While the laminates are drying glue the
walls together. It is recommended to glue in
the remaining parts from LCC 03-67 and
LCC 03-68 before gluing walls but it can be
done afterwards. Glue the front lower win-
dows flush with the back of LCC 03-00 and
the right side lower door flush with the back
of LCC 03-75 (door shown on previous
page). Recommended way of gluing walls is
to apply glue to the back of the interlocking
bricks. Additional glue can be applied to the
spaces between the interlocking bricks but
that will increase the squeezeout. Care
should be taken not to put too much glue or
let it harden fully before fitting the supports
and the floor.
Next step in assembly is to complete the in-
ternal structure of the signal box. Ideally it
should be done while the glue from previous
step is not dry yet. Glue the short strips from
LCC 03-17 in the corners of signal box. En-
sure they are flush with the bottom of the
signal box. After that glue in the floor or
leave it out if to make assembling interior
easier. Now leave the model to dry enough
that the walls do not come apart when floor
is installed. Floor is designed to be very
tightly fitting. In rare instance the floor will
seem too big. In such case it is possible to
gently force it into position which should be
on top of the four short strips. There is a
small chance that the floor pushes the walls
apart. If this appear to happen take the floor
out and trim slightly. It is also possible to
clamp the model gently to ensure there is no
gaps at the corners.
Next step in assembly is gluing the lami-
nates to the signal box body. Start with LCC
03-68 and LCC 03-71. Follow with the two
remaining elements. Ensure that the parts
marked blue are glued in flush with the out-
side of the signal box.
Recommended glue
application position
PAGE 2 OUT OF 3