
ASSEMBLY & INSTALLATION
7
NOTE: It might be easier during the mounting stage to leave this hardware only finger
tight to facilitate lining up the hitch hole for the clevis pin. You will be instructed to
tighten this hardware later in this manual.
NOTE: The holes closest to the
mounting hooks are to be used for
all 700 series model tractors, see
Figure 4 (1), while the two holes
closest to the cross mount are for all
other models, see Figure 4 (2). The
hitch support bracket will need
to be flipped to enable alignment
of the proper holes depending on
the model of tractor this bagger is
being installed on.
Mounting Assembly on 700
Series Tractors
1. Place the hooked ends of the
mounting assembly over the
shoulder bolts on the mounting
brackets previously installed on the
tractor and line up the hitch support
bracket center hole with the hole on
the tractor’s hitch. See Figure 5.
2. Install the clevis pin (711-0309A)
from hardware pack 689-02364 into
the tractor’s hitch and secure with a
cotter pin (714-0117). See Figure 6.
3. Install two clevis pins through the
mounting assembly and secure to
the 700 series mounting brackets
installed earlier with cotter pins
provided in the hardware pack.
See Figure 6.
NOTE: The clevis pin can be fed down
through the hitch plate and secured
underneath with the cotter pin, or it may
be easier to feed the clevis pin up through
the hitch plate hole and secure with the cotter pin on the topside. Insert the cotter pin into
the top hole, closest to the head of the pin. You may need to push up on the pin to make the
hole accessible.
IMPORTANT: If you decided to leave the hitch support only finger tight during the assembly
process, tighten all of the hardware securely at this time.
Mount Assembly on
All Other Tractors
1. Place the hooked ends of the
mounting assembly over the shoulder
bolts on the back of the tractor frame
and line up the hitch support bracket
center hole with the hole on the
tractor’s hitch. See Figure 7.
Figure 5
Align hole on bracket
with hole on tractor
Figure 6
Align hole on
bracket with hole
on tractor
Figure 8
Figure 7
3. If not already done so by the
factory, install the bagger screen
(731-06504) into the bagger cover
(631-04292) by first inserting the
end closest to the side with the
cutout (1) into the mounting hole,
as in Figure 13.
4. Make sure to feed the screen under
the lip. Clip in the other side by
pushing the screen into the
provided cutout (2). See Figure 14.
5. Install the bagger cover onto the
hanger assembly. The cover goes
inside of the two mounting tabs.
See Figure 15.
6. Slide the hinge pin (711-04988) into
the hole located on the mounting
tab, as in Figure 16. Use the cut-out
window (See inset, Figure 16) to
line up the hinge pin on the other
side and push pin all the way in
until it reaches the end-stop. At this
point the pin clips into place and
is secured by a tab in the bagger
cover. See Figure 17.
7. Open the hood by pushing in on the
rear, right-side tab with your right
hand, as seen in (1), and lifting the
cover with your left hand in the
center rear of the bagger cover (2).
See Figure 18.
8. Install both bag assemblies (664-05104) onto the hanger assembly rail by inserting
the front edge in first (1) and setting the back edge down until it fits into the
assembly (2). See Figure 19.
Make sure screen sits
under the cover’s lip
2
Figure 14
Figure 15
Figure 16 Figure 17
2
1
Figure 18
2
1
Figure 19
2. Install the clevis pin (710-0309A) from
hardware pack 689-02364 into the
tractor’s hitch and secure with the
cotter pin (714-0117). See Figure 8.
NOTE: The clevis pin can be fed down
through the hitch plate and secured
underneath with the cotter pin, or it may
be easier to feed the clevis pin up through
the hitch plate hole and secure with the
cotter pin on the topside. The latter
method may be preferred since it can be
easier to insert the cotter pin. Either way
will work, the decision should be based on
operator preference.
Install the Vertical Bagger Support
1. Install the vertical bagger support
(683-04519C) onto the mounting
assembly on the tractor by hooking
it over the cross mounting bracket as
seen in Figure 9.
2. Align the vertical bagger support
with the mounting hole that best
suits the deck size of your tractor. See
Figure 9.
NOTE: Hole “A” is suggested
for 38” decks, while Hole “B” is
suggested for 42” decks, and Hole
“C” suggested for 46” decks. Some
kits may contain plates with deck size
suggestions instead of letters.
3. Secure the vertical bagger support to
the cross mounting bracket using a
carriage bolt (710-0276) and wing
knob (720-04122) from hardware
pack 689-02364. See Figure 10.
Install Hanger Assembly
1. Install and secure the hanger
assembly (683-04461C) onto the
vertical bagger support using two
carriage bolts (710-0276), two cup
washers (736-0242) and two lock
nuts (712-04063) from hardware
pack 689-02364. See Figure 11.
Assembling Remaining
Bagger Components
1. Snap the upper chute support
(731-06497) in place by first
clipping the side portion onto the
hanger assembly rail (1), as shown
in Figure 12.
2. Snap the front side of the upper
chute support to the rail (2), as
shown in Figure 12.
38” Deck
42” Deck
46” Deck
A B C
Figure 9
Figure 10
Figure 11
2
1
Figure 12
1
Figure 13