
17
VENTCONNECTIONSTOBLOWERASSEMBLY
Figure21showstheoptimalplacementofthe2"to3"or3"to4"reducer;
however,theventcanbereducedatanypointintheventsystemaslong
asthemaximumventlengthisnotexceeded.
FIGURE21.
VENTINGAND INSTALLATION
Planthelayoutofthe ventsystem fromtheventterminationtothewater
heaterconsideringall ofthe90°and 45°elbowsplusthenumberof feet
ofpipe thatwouldbe neededtoinstall thetotalventsystem.The water
heatermustbeventedtotheoutdoorsasdescribedintheseinstructions.
DONOTconnectthiswaterheatertoanexistingventorchimney.Itmust
beventedseparatelyfromallotherappliances.Nonmetallicventmaybe
usedifithas“HeatDeflectionTemperature”(HDT@66psi)or455kPaof
atleast 157°For69°C.Typicalnonmetallicventmaterialsmeeting this
requirementare:PVC(Schedule40,ASTMD-1785),CoexCellularCore
(Schedule40,ASTMF-441),CPVC(Schedule40,ASTMD-2846),ABS
(Schedule40,ASTMD-2661).Thefittings, otherthanthesupplied Vent
Terminationshouldbeequivalent tothe following:PVC(Schedule40,
DWV,ASTMD-2665),CPVC(Schedule40, DWV,ASTMF-438),ABS
(Schedule40DWV,ASTMD-2661).
The cement used should be as recommended by the vent pipe
manufacturer.Seetheinstructions onpages20and21fortheproper
methodof cuttingandcementing thePVCpipeandfittings.
Theunitmaybeventedhorizontallythrough awallor verticallythrough
theroof. Pipe runsmust beadequately supportedalong bothvertical
and horizontal runs as follows:
• ForSchedule40,2"PVC,ABS, CoexCellularCore ventpipe:Every
3feet(0.9 m).
• ForSchedule40,3"PVC,ABS, CoexCellularCore ventpipe:Every
3.5feet(1.1 m).
• ForSchedule40,4"PVC,ABS, CoexCellularCore ventpipe:Every
4feet(1.2 m).
• ForSchedule 40,2" CPVCvent pipe:Every5feet(1.5m).
• ForSchedule 40,3" CPVCvent pipe:Every6feet(1.8m).
• ForSchedule 40,4" CPVCvent pipe:Every6.5feet(2.0 m).
Itisimperativethatthefirsthanger(orsupport)belocatedonthehorizontal
runimmediately adjacenttothefirst90-degree elbowfromthevertical
rise. Support method used should isolate the vent pipe from the floor
joistsor otherstructuralmemberstoprevent thetransmissionofnoise
and vibration. Do not support, pin, or otherwise secure the venting
system in a way that restricts the normal thermal expansion and
contractionofthechosen ventingmaterial.
Ifthewater heateris being installedas areplacementfor anexisting
powervented heaterinpre-existingventing,athoroughinspectionof
theexisting ventingsystemmust beperformed priortoany installation
work. Verify that the correct material as detailed above has been
used, and that the minimum or maximum vent lengths and terminal
locationasdetailedinthismanualhave beenmet. Carefully inspectthe
entireventing systemforanysignsof cracksor fractures,particularly
atthe jointsbetween elbowsand otherfittings andthe straightruns of
ventpipe. Check thesystemforsignsof saggingor otherstresses in
thejointsasaresultofmisalignment ofanycomponents inthesystem.
If any of these conditions are found, they must be corrected in
accordance with the venting instructions in this manual before
completingthe installationand puttingthe waterheaterintoservice.
Exceptwhere instructedinthis manual,themixing of2",3" and4"vent
pipeisNOTALLOWED. If2"pipeistobeused,thena2"to3"bellreducer
isrecommended. Figure 21shows therecommendedlocationforthe
bell reducer. If the bell reducer is located at the rubber boot on the
blower assembly, then a short section of 3" vent pipe needs to be
installed in the rubber boot for proper connection of the 2" to 3" bell
reducer.Thatlengthcanbetheminimumlengthrequiredfortheconnection.
If 4" pipe is to be used, then a 3" to 4" bell reducer is recommended.
Figure21 showstherecommendedlocationfor thebellreducer. Ifthe
bellreducer islocatedat therubberbootonthe blowerassembly, then
ashort sectionof3"ventpipeneedsto beinstalled inthe rubberboot
forproperconnection ofthe 3"to 4"bellreducer. Thatlength canbe
theminimumlengthrequiredfortheconnection.
Thewaterheaterscoveredbythismanualaresuppliedwitha2"Schedule
40PVC22.5° Vent Terminal. If you decideto ventwith 3"or4" pipe,a
Schedule40DWV45°VentTerminalmustbeused. Foryourconvenience,
wehave includedascreenforboth 3"and 4"VentTerminals.
The vent piping should be connected to the blower with a rubber
adapterandsecured withhose clamps.The adapterandclamps are
providedwiththeheater.
Eventhoughthe fluegas temperatureleavingthe bloweris between
140°F (69°C) and 175°F (79°C), some installations will have water
vaporcondenseinthe ventpiping.Ifthisoccurs,thenadequatemeans
of draining and disposing of the condensate needs to be made by
the installer.
CONDENSATION
Condensateformationdoesnotoccurinallinstallationsofpower vented
waterheaters,butshouldbeprotectedagainst oninstallationswhere it
canform intheventing system.Condensationintheventingsystemof
powervented waterheaters isdependentupon installationconditions
including,butnotlimitedtoambienttemperatureandhumidityofinstallation
location, ambient temperature and humidity of venting space, vent
dischargeandslope,andproductusage.Incertainconditions,installations
in unconditioned space or having long horizontal or vertical vent runs
mayaccumulatecondensate.In theseconditions,the ventpipeshould
beslopeddownward awayfromtheblowerassembly1/4" (6.4mm)per
fivefeet(1.5m)of pipebut notmorethan11/2"(3.8cm)inthetotal vent
length. If the vent piping is vented level or sloped upwards away from
theblowerassembly,then adequatemeansfor draininganddisposing
of the condensate needs to be made by the installer (if condensate is
detected).Ifyouhavecondensate,thena3/8"drainhosecanbeconnected
tothe built-indrainport ofthe rubberbooton theblowerassembly.For
yourconvenience,therubber bootissupplied witharemovablecapon
thebuilt-indrain port.Priortooperating thewaterheater,makesure the
removablecapisinstalledonthedrainport(ifadrainhoseisnotneeded).
MAXIMUMVENTLENGTHS
40,000BTU Units:
For 2" Venting, the maximum equivalent feet of pipe allowed
is40 feet(12.2m).Thisdoesnotincludethesupplied venttermination
forthewater heater. Forthe2" venting,one90°elbow isapproximately
equal to 5 feet (1.5 m). One 45° elbow is approximately equal to 2.5
feet(0.8m). Itisrecommended thatat least2 feet(0.6 m)of spacing
beusedin betweenall 45°elbowsand all90°elbows.
For 3" Venting, the maximum equivalent feet of pipe allowed
is120feet(36.6m).ThisdoesnotincludetheVentTermination(supplied
locally) for the water heater. For the 3" venting, one 90° elbow is
approximatelyequal to5feet (1.5m). One45° elbowisapproximately
equalto 2.5feet(0.8m). Itis recommendedthatatleast2 feet(0.6m)
ofspacingbe usedin between all45° elbowsandall 90°elbows.
For 4" Venting, the maximum equivalent feet of pipe allowed
is160feet(48.8m).ThisdoesnotincludetheVentTermination(supplied
locally) for the water heater. For the 4" venting, one 90° elbow is
approximatelyequal to8feet (2.4m). One45° elbowisapproximately
equalto 4feet(1.2 m). Itisrecommended thatatleast 2feet(0.6 m)of
spacingbeused inbetween all45°elbows andall 90°elbows.