
Installation/Operation/Maintenance
2. Setting pressure
After installing finished, the valve must be set, follow the step below.
a) Close the valve upstream of the gate valve or ball valve.
b) Turn the adjusting screw clockwise, compression the spring of the valve.
c) The upstream gate valve or ball valve slightly open, put a small amount of fluid through
the easy adjustment. In this case the valve adjustment screw is locked, so there is no fluid
through.
d) Increase the upstream pressure, up to sustaining pressure or relief pressure.
e) Turn the adjusting screw counterclockwise slowly, until micro fluid outflow, then turn the
adjustment screw clockwise slightly, so that no fluid outflow valve.
f) Tighten the adjusting screw on the locking nut, ensure no change pressure set point, the
upstream gate valve or ball valve completely open, the adjusting of relief/sustaining
pressure valve is finished.
3. Maintaining
a) Referring to Fig.2, construction of the pressure reducing valve. If the rubber part of one of
the signed point 1, 2 or 5 is destroyed, the leakage of the valve will occur, and the
corresponding part should be changed.
b) If the valve has no function of relief/sustaining pressure, it should be inspected from two
points of part in Fig.2 that is, inspecting the leakage of point 3 and 4 in Fig. 2.
c) If the problem still exists, contact out factory.
Fig.2