
BEFORE USE ....
Thank you for choosing us. Before use, please check con-
tents of the package you received as outlined below.
If you have any problems or questions with the product,
please contact our sales office or representatives.
■PACKAGE INCLUDES:
Installation base..................................................................(1)
■MODEL NO.
Confirm Model No. marking on the product to be exactly
what you ordered.
■INSTRUCTION MANUAL
This manual describes necessary points of caution when
you use this product, including installation, connection and
basic maintenance procedures.
POINTS OF CAUTION
■POWER INPUT RATING & OPERATIONAL RANGE
• Refer to signal conditioner data sheet. Choose the same
power input specification for all units.
■GENERAL PRECAUTIONS
• Before you remove the unit from the base or mount it,
turn off the power supply and input signal for safety.
■ENVIRONMENT
• Indoor use.
• When heavy dust or metal particles are present in the
air, install the installation base inside proper housing and
ventilate it.
• Do not install the unit where it is subjected to continuous
vibration. Do not subject the unit to physical impact.
• Environmental temperature must be within -5 to +55°C
(23 to 131°F) with relative humidity within 30 to 90% RH
in order to ensure adequate life span and operation.
• Be sure that the ventilation slits are not covered with ca-
bles, etc.
■WIRING
• Do not install cables close to noise sources (relay drive
cable, high frequency line, etc.).
• Do not bind these cables together with those in which
noises are present. Do not install them in the same duct.
COMPONENT IDENTIFICATION
■REAR VIEW
Specifications
MOUNTING REQUIREMENTS unit: mm (inch)
■M2BS2-04
100 (3.94)
190 (7.48)
4–M5 SCREW
■M2BS2-08
100 (3.94)
280 (11.02)
4–M5 SCREW
■M2BS2-16
100 (3.94)
460 (18.11)
4–M5 SCREW
INSTALLATION BASE MODEL M2BS2
EM-5007 Rev.1 P. 1 / 4
MG CO., LTD. www.mgco.jp
5-2-55 Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
INSTRUCTION MANUAL