
ASSEMBLY INSTRUCTIONS
8
3. Assemble the 4 upright extensions with 2 arms
(B) and 1 sleeve (C) per upright. Determine the
height of the shelf you desire and ensure all
upright extensions are the same length if the top
channel is level.
If installing on angled joists, determine the length
for each upright extension to allow for a level
shelf installation. Use bolts (BB), and nuts (CC)
and washers (FF) as shown to assemble the
upright extensions to the desired height.
5. Install the top channels now with the attached
upright extensions using 4 lag screws (AA) for
each channel. Screw into the pre-drilled holes.
4. Attach each of the 4 upright extensions using
bolts (BB), nuts (CC) and washers (FF) to the
top channels as shown.
Ensure the head of the bolts (BB) are on the
inside of the top channel (A) and the nuts (CC)
are on the outside of the top channel (A).
IMPORTANT: The lag screws (AA) must be installed straight into the wood joist. Do not
over-tighten the lag screws.
3
4
5
Use a 12 mm size socket and ratchet to hand
tighten the lag screws into the joists.
Hardware Used
Ø 8 x 20 mm Screw x 8
Ø 8 mm Nut x 8
x 8Ø 19 mm Washers
Hardware Used
Ø 8 x 20 mm Screw x 4
Ø 8 mm Nut x 4
x 4Ø 19 mm Washers
Hardware Used
Ø 8 x 76 mm Screw x 8