manuals.online logo
Brands
  1. Home
  2. •
  3. Brands
  4. •
  5. LevALERT
  6. •
  7. Measuring Instrument
  8. •
  9. LevALERT 9700 User manual

LevALERT 9700 User manual

CORRUGATED BIN WALLS
Install LevALERT Indicator on the
INCURVE of the corrugation.
Always use a center punch and hammer
to mark location to prevent drill bit from
walking.
TROUBLESHOOTING
CAUTION: LevALERT may not work
with all types of grain spreaders.
TOOLS NEEDED
1. Power Drill
2. 1-1/8” (29mm) Holesaw
3. Round Metal File
4. Center Punch & Hammer
5. Pliers & Channel Lock Pliers
INSIDE
BIN
OUTSIDE
BIN
INSTALL ON
INCURVE
SELECT LOCATION
The LevALERT Model 9700 is designed
to be installed at any position along a
90° vertical wall section.
Do not install on sloped areas of bin or
within 8” (21cm) of obstructions inside
the bin such as protruding nuts/bolts,
ladders, wall stiffeners, etc.
NOTE: Account for the angle of
fill when determining installation
location.
YES
NO
NO
ANGLE
OF FILL
SAFETY PRECAUTIONS: Secure your ladder and use a safety line. Wear
safety goggles while drilling hole.
STUCK IN YELLOW POSITION?
High moisture or coated granular materials can stick to the bin wall. Visually check
inside bin to see if granular material has stuck onto the bin wall against the activator.
If granular material is not causing the problem, tighten the return spring tension.
Turn the thumbscrew on the bottom of the indicator in a clockwise direction until the
indicator is completely black.
ONLY DISPLAYS PARTIALLY YELLOW?
Reduce the spring tension by turning the thumbscrew on the bottom of the indicator
counterclockwise.
INSTALL INDICATOR ASSEMBLY
1. Place Gasket on the back of the Indicator. FIG. 6
2. Insert the tip of the Connecting Rod into the back of the Indicator (orange ring).
NOTE: The groove in the connecting rod must set into the orange ring.
3. Tilt the Indicator approximately 30% to align with the yellow line on the Sticker.
Push the Indicator onto the Activator Frame and turn counterclockwise until it
locks into place. FIG. 7
INSTALL CONNECTING ROD
1. Insert the Connecting Rod into the orange o-ring of the Activator Frame. FIG. 5
2. Push the Connecting Rod all the way down until you hit the bend. FIG. 5
3. Lightly pull up on the Connecting Rod until you feel the groove of the Connecting
Rod pop into the o-ring. FIG. 5
NOTE: The Connecting Rod contains a groove for the o-ring.
CONTACT INFORMATION
LevALERT, Inc.
15105 Minnetonka Ind. Rd.
Suite 228
Minnetonka, MN 55345
612-643-1784
[email protected]
www.levalert.com
Thank you for using
LevALERT Bin Level Indicators!
MODEL 9700
INSTRUCTIONS
MODEL 9700
INSTRUCTIONS
FIG. 6 FIG. 7
GROOVE
FIG. 5
DRILL HOLE AND APPLY STICKER
1. Wipe bin wall clean with a damp cloth to remove dust, oil and grease.
2. Apply the black diamond-shaped sticker by first removing only the ¼” (6mm) wide
center strip of backing. Position the sticker horizontally on the bin wall.
PACKAGE CONTENTS
3. Use a punch and hammer to mark the 1-1/8” (29mm) center hole of the sticker.
This will prevent your drill bit from walking.
4. Drill the center ¼” (6mm) hole in the bin wall.
5. Enlarge the ¼” (6mm) hole to 1-1/8” (29mm) diameter using a 1-1/8” (29 mm)
holesaw containing a ¼” rod for greatest accuracy. If using a twist drill bit,
gradually increase the hole size to 1-1/8” (29mm).
6. File hole to remove burrs and sharp edges. Remove metal shavings from bin floor.
INSTALL ACTIVATOR ASSEMBLY
1. Thread the Installation Plug through the Nut, with the points facing the bin. FIG. 1
2. Thread the Installation Plug through the Spacer. FIG. 1
3. Slide the Installation Plug straight into the slotted holes of the Activator Frame and
turn counterclockwise to lock into place. FIG. 2
4. Remove the green plastic stick from the middle of the Activator Fabric. FIG. 2
5. Tightly roll the Activator Fabric around the Activator Frame.
6. Insert the rolled Activator through the hole. The Stop Ring will prevent the
Activator from falling into the bin.
7. Pull the Stop Ring. Line up the yellow arrow on the Sticker with the yellow
line on the Activator Frame. FIG. 3
8. With the yellow aligned, keep light tension on the Stop Ring and start to thread
the Nut onto the Activator Frame by hand. To tighten the Nut, hold the Installation
Plug with channel lock pliers and turn using pliers. Do not over tighten.
9. Remove the Installation Plug by turning it clockwise. FIG. 4
IMPORTANT: Keep the left and right hand tips of the sticker as horizontal as
possible. If not horizontal, lift and reposition the sticker. When correct, remove
the upper and lower halves of backing and press sticker firmly onto the bin wall.
NOTE: Minimum temperature for adhesion to metal wall bin is 32° F. (0° C.)
NOTE: For 2.66” corrugated bin wall, have the points of the Nut face away from
the bin wall and do not use the Spacer.
FIG. 1
FIG. 3
FIG. 2
FIG. 4
INDICATOR
NUT
STOP
RING
GASKET
CONNECTING
ROD
ACTIVATOR
FRAME
ACTIVATOR
FABRIC
SPACER
STICKER
INSTALLATION
PLUG
21
DURING THE FIRST FILLING/
EMPTYING OF YOUR BIN,
MONITOR THE OPERATION OF
THE LEVALERT INDICATOR CLOSELY
TO ENSURE THE UNIT IS WORKING
PROPERLY. ADJUSTMENTS MAY BE
NECESSARY. NOT FOR USE IN FDA
APPLICATIONS.
INSTALLATION VIDEO
Watch our installation video
at www.levalert.com/
installation. You can also
access by scanning the QR
Code with your phone.
DISCARD
GREEN
PLASTIC
MODEL 9700
INSTRUCTIONS
MODEL 9700
INSTRUCTIONS

Popular Measuring Instrument manuals by other brands

IMR 2800 P manual

IMR

IMR 2800 P manual

Epilady EP720-04 instruction manual

Epilady

Epilady EP720-04 instruction manual

Red Seal Measurement neptune S Operating and maintenance manual

Red Seal Measurement

Red Seal Measurement neptune S Operating and maintenance manual

FineTek EE310 Operation manual

FineTek

FineTek EE310 Operation manual

Hanna Instruments HALO2 HI9810382 instruction manual

Hanna Instruments

Hanna Instruments HALO2 HI9810382 instruction manual

Raycus RFL-A200D user guide

Raycus

Raycus RFL-A200D user guide

MOBILE-ALERTS MA10200 quick reference

MOBILE-ALERTS

MOBILE-ALERTS MA10200 quick reference

Fluke 377 user manual

Fluke

Fluke 377 user manual

Global Industrial 316111 Assembly instructions

Global Industrial

Global Industrial 316111 Assembly instructions

Parkside 316730_1904 Operation and safety notes

Parkside

Parkside 316730_1904 Operation and safety notes

Influx Technology INU300 user manual

Influx Technology

Influx Technology INU300 user manual

Lutron Electronics CD-4322 Operation manual

Lutron Electronics

Lutron Electronics CD-4322 Operation manual

Niigata seiki D HL Series user manual

Niigata seiki

Niigata seiki D HL Series user manual

dynasonics TFXL Series Operation & maintenance manual

dynasonics

dynasonics TFXL Series Operation & maintenance manual

Ditel JUNIOR JR-D Quick installation guide

Ditel

Ditel JUNIOR JR-D Quick installation guide

Ele 521-050 operating instructions

Ele

Ele 521-050 operating instructions

Honeywell AUTOCUBE 8200 user guide

Honeywell

Honeywell AUTOCUBE 8200 user guide

Sony DG10B Series instruction manual

Sony

Sony DG10B Series instruction manual

manuals.online logo
manuals.online logoBrands
  • About & Mission
  • Contact us
  • Privacy Policy
  • Terms and Conditions

Copyright 2025 Manuals.Online. All Rights Reserved.