Add oil and check the order of phase.
After installing lift as Picture 4 required and connecting hydraulic circuit, electric
circuit and air loop, operate it as following:
-open the hydraulic oil tank, add 18L of hydraulic oil into the oil tank, the hydraulic
oil is provided by the user.
Make sure the clean of hydraulic oil, prevent any impurity into the oil line, lead the
digest of the oil line and no working of the solenoid valve.
-push on the power, press the “up” button, check whether the motor turns clockwise
(looking downward), if not, push off the power, exchange two enter line wires.
When turn on power, the high voltage will exist in the control box, only authorized
1. Open all 3 ball stop valve ( Rotate the valve G 1~2 times in a counter clockwise
direction, make handle of the valve H and I parallel to valve’s body ).
2. Press “UP” button SB1, motor start to lift the two platforms to the apex.
3. Close the valve G( Rotate the valve G 1~2 times in a clockwise direction ).
4. Vent air by Loosen the screws at the top of main oil cyclinders, then press “UP”
button SB1.Tighten the screws after there is no air vent out from the oil cyclinder.
5. Open the valve G( Rotate the valve G 1~2 times in a clockwise direction ) and close
the valve H and I(make handle of the valve H and I perpendicular to the body of
valve).Press “DOWN” button SB2 to let the two platforms down to the ground.
6. Repeat the step 2 to step 5 for 4-5 times until there is no air out.
7. Finish the oil make-up and air bleeding process.
Platforms level micro adjustment
A. Press the “UP” button SB1 to lift the two platforms to going up to about 100 mm.
B. Close the valve G,and open the valve H OR I.
C. Inching “UP” button and “DOWN” button to adjust the platform to going up and
down to let them at the same level. Then close the valve I OR the valve H .Open the
Check: whether the locations of two safety-pawl equipments are agile and reliable,
no leakage of the hydraulic system and the air system.
GROUND BOLTS INSTALLATION:
The ground bolts installation must start after the expiry date on the maintenance of
concert, otherwise, it will affect the quality of solidity.
-adjust the parallel of the platform and the distance of two platform as Picture 4
-fix the anchor bolts with a percussion electric drill ( percussion drill bit is of 16),
drill to 120mm hole and clean the hole.
-use light hammer to install the ground holts into the hole ( need not install the central
expanded nail of ground bolts, install it after level adjustment.)