
Connection with male thread
Connection with washers and nut
Accessories to be ordered separately.
If necessary, equipotential bonding with good galvanic contact must be provided in accordance with
all appropriate national and local regulations.
Connection thread (on site)
Supply lead Steam valve Length
Steam valve, steam filter and steam fancet must be provided on site.
The steam valve should be installed close to the steam connection. Note installation instructions for
steam-heated Miele tumble dryers.
Condensate
connection Connection thread (on site) ½" internal thread
Steam valve, steam filter and steam faucet must be provided on-site.
Installation of the steam trap needs to allow complete drainage of the heater element during
machine downtime. This means, no condensate is left in the heater element. Installation of an
inverted bucket steam trap is recommended.
Max. nominal air flow in vented mode
Max. permissible pressure loss
Connection on machine side (ext. diameter)
Connection pipe provided on site (int. diameter)
As relative humidity inside the vent duct can be as high as 100%, suitable measures must be taken
to prevent a backflow of condensate into the machine.
Standard connection: Air intake from installation site
Recommended unobstructed air intake into room
(corresponding to 3 times the vent cross-section of
A sufficient supply of fresh air should be ensured to
replace the air extracted.
Alternative connection: Ducted air intake (from outside
Connector on machine (int. diameter)
Connection pipe provided on site (ext. diameter)
Lid removal exposes live components! For safety reasons,
the pipe connected for central air intake should be at least
35 7/16” [900 mm] long and secured using two screws.
Installation plan: PT 8807 D
Date: 29-Jan-2015 Page: 14