMA3200PA-0085/4*f JYE BAO CO., LTD.
DIAGRAM ASSEMBLY INSTRUCTION
Step 1: STRIP AS SHOWN .
Step 2: INSERT PREPARED CABLE INTO CONNECTOR
BODY " A " AND USE SOLDERING FIXTURE
" ST-008 " , INSERT TOOL " ST-009 " AND LOCATOR
TOOL " ST-011 " TO FIX THE CONNECTOR.
SOLDER IN " X ".
A
BODY
3.3
[0.130]
XST-011
ST-008
ST-009 A
This part number complies with RoHS.
Notice: JYEBAO reserves the right to make modications deemed appropriate.
PHASE TRIMMER INSTRUCTION
SMA3200PA-0085/4*f JYE BAO CO., LTD.
DIAGRAM ASSEMBLY INSTRUCTION
Step 1: LOOSEN NUT1 BEFORE ADJUSTING PHASE.
USE SPANNER SIZE 8MM. (JYEBAO P/N: 8.0-9.0)
Step 2: LOOSEN NUT2 BEFORE ADJUSTING PHASE.
USE SPANNER SIZE 8MM. (JYEBAO P/N: 8.0-9.0)
Step 3: ADJUST TO THE REQUIRED PHASE: KEEP
BODY1 IN A FIXED POSITION AND ADJUST
PHASE BY MANUALLY TURNING BODY2.
Step 4: TIGHTEN NUT2 AFTER ADJUSTING PHASE.
USE SPANNER SIZE 8MM. (JYEBAO P/N: 8.0-9.0)
Step 5: TIGHTEN NUT1 AFTER ADJUSTING PHASE.
USE SPANNER SIZE 8MM. (JYEBAO P/N: 8.0-9.0)
NUT1
NUT2
BODY2BODY1
NUT2
NUT1