Kee Bio-Guard User manual


Installation Guidelines
The KEE Bio-Guard is supplied with the Motor disconnected.
Always plug in the Motor Connector before use.
The Bio-Guard Grease Digester
lThe KEE Bio-Guard unit is designed to automatically dispense enzyme based chemicals
into wastesystems to prevent the build up of fat and blockages in the drainage system. It
is battery operated for easy installation and can be programmed to dispense set volumes of
chemicals at set intervals to meet your requirements.
Installation
lLocate the Bio-Guard dispenser as close to the chemical container as possible, ideally
within 5 meters. Try to avoid exposure to direct heat, moisture or steam.
l Theunitisalreadyttedwithwallxingbracketsandissuppliedwiththenecessaryxing
screws and raw plugs for installation.
lThe unit is also supplied with 4 meters of pvc tubing and a tube support. The tube support
end of the tube should be placed in the chemical container and the other end connected to
the inlet connector of the Bio-Guard pump.
(NB:WarmingofthePVCtubewillassistinttingittotheInletconnector.Shownby
arrowsonpumpface).
lAny excess PVC tubing can be used to connect from the outlet connector to the waste pipe
or grease trap. An adjustable pipe connector is also available from KEE Services Limited if
required.
Batteries
lThe KEE Bio-Guard is supplied with a self contained battery pack, which should provide at
least 12 months operating life based on standard usage.
lTo change the battery, start by removing the lid. (unscrewthe4plasticscrews,oneineach
corner).
lThen disconnect the battery pack by removing the small white connector with a red and
black wire. (seediagramonpage3).
l Removetheoldbatterypack,tthenewpackandplugintheconnector.
Priming
lPress the ‘PRIME/TEST BUTTON’ontheundersideoftheunittollthetubingwithchemical
and to test the pump.

Installation Guidelines
Clock Set: : Volume Set
All KEE Bio-Guard Units are supplied pre-set.
(Seesheetinsideunitforsettings)
To check and adjust the clock
lTo check the clock, press and hold the ‘CLOCK’ button. The display should show the
currenthour of day. (NOTE:theclockonlydisplayshours).
lTo set the clock, press and hold the ‘CLOCK’ button, after 5 seconds the hours will
increase. Let go of the button when the hour required is displayed. Always set the clock to
the nearest hour.
To check and adjust delivery start time
lPress the ‘DELIVERY START’ button. The display will show the delivery start time in hours.
(Adotwillalsobedisplayedtodistinguishthisfromtheclockdisplay).
lTo change the delivery start time press and hold the ‘DELIVERY START’ button. After 5
seconds the start time hour will increase. Let go of the button when the start hour required
is displayed.
To check and adjust delivery volume
lPress the ‘DELIVERY VOLUME’ button. The display will show the delivery setting
(from1to9). Each number represents a different delivery volume as shown below.
1. 100mls 4. 250mls 7. 400mls
2. 150mls 5. 300mls 8. 450mls
3. 200mls 6. 350mls 9. 500mls
lTo adjust the delivery volume, press and hold the ‘DELVERY VOLUME’ button until the
required program/volume number is displayed.
Battery Connect:
: Delivery Time

KEE provide a cost eective and convenient chemical
enzyme re-order service to ensure that your Bio-Guard
Grease Digester is protecting your drains at all times.
Our National team of KEE engineers are also available
to deliver and install chemical rells as part of the KEE
Bio-Guard Service & Maintenance Package.
Ordering replacement dosing liquid
Contact KEE today for more
information on:
01296 634500
or to arrange for a free no obligation quotation
to resolve your fat, oil and grease issue.
Specialists in Domestic & Industrial Wastewater Treatment
KEE Services Ltd, College Road North, Aston Clinton, Aylesbury, Bucks HP22 5EZ
KEE reserve the right to alter content without prior notice. Produced on behalf of KEE by: www.connellmarketing.com
© KEE 2019
KEE’s total commitment to guaranteed reliability has meant KEE Services is a trusted preferred supplier to
many industry sectors including, waste management, water treatment, dairy, food, beverage and leisure
sectors.
We operate to the highest quality standards (ISO 9001) throughout the company in research and
development, manufacturing and product testing, refurbishments, service & maintenance and user training.
Once our products are despatched our involvement does not stop there. Our after sales service
includes installation, maintenance contracts, national twenty four hour service turnaround and access to
our telephone help line.
We have a UK network of experienced KEE Engineers and specially trained agents and distributors in countries
around the world. Please refer to our website for more information.
Table of contents