
Installationsplan / Installation plan: PT 8331/8333/8335/8337
Datum / Date: 12.01.2011 Seite / Page: 9
Machine-side connection according to ISO 7-1
Length of connection hose (supplied)
Stopcock to be provided on site.
Use of gas plug connection is not permissible on account of
restricted flow volume with respect to heater rating.
Connection thread (on site) schwanken)
Connection pressure according to DIN EN 437
cf. operating and installation instructions
Connection thread (on site) schwanken)
On-site connection with high-precision steel pipe
according to DIN 2391/DIN2393, with smooth pipe end,
Connection sleeve ½" × ⅜" and ⅜" threaded union × DN
12 for steel pipe supplied with machine. ⅜" × DN 12 threaded union for steel pipe.
Connection pressure according to DIN EN 437
cf. operating and installation instructions
Connection to gas supply must comply with national
regulations.
Note installation instructions for gas-heated Miele tumble
dryers.
Max. nominal air flow in vented mode (PT 8337 only)
Nominal air flow (PT 8331/8333/8335 only)
Max. permissible pressure loss
Connection on machine side (ext. diameter)
Connection pipe provided on site (int. diameter)
This tumble dryer is a gas-burning machine without a flow-
operated safety device with fan downstream of heat
exchanger.
Technical design: B22 (as standard)
Waste gas pipework must be pressure-tight.
Waste gas connections should be performed in accordance
with national and local regulations and may require approval.
Note installation instructions for gas-heated Miele tumble
dryers.
As relative humidity inside the vent ducting can be as high as
100%, suitable measures must be taken to prevent a
backflow of condensate into the machine.
Standard connection: Air intake from installation site
Unobstructed air intake into room recommended
(corresponding to 3 times the vent cross-section of
machine)
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Alternative connection: Ducted air intake (from outside
building)
Connector on machine (int. diameter)
Connection pipe provided on site (ext. diameter)
Lid removal exposes live components! For safety reasons,
the pipe connected for central air intake should be at least
900 mm long and secured using two screws.