
New Era Pump Systems Inc.
www.SyringePump.com
NE-9000-G Peristaltic Pump
Model NE-9000-G1/16” Peristaltic Pump Head Setup
PERI-HEAD-KIT-YG4 installation Manual
1. Install Tubing onto Pump Head
1.1.
Prepare New Tubing
a) Cut tubing to 5 3/8” (136mm)
b) Insert 2 couplers into the ends of the tubing.
c) Wrap 2 tie wraps on the ends of the tubing. Position wrap knots facing the same direction
1.2.Install New Tubing
a) Remove Rotor.
b) Add grease to the Cassette shaft and the surface of
New Tubing (See gray area below).
c) Return Rotor to shaft of Cassette.
d) With both knots of the tubing facing as shown, install
one knot into the guide.
e) Pull out the Rotor a little bit.
f) Rotate Rotor away from installed knot, and place
tubing between the Cassette and the Roller.
g) Install the other knot into the guide.
1.3.Install Cassette onto Base
a) Rotate Rotor so that it fits into axle.
b) Attach Cassette onto Base of Pump by placing (a) into (b).
c) Turn Cassette clockwise until it stops.
d) Verify that each indent of the Cassette is matched perfectly
with each marking on the Base of the Pump.
e) Prime Pump before Starting Dispense Cycle.
Warning:
Be careful not to be injured by the edge of the
Pump parts.