Lenovo ThinkSystem Micro DataCenter User manual

ThinkSystem Micro DataCenter 12U Rack
Cabinet
User Guide
Machine Type: 7D2B and 7D2N

First Edition (February 2020)
© Copyright Lenovo 2020.
L M TED AND RESTR CTED R GHTS NOT CE: f data or software is delivered pursuant to a General Services
Administration (GSA) contract, use, reproduction, or disclosure is subject to restrictions set forth in Contract No.
GS-35F-05925.

Contents
Contents . . . . . . . . . . . . . . . . . i
Safety . . . . . . . . . . . . . . . . . . iii
Safety statement iv
Chapter 1. ntroduction . . . . . . . . . 1
Chapter 2. Specifications . . . . . . . . 3
Supported servers 3
Chapter 3. Parts Listing . . . . . . . . . 5
Chapter 4. Move the rack cabinet. . . . 7
Casters 8
Crane lifter 10
Chapter 5. Managing cables . . . . . 15
Chapter 6. Hardware removal,
installation and conversion . . . . . . 17
Removing and installing the side panels 17
Remove the side panels 17
Install the side panels 17
Removing, installing and reversing the doors 18
Remove the door 18
Install the door 21
Reverse the door 24
Door position monitor device replacement 31
Remove the door position monitor device 32
Install the door position monitor device 33
Appendix A. Getting help and
technical assistance . . . . . . . . . . 35
Before you call 35
Contacting Support 36
Appendix B. Notices. . . . . . . . . . 37
Trademarks 38
ndex . . . . . . . . . . . . . . . . . . 39
© Copyright Lenovo 2020 i

ii ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Safety
Before installing this product, read the Safety Information
Antes de instalar este produto, leia as Informações de Segurança
Læs sikkerhedsforskrifterne, før du installerer dette produkt
Lees voordat u dit product installeert eerst de veiligheidsvoorschriften
Ennen kuin asennat tämän tuotteen, lue turvaohjeet kohdasta Safety Information
Avant d'installer ce produit, lisez les consignes de sécurité
Vor der Installation dieses Produkts die Sicherheitshinweise lesen
Prima di installare questo prodotto, leggere le Informazioni sulla Sicurezza
Les sikkerhetsinformasjonen (Safety Information) før du installerer dette produktet
Antes de instalar este produto, leia as Informações sobre Segurança
© Copyright Lenovo 2020 iii

Antes de instalar este producto, lea la información de seguridad
Läs säkerhetsinformationen innan du installerar den här produkten
Safety statement
Read this section carefully before operating any task on the cabinet
R001
CAUT ON:
To ensure safety, all configurations of the rack cabinet must be certified by a nationally recognized
testing laboratory to verify compliance with country-specific safety regulations. This process ensures
that the end product remains safe for the operator and service personnel under normal and
foreseeable misuse conditions.
R002
DANGER
• Always lower the leveling pads on the rack cabinet.
• Always install stabilizer brackets on the rack cabinet.
• Always install the heaviest devices in the bottom of the rack cabinet.
• Always install servers and optional devices starting from the bottom of the rack cabinet.
R003
iv ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

DANGER
• Do not extend more than one sliding device at a time.
• The maximum allowable weight for a device on slide rails is 80 kg (176 lb). Do not install a sliding
device that exceeds this weight.
S029
DANGER
Electrical current from power, telephone, and communication cables is hazardous.
To avoid a shock hazard:
• Do not connect or disconnect any cables or perform installation, maintenance, or reconfiguration
of this product during an electrical storm.
• Connect all power cords to a properly wired and grounded power source.
• Connect to properly wired power sources any equipment that will be attached to this product.
• When possible, use one hand only to connect or disconnect signal cables.
• Never turn on any equipment when there is evidence of fire, water, or structural damage.
• Disconnect the attached ac power cords, dc power sources, network connections,
telecommunications systems, and serial cables before you open the device covers, unless you
are instructed otherwise in the installation and configuration procedures.
• Connect and disconnect cables as described in the following table when installing, moving, or
opening covers on this product or attached devices.
To Connect: To Disconnect:
1 Turn OFF all power sources and equipment that is to
be attached to this product
2 Attach signal cables to the product
3 Attach power cords to the product
• For ac systems, use appliance inlets
• For dc systems, ensure correct polarity of -48 V dc
connections: RTN is + and -48 V dc is - Earth
ground should use a two-hole lug for safety
4 Attach signal cables to other devices
5 Connect power cords to their sources
6 Turn ON all the power sources
1 Turn OFF all power sources and equipment that is to
be attached to this product
• For ac systems, remove all power cords from the
chassis power receptacles or interrupt power at
the ac power distribution unit
• For dc systems, disconnect dc power sources at
the breaker panel or by turning off the power
source Then, remove the dc cables
2 Remove the signal cables from the connectors
3 Remove all cables from the devices
© Copyright Lenovo 2020 v

S036
18 - 32 kg (39 - 70 lb) 32 - 55 kg (70 - 121 lb) > 55 kg (121 lb)
CAUT ON:
Use safe practices when lifting.
R006
CAUT ON:
Do not place any object on top of a rack-mounted device unless that rack-mounted device is intended
for use as a shelf.
R007
DANGER
• Connect power cords from devices in the rack cabinet to electrical outlets that are near the rack
cabinet and are easily accessible.
• Each rack cabinet might have more than one power cord. Be sure to disconnect all power cords
in the rack cabinet before you service any device in the rack cabinet.
• nstall an emergency-power-off switch if more than one power device (power distribution unit or
uninterruptible power supply) is installed in the same rack cabinet.
• Connect all devices that are installed in a rack cabinet to power devices that are installed in the
same rack cabinet. Do not connect a power cord from a device that is installed in one rack
cabinet to a power device that is installed in a different rack cabinet.
R009
CAUT ON:
vi ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Removing components from the upper positions in the Enterprise Rack cabinet improves rack
stability during relocation. Follow these general guidelines whenever you relocate a populated rack
cabinet within a room or building:
• Reduce the weight of the rack cabinet by removing equipment starting at the top of the rack
cabinet. When possible, restore the rack cabinet to the configuration of the rack cabinet as you
received it. f this configuration is not known, you must do the following:
– Remove all devices in the 32 U position and above.
– Make sure that the heaviest devices are installed in the bottom of the rack cabinet.
– Make sure that there are no empty U positions between devices installed in the rack cabinet
below the 32 U position.
• f the rack cabinet that you are relocating is part of a suite of rack cabinets, detach the rack cabinet
from the suite.
• nspect the route that you plan to take, to eliminate potential hazards.
• Make sure that the route that you choose can support the weight of the loaded rack cabinet. See
the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet.
• Make sure that all door openings are at least 760 x 2030 mm (30 x 80 in.)
• Make sure that all devices, shelves, drawers, doors, and cables are secure.
• Make sure that the four leveling pads are raised to their highest positions.
• Make sure that no stabilizer bracket is installed on the rack cabinet.
• Do not use a ramp that is inclined more than 10 degrees.
• When the rack cabinet is in the new location, do the following:
– Lower the four leveling pads.
– nstall stabilizer brackets on the rack cabinet.
– f you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowest
position to the highest position.
f a long-distance relocation is required, restore the rack cabinet to the configuration of the rack
cabinet as you received it. Pack the rack cabinet in the original packaging material, or equivalent.
Also, lower the leveling pads to raise the casters off the pallet and bolt the rack cabinet to the pallet.
© Copyright Lenovo 2020 vii

viii ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Chapter 1. ntroduction
See this documentation to learn about specification details and installation instructions of ThinkSystem
Micro DataCenter 12U Rack Cabinet
ThinkSystem Micro DataCenter 12U Rack Cabinet is a 12U cabinet designed for Micro DataCenter servers
Figure 1. ThinkSystem Micro DataCenter 12U Rack Cabinet
The cabinet comes with a limited warranty For details about the warranty, see:
https://support lenovo com/us/en/solutions/ht503310
For details about your specific warranty, see:
http://datacentersupport lenovo com/warrantylookup
© Copyright Lenovo 2020 1

2ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Chapter 2. Specifications
See this section for information about ThinkSystem Micro DataCenter 12U Rack Cabinet
Dimension and weight
Dimension • Length: 1200 mm (47 2 inch)
• Width: 600 mm (23 6 inch)
• Height: 660 mm (26 0 inch)
Weight • With packaging: 113 kg (249 1 lbs)
• Without packaging: 61 kg (134 5 lbs)
Supported servers
See this section for information about the servers that are supported by the rack cabinet
This rack cabinet supports the following servers:
• SR250: https://thinksystem lenovofiles com/help/topic/7Y51/pdf_files html
• SR530: https://thinksystem lenovofiles com/help/topic/7X07/pdf_files html
• SR550: https://thinksystem lenovofiles com/help/topic/7X03/pdf_files html
• SR570: https://thinksystem lenovofiles com/help/topic/7Y02/pdf_files html
• SR590: https://thinksystem lenovofiles com/help/topic/7X98/pdf_files html
• SR630: https://thinksystem lenovofiles com/help/topic/7X01/pdf_files html
• SR650: https://thinksystem lenovofiles com/help/topic/7X05/pdf_files html
• SR670: https://thinksystem lenovofiles com/help/topic/7Y37/pdf_files html
• ST250: https://thinksystem lenovofiles com/help/topic/7Y45/pdf_files html
• ST550: https://thinksystem lenovofiles com/help/topic/7X09/pdf_files html
• SD530: https://thinksystem lenovofiles com/help/topic/7X21/pdf_files html
• SE350: https://thinksystem lenovofiles com/help/topic/SE350/pdf_files html
© Copyright Lenovo 2020 3

4ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Chapter 3. Parts Listing
Figure 2. Rack cabinet components
Table 1. Rack cabinet components
1 Rack cabinet frame 6 Removable and reversible door
2 Rear cable flanges 7 Key
3 Vertical mounting flanges 8 Hardware bag (see “Hardware bag” on page 6)
4 Removable side panel 9 Removable side panel
5 Bolt-down bracket
© Copyright Lenovo 2020 5

Hardware bag
Figure 3. Components in the har ware bag
Table 2. Components in the har ware bag
1 Four M5x12 screws 6 20 plastic cup washers
2 20 M6x16 screws 7 One 13mm/14mm wrench
3 Four hole plugs 8 20 cage nuts
4 One cage nut tool 9 Ten flange nuts
5 One T30/#2 Phillips wrench 10 15 cable straps
6ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Chapter 4. Move the rack cabinet
S037
CAUT ON:
The weight of this part or unit is more than 55 kg (121.2 lb). t takes specially trained persons, a lifting
device, or both to safely lift this part or unit.
Attention - Tip hazard.
mportant:
• The task in this section requires more than two people
• The cabinet could be easily tipped Move it with extreme caution
WARN NG: Failure to follow these instructions could result in equipment damage, severe injuries, or
death.
Before moving the rack cabinet, complete the following steps:
1 Remove the screws that secure the bolt-down brackets on the front and rear side of the cabinet with the
13-mm socket wrench
© Copyright Lenovo 2020 7

Figure 4. Removing the bolt- own brackets
Two options are available when moving the cabinet:
Casters
S037
CAUT ON:
The weight of this part or unit is more than 55 kg (121.2 lb). t takes specially trained persons, a lifting
device, or both to safely lift this part or unit.
Complete the following steps to lift and move the cabinet to the designated site:
Step 1 Remove the ramps from the box that is shipped with the cabinet, and install them on the front side
of the pallet
8ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide

Figure 5. Installing the ramps
Step 2 Make sure the leveling feet are up If not, insert a 13-mm open-ended wrench into the screw above
one of the feet, and turn it counterclockwise until it no longer makes firm contact with the floor
Then, repeat this procedure on the other three feet
Figure 6. A justing the rack cabinet feet
Chapter 4 Move the rack cabinet 9

Step 3 Push the cabinet from either the front or the rear until it reaches the designated site
Figure 7. Sli ing the cabinet own from the pallet
Notes:
• Make sure that more than two people are handling the cabinet while sliding it down from the
ramps
• Do not stand in the path of the rack
Crane lifter
Attention - Drop hazard.
Complete the following steps to lift and move the cabinet to the designated site:
Step 1 Remove the four plugs from the four corners on the top of the cabinet frame
10 ThinkSystem Micro DataCenter 12U Rack Cabinet User Guide
This manual suits for next models
2
Table of contents
Other Lenovo Rack & Stand manuals