Kobalt 45576PKDLG User manual

ITEM # 0186952
48 in. X 48 in.
OVERHEAD STORAGE UNIT
MODEL #45576PKDLG
Questions, problems, missing parts? Before returning to your retailer, call our customer
service department at 1-888-3KOBALT, 8 a.m. – 8 p.m., EST, Monday - Friday.
Français p.13
Español p.25
1

TABLE OF CONTENTS
2
Safety Information 3
4
5
5
6
11
11
11
12
12
Package Contents
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
Hardware Contents
Preparation
Assembly Instructions
Operation Instructions
Care and Maintenance
Troubleshooting
Warranty
Replacement Parts List

SAFETY INFORMATION
3
Please read and understand this entire manual before attempting to assemble, operate or install
the product. If you have any questions regarding the product, please call customer service at
1-888-3KOBALT, 8 a.m. – 8 p.m., EST, Monday - Friday.
ELECTRICAL, PLUMBING,
OR GAS LINES MAY BE IN WALL.
Before cutting, drilling or hammering
verify their location. If needed,
contact your electrician, plumber, or
service person.
WARNING
CEILING/FLOOR JOIST
OVERLOAD
Do not install more than one
Kobalt Overhead Strorage unit on
the same supporting floor or ceiling
joists to prevent structural failure.
WARNING
PERSONAL INJURY HAZARD
Failure to properly install according
to the manufacturer’s guidelines
could result in serious injury or
death.
WARNING
POTENTIAL FALL HAZARD
During installation of this item,
avoid overreaching and
overextending while on a ladder.
WARNING
CAUTION
POTENTIAL EYE HAZARD
Wear protective eyewear during installation.

PACKAGE CONTENTS
4
8
2
Arm
Top ChannelA
4SleeveC
2Bottom ChannelD
8SlatE
F
G
H
2Hanging Bracket
4End Cap
B
14Spacer
Part Description Quantity

HARDWARE CONTENTS
5
PREPARATION
Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and diagram above. If any part is missing or damaged, do not attempt to
assemble the product. Contact customer service for replacement parts.
Estimated Assembly Time: 60 minutes
Tools Required for Assembly (not included): Ladder, tape measure, stud finder, pencil,
power drill and 3/16 in. drill bit, adjustable wrench, socket ratchet, and 12 mm size socket,
framing square.
Ø 8 x 76 mm Screw
QTY:8
Ø 8 x 20 mm Screw
QTY:16
Ø 6 x 48 mm Pin
QTY:4
Ø 19 mm Washer
QTY:16
Ø 8 mm Nut
QTY:16
R-Clasp
QTY:4

ASSEMBLY INSTRUCTIONS
6
LOCATING CEILING JOISTS
1. Locate the wood ceiling joists and determine
the direction in which they are running in the
area where installation is desired. The top
channel can run parallel to the ceiling joists as
illustrated in 1A and 1B or perpendicular
(90 degrees) to the ceiling joists as illustrated
in 1C.
1A
1B
1C
LQ
LQ
LQ
LQ
LQ LQ LQ
LQ
LQ

ASSEMBLY INSTRUCTIONS
7
2A. FOR PARALLEL-TO-JOIST INSTALLATION:
Select 2 ceiling joists which are 48 in. apart.
Using the top channel as a pattern, mark holes
every 12 in. along the length of the top channel
(see Figure 2A). Pre-drill the holes with a 3/16 in.
size wood drill bit.
2B. FOR PARALLEL-TO-JOIST AND OVER-THE-
JOIST INSTALLATION:
For exposed joists, there is a second option of
installing the top channel over the top of the
joists (see Figure 2B). Follow same direction
as above to mark holes for pre-drilling.
IMPORTANT: Top channels must be mounted square to each other and the pre-drilled holes
must be solidly in the wood joists.
2C. FOR PERPENDICULAR-TO-JOIST
INSTALLATION:
Locate the joists along the length of the top
channel and mark holes at the joists locations
using the top channel as a pattern. The center
hole of the top channel to center hole of the
other top channel should measure exactly 48 in.
Pre-drill the marks with a 3/16 in. size wood drill
2A
2B
2C
INSTALLING THE TOP CHANNEL
NOTE: THERE ARE 3 STANDARD JOIST
CONFIGURATIONS
bit.

ASSEMBLY INSTRUCTIONS
8
3. Assemble the 4 upright extensions with 2 arms
(B) and 1 sleeve (C) per upright. Determine the
height of the shelf you desire and ensure all
upright extensions are the same length if the top
channel is level.
If installing on angled joists, determine the length
for each upright extension to allow for a level
shelf installation. Use bolts (BB), and nuts (CC)
and washers (FF) as shown to assemble the
upright extensions to the desired height.
5. Install the top channels now with the attached
upright extensions using 4 lag screws (AA) for
each channel. Screw into the pre-drilled holes.
4. Attach each of the 4 upright extensions using
bolts (BB), nuts (CC) and washers (FF) to the
top channels as shown.
Ensure the head of the bolts (BB) are on the
inside of the top channel (A) and the nuts (CC)
are on the outside of the top channel (A).
IMPORTANT: The lag screws (AA) must be installed straight into the wood joist. Do not
over-tighten the lag screws.
3
4
5
Use a 12 mm size socket and ratchet to hand
tighten the lag screws into the joists.
Hardware Used
Ø 8 x 20 mm Screw x 8
Ø 8 mm Nut x 8
x 8Ø 19 mm Washers
Hardware Used
Ø 8 x 20 mm Screw x 4
Ø 8 mm Nut x 4
x 4Ø 19 mm Washers
Hardware Used
Ø 8 x 76 mm Screw x 8

ASSEMBLY INSTRUCTIONS
9
6. Locate the bottom channels (D) and insert on
only one end a clevis pin (EE) and secure with
the R-clasp (DD). Be sure to insert the clevis
pin (EE) on the same ends of both bottom
channels (D) so that the other end is completely
open and ready to receive the slats to be
installed in Step # 9 below. Place the end caps
(G) onto the clevis pins (EE) as shown.
8. Snap the spacers (H) into 9 of the 10 slats (E)
into the holes on the side of the slats (see
Figure 8). Two spacers (H) per slat (E) are
needed. One slat will not require spacers.
The slat with no spacers attached will be installed
first.
6
8
7
7. Attach the bottom channels (D) to the upright
extensions so that the Kobalt logo is facing out
(see Figure 7). Attach channels bolts (BB), nuts
(CC) and washers (FF).
R-Clasp
Ø 6 x 48 mm Pin
Hardware Used
x 2
x 2
Hardware Used
Ø 8 x 20 mm Screw x 4
Ø 8 mm Nut x 4
x 4
Ø 19 mm Washers

ASSEMBLY INSTRUCTIONS
10
9. Slide the first slat (E) which has no spacers
attached into the bottom channel (D) on both ends.
Ensure the slat groove is “locked” into the bottom
channel and not sitting on top of the channel
(see Figure 9). Repeat the process of sliding
each slat with the spacers side first into the
bottom channel to complete the shelf.
11. Install optional hanging bracket (F) as shown
for additional storage.
10. After all slats are properly installed into the
bottom channel, place the clevis pin (EE) into
the end of the bottom channels and insert the R
clasp (DD) into the pin to secure the slats in
position. Place the endcaps (G) onto the clevis
pins (EE) as shown.
IMPORTANT: Ensure all nuts, bolts and clevis pins are tight and secure. Do not load with
more than 250 lbs, evenly distributed. During first load of shelf, test the strength of the unit by
carefully loading. Remove valuable property underneath the unit during the initial load test.
9
10
11
R-Clasp
Ø 6 x 48 mm Pin
Hardware Used
x 2
x 2

11
OPERATION INSTRUCTIONS
CARE AND MAINTENANCE
TROUBLESHOOTING
Follow extreme caution when loading and unloading items from the Kobalt Overhead Storage Unit.
Weight load capacity is up to 250 lbs, evenly distributed.
On an annual basis, it is recommended to double check all connections and re-tighten all nuts and bolts.
Clean with water and a paper or cloth towel as needed.
If you have any questions regarding the product, please call customer service at 1-888-3KOBALT,
8 a.m. – 8 p.m., EST, Monday - Friday.
PROBLEM POSSIBLE CAUSE CORRECTIVE ACTION
Slats will not fit into
bottom channel
Top rails are not 48 in. apart. Re-install top channels to be 48 in. apart
measured from center hole to center hole.

12
WARRANTY
REPLACEMENT PARTS LIST
3-Year Hassle Free Warranty. You should never have a problem with your Kobalt® tools. However,
if you do, return the item to the place of purchase for a free replacement. No questions asked.
For replacement parts, call our customer service department at 1-888-3KOBALT, 8 a.m. – 8 p.m., EST,
Monday - Friday.
KOBALT® is a registered trademark of LF, LLC. All Rights Reserved.
Printed in China
Arm
Top ChannelA
SleeveC
Bottom ChannelD
SlatE
F
G
H
Hanging Bracket
AA
End Cap
BB
B
Spacer
CC
R-ClaspDD
EE
FF
Part Description Part #
HC45576
HA45576
HB45576
HD45576
HE45576
HF45576
HH45576
HI45576
2TP48DKN
8TP13DKN
HK45576DKN
HJ45576DKN
8QM32DKN
HL45576DKN
Ø 19 mm Washer
Ø 8 x 76 mm Screw
Ø 8 x 20 mm Screw
Ø 8 mm Nut
Ø 6 x 48 mm Pin

ARTICLE # 0186952
UNITÉ DE RANGEMENT SURÉLEVÉE DE
1,22 M X 1,22 M
MODÈLE #45576PKDLG
Des questions, des problèmes, des pièces manquantes? Avant de retourner l’article au
détaillant, appelez notre service à la clientèle au 1-888-3KOBALT, entre 8 h et 20 h (HNE),
du lundi au vendredi.
13

TABLE DES MATIÈRES
14
Consignes de sécurité 15
16
17
17
18
23
23
23
24
24
Contenu de l’emballage
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
..............................................................................................................
Quincaillerie incluse
Préparation
Instructions pour l’assemblage
Mode d’emploi
Entretien
Dépannage
Garantie
Liste des pièces de rechange

CONSIGNES DE SÉCURITÉ
15
Assurez-vous de lire et de comprendre l’intégralité du présent manuel avant de tenter d’assembler,
d’utiliser ou d’installer le produit. Si vous avez des questions, veuillez communiquer avec notre
service à la clientèle au 1 888 3KOBALT, entre 8 h et 20 h (HNE), du lundi au vendredi.
DES CONDUITES D’ÉLECTRICITÉ,
D’EAU OU DE GAZ PEUVENT
ÊTRE PRÉSENTES DANS LE MUR
Avant d’entailler, de percer ou de
marteler un mur, vérifiez qu’aucune
conduite n’est présente. Au besoin,
communiquez avec un électricien, un
plombier ou une personne qualifiée.
SURCHARGE DES SOLIVES DE
PLAFOND OU DE PLANCHER
Pour éviter tout effondrement,
n’installez pas plus d’une unité de
rangement surélevée Kobalt sur
une solive de plafond ou de
plancher.
RISQUE DE BLESSURE
Le non-respect des directives du
fabricant lors de l’installation peut
entraîner des blessures graves,
voire la mort.
AVERTISSEMENT AVERTISSEMENT
RISQUE DE CHUTE
Évitez de tendre les bras trop loin
lorsque vous êtes sur une échelle
pour installer l’article.
MISE EN GARDE
RISQUE DE BLESSURE AUX YEUX
Portez des lunettes de protection pendant
l’installation.
AVERTISSEMENT
AVERTISSEMENT

CONTENU DE L’EMBALLAGE
16
8
2
Bras
Traverse supérieureA
4ManchonC
2Traverse inférieureD
8LamelleE
F
G
H
2Support suspendu
4Embout
B
14Entretoise
Pièce Description Quantité

QUINCAILLERIE INCLUSE
17
PRÉPARATION
Avant de commencer l’assemblage du produit, assurez-vous d’avoir toutes les pièces. Comparez
les pièces dans l’emballage avec la liste et l’illustration ci-dessus. S’il y a des pièces manquantes
ou endommagées, ne tentez pas d’assembler le produit. Communiquez avec le service à la clientèle
pour obtenir des pièces de rechange.
Temps d’assemblage approximatif : 60 minutes.
Outils nécessaires pour l’assemblage (non inclus) : échelle, ruban à mesurer, détecteur de
montant, crayon, perceuse électrique et foret de 3/16 po, clé à molette, clé à cliquet et douille
de 12 mm, équerre de charpentier.
Rondelle de Ø 19 mm
Vis de Ø 8 x 76 mm
QTÉ : 8
Vis de Ø 8 x 20 mm
QTÉ : 16
QTÉ : 16 QTÉ : 16
QTÉ : 4
QTÉ : 4
Écrou de Ø 8 mm
Attache en R
Axe à épaulement
de Ø 6 x 48 mm

INSTRUCTIONS POUR L’ASSEMBLAGE
18
REPÉRAGE DES SOLIVES DE PLAFOND
1. Trouvez les solives de plafond en bois, puis
déterminez leur orientation à l’endroit où vous
voulez installer l’unité. Les traverses
supérieures peuvent être parallèles (figures 1A
et 1B) ou perpendiculaires (figure 1C) aux
solives de plafond.
1A
1B
1C
SR
SR
SR
SR
SR
SR SR
SR
SR

INSTRUCTIONS POUR L’ASSEMBLAGE
19
2A. INSTALLATION PARALLÈLE AUX SOLIVES :
Choisissez deux solives de plafond séparées
par une distance de 1,22 m. En utilisant une
traverse supérieure comme outil de mesure,
marquez l’emplacement des trous à percer tous
les 30,48 cm le long de la traverse (figure 2A).
Percez des avant-trous à l’aide d’un foret de
3/16 po pour le bois.
2B. INSTALLATION SUR LES SOLIVES :
Vous pouvez installer les traverses supérieures
sur les solives si elles sont découvertes (figure
2B). Suivez les instructions ci-dessus pour
marquer l’emplacement des trous.
IMPORTANT : Assurez-vous que les traverses supérieures sont parallèles et que les avant-trous
ont été faits dans les solives en bois.
2C. INSTALLATION PERPENDICULAIRE AUX
SOLIVES :
Trouvez les solives le long de la traverse
supérieure, puis marquez l’emplacement des
trous à percer. La distance qui sépare le trou
central de chacune des traverses supérieures
doit mesurer exactement 1,22 m. Percez des
avant-trous à l’aide d’un foret de 3/16 po pour le
bois.
2A
2B
2C
INSTALLATION DES TRAVERSES SUPÉRIEURES
REMARQUE : IL EXISTE TROIS FAÇONS D’INSTALLER L’UNITÉ SUR DES SOLIVES

INSTRUCTIONS POUR L’ASSEMBLAGE
20
3. Assemblez les quatre montants à l’aide de deux
bras (B) et d’un manchon (C) par montant.
Déterminez quelle sera la hauteur de la tablette et
assurez-vous que tous les montants sont de la
même longueur (les traverses supérieures doivent
être de niveau).
Si vous installez l’unité sur des solives obliques,
déterminez la longueur de chaque montant afin
qve la tablette soit de niveau des écrous (CC) et
des rondelles (FF), comme le montre la figure 3,
pour donner aux montants la longueur voulue.
5. Installez les traverses supérieures accompagnées
des montants au moyen de quatre vis à bois (AA)
par traverse. Vissez-les dans les avant-trous.
Utilisez une clé à cliquet et une douille de 12 mm
pour serrer à la main les vis dans les solives.
4. Fixez les quatre montants aux traverses
supérieures (A) à l’aide de vis (BB), d’écrous
(CC) et de rondelles (FF), comme le montre la
figure 4.
Assurez-vous que les têtes de vis se trouvent à
l’intérieur des traverses et que les écrous se
trouvent à l’extérieur des traverses.
IMPORTANT : Les vis (AA) doivent former un angle droit avec la surface des solives. Évitez de
les serrer excessivement.
3
4
5
Quincaillerie utilisée
Vis de Ø 8 x 20 mm x 8
Écrou de Ø 8 mm x 8
x 8
Rondelle de Ø 19 mm
Quincaillerie utilisée
Vis de Ø 8 x 20 mm x 4
Écrou de Ø 8 mm x 4
x 4
Rondelle de Ø 19 mm
Quincaillerie utilisée
Vis de Ø 8 x 76 mm x 8
This manual suits for next models
1
Table of contents
Languages:
Popular Storage manuals by other brands

CAP
CAP RK-CB16H Assembly instructions

Brocade Communications Systems
Brocade Communications Systems 1606 Administrator's guide

IOCELL
IOCELL CellDisk user manual

Seagate
Seagate BARRACUDA 18FC installation guide

Western Digital
Western Digital WD Caviar WD800BB Specification sheet

Thetford
Thetford SMART TOTE2 owner's manual