Deaerating Equipment
Nexus PSD
Operation & Maintenance Manual
Rev!3.0!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 2 / 35
Customer Details
Please fill in information future reference:
Company: Contact:
Address: Tel No:
Fax No:
Post Code: E-mail:
Equipment Details
Details of model and serial number may be found on the label
Model: Serial No:
Purchase date: Purchased From:
!
Note:!
A!competent!and!qualified!mechanical!contractor!must!be!used!to!install,!commission!and!service!this!
equipment.!This!Operation!&!Maintenance!manual!must!be!followed.!!
!
For!further!advise!on!installation!please!contact!Nexus!Valve!![1-888-900-0947!-!www.nexusvalve.com]!
!
Remember!to!fill!in!installation!and!commissioning!details!for!future!reference.!
!
!
!
!
!
!
!
!
!
!
!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 3 / 35
Commissioning Record
Digital!Controller!
!
As!Found!
On!Completion!
Start!Pressure!
!
!
PSI!
Stop!Pressure!
!
!
PSI!
Alarm!Pressure!
!
!
PSI!
Normal!Minutes!
!
!
Mins!
Turbo!Hours!
!
!
Hours!
Timeout!Minutes!
!
!
Mins!
Purge!Seconds!
!
!
Secs!
Pump!Count!
!
!
!
Pump!Hours!
!
!
!
Alarm!Count!
!
!
!
Power!Interrupted!
!
!
!
Pumps!Sense!
!
!
Y/N!
Turbo!Mode!
!
!
Y/N!
Service!Reminder!
!
!
Y/N!
ID!Number!!
!
!
!
!
Contractor
Signature:
Date:
/
/
Customer
Signature:
Date:
/
/

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 4 / 35
Contents'
!
Customer!Details!...............................................................................................................................................................................................!2!
Equipment!Details!.............................................................................................................................................................................................!2!
Commissioning!Record!......................................................................................................................................................................................!3!
About!this!Manual!.............................................................................................................................................................................................!5!
Conventions!used!in!this!Manual!.................................................................................................................................................................!5!
Typography!...................................................................................................................................................................................................!5!
Where!to!find!more!Information!..................................................................................................................................................................!6!
Equipment!Overview!.........................................................................................................................................................................................!6!
Principal!of!Operation!Vacuum!Deaerator!...................................................................................................................................................!7!
Installation/Capacity!.........................................................................................................................................................................................!8!
Pipe!Connections!..........................................................................................................................................................................................!8!
Typical!Installation!Diagram!Vacuum!Deaerator!..........................................................................................................................................!9!
Floor!Standing!Clearance!and!Connection!Requirements!...............................................................................................................................!10!
Electrical!Power!Supply!..............................................................................................................................................................................!11!
Fault!Contacts!.............................................................................................................................................................................................!12!
Commissioning!................................................................................................................................................................................................!13!
Pre-Commissioning!Checklist!.....................................................................................................................................................................!13!
Controller!Overview!...................................................................................................................................................................................!14!
Deaerator!Controller!Programming!...........................................................................................................................................................!15!
Purge!Seconds!Reference!Times!............................................................................................................................................................!16!
Hydraulic!Commissioning!...........................................................................................................................................................................!17!
Operation!........................................................................................................................................................................................................!19!
For!practical!guidance!on!diagnosing!and!rectifying!faults,!please!refer!to!the!Troubleshooting!section!of!this!manual.!........................!19!
Deaerating!Fault!Codes!..............................................................................................................................................................................!19!
Troubleshooting!..............................................................................................................................................................................................!21!
Maintenance!...................................................................................................................................................................................................!22!
Wiring!location!list!..........................................................................................................................................................................................!25!
Spares!..............................................................................................................................................................................................................!26!
Electrical!Items!...........................................................................................................................................................................................!26!
Deaerator!Unit!................................................................................................................................................................................................!27!
Service!Log!......................................................................................................................................................................................................!28!
Warranty!Statement!.......................................................................................................................................................................................!30!
Warranty!Details!.............................................................................................................................................................................................!31!
Notes!...............................................................................................................................................................................................................!32!
Notes!...............................................................................................................................................................................................................!33!
Notes!...............................................................................................................................................................................................................!34!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 5 / 35
!
About this Manual
This!Operation!and!Maintenance!Manual!contains!all!the!necessary!information!to!install,!commission,!operate!
and!maintain!Vacuum!Deaeration!equipment.!
It!is!recommended!to!read!all!parts!of!this!manual!before!undertaking!any!work!on!the!equipment.!
Conventions'used'in'this'Manual'
This!manual!makes!use!of!symbols!to!identify!key!pieces!of!information.!Please!take!note!of!the!following!
symbols!and!their!meaning:!
!
DANGER!–!Important!safety!related!information!intended!to!prevent!injury!and/or!damage!to!the!
equipment,!system!or!property.!
!
CAUTION!-!Important!information!intended!to!prevent!damage!to!the!equipment,!system!or!
property.!
!
IMPORTANT!-!Important!information!intended!to!ensure!that!the!equipment!functions!correctly.!
!
USEFUL!–!Useful!information!which!may!be!helpful,!but!is!not!necessarily!required!for!the!unit!to!
function!correctly.!
!
Typography'
This!manual!makes!use!of!different!typography!to!identify!different!types!of!information.!
!"#$%&'(!!!Key!words!and!phrases!!
(Round!Brackets)!Used!to!identify!a!button!on!the!digital!controller!!
[Square!Brackets]!A!parameter!on!the!digital!controller!
<Inequality!Symbols>!A!message/fault!code!displayed!on!the!digital!controller!
!
!
!
!
!
!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 6 / 35
!
'
Where'to'find'more'Information'
!
For!further!information!please!visit!the!Nexus!Valve!Website!at!the!following!URL:!
www.nexusvalve.com!
Alternatively,!please!contact!the!Nexus!Valve!offices!using!the!details!below:!
Phone:! ! 1-888-900-0947!
Email:! ! info@nexusvalve.com!
!
Equipment Overview
The!function!of!this!equipment!is!to!provide!a!means!of!dissolved!air!removal!from!the!water!used!in!sealed!
heating!and!cooling!systems.!!
This!equipment!is!not!designed!to!cope!with!sudden!losses!of!system!pressure!(e.g.!manual!
draining)!or!major!water!losses!(e.g.!large!leaks).!The!equipment!is!also!not!intended!to!be!used!
for!water!boosting!applications.!

!
www.nexusvalve.com
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 7 / 35
Principal'of'Operation'Vacuum'Deaerator'
The!following!schematic!shows!the!internal!arrangement!of!a!Vacuum!Deaerating!unit:!
Water!is!allowed!into!the!Vacuum!cylinder!through!a!safety!solenoid!(13),!a!pressure!reducing!valve!(14)!
and!a!special!variable!bypass!valve!(15).!
The!pressure!reducing!valve!(14)!is!used!to!limit!the!water!held!within!the!vacuum!cylinder!to!
approximately!18!PSI.!This!is!seen!as!the!first!pressure!step.!
When!the!vacuum!cylinder!is!full!and!registering!a!suitable!start!pressure!(8b)!the!pumps!(9a/9b)!activate.!
At!the!same!time!the!special!variable!bypass!valve!(15)!opens!fully!to!allow!the!cylinder!water!to!be!
completely!flushed!back!into!the!system!by!the!pumps!(9a/9b).!This!purge!cycle!ensures!that!the!
maximum!possible!amount!of!aerated!water!will!be!exposed!to!the!vacuum!process.!
After!the!vacuum!cylinder!has!been!refreshed,!the!variable!bypass!valve!(15)!restricts!the!flow!into!the!
vacuum!cylinder.!The!pumps!(9a/9b)!continue!to!draw!water!out!of!the!cylinder!and!create!a!vacuum!
within!the!cylinder.!The!pumps!(9a/9b)!then!stop!after!a!5!second!dwell!period.!!
The!vacuum!created!within!the!cylinder!is!eroded!by!the!incoming!water!through!the!variable!bypass!valve!
(15) at!a!low!flow!rate,!this!gently!increases!the!pressure!within!the!cylinder!and!forces!the!released!air
pocket!out!through!the!Automatic!Air!Vent!(AAV)!on!top!of!the!cylinder.
The!equipment!is!connected!to!the!main!system!via!2!isolation!valves!(7a/7b)!and!backflow!from!the!
system!is!prevent!by!a!non-return!valve!(10a).!

!
www.nexusvalve.com
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 8 / 35
Installation
This!unit!is!not!designed!to!be!installed!in!an!outdoor!environment.!The!unit!must!be!installed!in!a!
frost!free!environment,!away!from!precipitation!and!water!sprays/jets.!If!there!is!a!risk!of!
flooding,!the!unit!must!be!installed!on!a!raised!heavy!supporting!base.!
Please!refer!to!the!appropriate!datasheet!for!the!maximum!working!pressure!and!temperature!of!
the!pressurization!unit.!The!conditions!at!the!point!of!connection!to!the!system!must!not!exceed!
these!values.!
Unit'Capacity'
One!FPSD-250D!can!handle!a!system!up!to!39,625!gallons!of!system!volume.!Consult!factory!for!
Larger!volumes.!
Pipe'Connections'
Where!applicable,!to!avoid!damaging!the!float!valve,!the!mains!water!supply!pipe!must!be!flushed!
before!connection.!
Deaerating!connections!(2of)!to!the!return!header!must!be!made!in!the!horizontal!plane!to!
prevent!floating!or!heavy!debris!entering!the!pipework!to!this!equipment.!
ü ü!!û û!
All!pipe!connections!must!be!made!with!appropriate!jointing!compound/PTFE!tape.!
If!PTFE!tape!is!used,!care!must!be!taken!to!ensure!that!the!tape!does!not!obstruct!the!orifice!of!
the!fitting.!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 9 / 35
'
'
Typical'Installation'Diagram'Vacuum'Deaerator'
Install!PSD!unit!on!vibration!pad!or!4!rubber!isolator!pads!2!“!thick.!
!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 10 / 35
!
Floor Standing Clearance and Connection Requirements
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Reference!
Connection!
Size!
Notes!
(
)*'"+,(-.//+&"%./'(
0(1(23(
4567!)89(
-844:-6!84(
;!6(!4-<=>:>(
(6?+(@.%/"(.A(&.//+&"%./('?.B$C(D+(%/("?+(
'*'"+,(E+"BE/F(./("?+('B&"%./('%C+(.A("?+(
&%E&B$#"%./(@B,@G(
4./HE+"BE/(I#$I+'F(@E+''BE+(E+CB&%/J(
I#$I+'(#/C(K5L(I#$I+'(,B'"(/."(D+(B'+CG(
Minimum!20”!!
Minimum!6”!!
Minimum!31.5”!!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 11 / 35
'
Electrical'Power'Supply'
This!equipment!must!be!electrically!isolated!before!removing!the!covers.!Cables!connected!to!the!
volt!free!contacts!may!be!supplied!from!another!source!and!may!remain!live!after!the!unit!is!
isolated.!These!must!be!isolated!elsewhere.!
!
All!electrical!connections!must!be!carried!out!by!a!suitably!qualified!and!competent!person.!!
!
The!mains!power!supply!to!the!pressurization!unit!must!be!connected!into!the!fused!terminal!block!as!shown!
below:!
!
!
!
!
It!is!recommended!to!supply!power!to!the!Deaeration!unit!via!a!lockable!disconnect.!This!should!
be!installed!within!78”!of!the!equipment.!
!
This!equipment!can!be!damaged!by!the!high!voltages!produced!by!electrical!installation!testing!
equipment.!When!performing!electrical!installation!tests,!the!equipment!must!be!isolated!from!
the!supply.!
!
!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 12 / 35
'
'
Fault'Contacts'
There!are!3!volt!free!fault!contact!which!can!be!used!for!connection!to!a!BMS!system,!or!as!an!interlock.!There!is!
the!Common!Alarm!contact!on!terminals!1!&!2,!the!Sensor!Health!contact!on!terminals!3!&!4!and!the!Pump!
Health!contact!on!terminals!7!&!8.!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 13 / 35
!
'
Commissioning
It!is!highly!recommended!to!have!this!equipment!commissioned!by!a!trained!approved!
mechanical!contractor.!Any!damage!or!loss!incurred!through!incorrect!commissioning!by!an!
unapproved!contractor!will!not!be!covered!by!the!warranty.!
Pre-Commissioning'Checklist'
The!following!conditions!must!be!met!before!starting!the!commissioning!process.!Failure!to!meet!
these!conditions!may!result!in!injury!or!damage!to!the!equipment,!system!and!property.!
!
Equipment!is!located!in!a!frost!free!area,!away!from!precipitation!and!water!sprays/jets!
!
All!necessary!pipe/electrical!connections!have!been!made!to!a!satisfactory!standard!
!
The!temperature!and!pressure!at!the!point!of!connection!are!within!the!operating!limits!of!the!
equipment.!
The!heating/cooling!system!is!fitted!with!a!safety!relief!valve!and!appropriately!sized!expansion!vessel!
!
The!following!conditions!must!be!met!for!the!equipment!and!heating/cooling!system!to!function!
correctly.!If!these!conditions!have!not!been!met,!it!is!not!advisable!to!proceed!with!the!
commissioning!process.!
!
The!system!connection(s)!have!been!made!into!the!system!return!header/pump!suction!
!
It!is!advisable!to!fill!the!heating/cooling!system!prior!to!commissioning.!!
!
'

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 14 / 35
'
'
Controller'Overview'
!
The!following!image!shows!the!front!of!the!PSD!unit!digital!controller.!Four!buttons!are!provided!for!
programming,!and!an!LED!display!which!shows!scrolling!messages.!
!
!
When!the!controller!is!first!powered!up,!it!will!display!the!controller!version!number.!This!manual!
relates!to!controller!version!6.3.!If!the!controller!is!of!a!different!version,!there!may!be!differences!
in!the!menu!items!available.!
!
When!in!normal!operation,!the!controller!will!display!the!current!internal!pressure!of!the!unit.!If!a!fault!occurs,!
the!controller!will!display!a!fault!code!and!produce!an!audible!alarm.!
In!normal!operation,!the!functions!of!the!buttons!are!as!follows:!
Button!
Function!
Press!
Hold!
SET!
-!
Show!Current!System!Pressure!
MUTE!
Mute!Audible!Alarm!
Reset!Unit!
+!
-!
Enter!Programming!Menu!
-!
-!
-!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 15 / 35
!
'
Deaerator'Controller'Programming''
!
Do!not!alter!any!settings!without!first!understanding!the!implications!of!doing!so.!Incorrect!
settings!may!cause!damage!to!the!equipment,!system!or!property.!
!
To!enter!the!programming!menu,!hold!the!(+)!button!until!“enter!code”!appears!on!the!screen,!followed!by!
“0000”!with!a!flashing!cursor!after!the!first!digit.!
To!gain!access!to!the!programming!menu,!one!of!the!following!codes!must!be!entered:!
Customer!Code!is!most!commonly!used!for!setup.!
Customer!Code!
Standard!set!of!options!
2601!
Engineer!Code!
Extended!set!of!options!
4706!
!
To!enter!the!code,!change!the!first!digit!with!the!(+)!and!(-)!buttons,!then!press!(SET)!to!move!onto!the!next!
digit.!Repeat!for!all!digits,!then!once!the!correct!code!is!shown!on!the!display,!press!(SET)!to!enter!the!
programming!menu.!
Once!a!correct!code!has!been!entered,!the!first!option![START!PRESSURE]!will!appear!on!the!screen.!
Once!in!the!menu,!the!value!of!the!current!menu!item!can!be!changed!using!the!(+)!and!(-)!buttons.!Once!the!
current!value!has!been!set,!pressing!the!(SET)!button!will!move!on!to!the!next!option.!
It!is!not!possible!to!navigate!backwards!through!the!menu.!To!return!to!a!previous!setting!in!the!
menu,!press!the!(SET)!button!repeatedly!to!scroll!through!to!the!end!of!the!menu,!and!then!re-
enter!the!appropriate!code.!
If!the!controller!loses!power!while!in!the!programming!menu,!all!changes!made!will!be!erased.!To!
confirm!all!changes,!the!end!of!the!menu!must!be!reached,!and!the!“SAVING...”!message!must!be!
displayed.!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 16 / 35
!
The!table!below!gives!details!of!all!menu!items,!in!the!order!that!they!will!appear:!
#!
Menu!Item!
Function!
Default!Value!
1!
Start!Pressure!!
Internal!Safe!Pressure!Within!The!Vacuum!Cylinder!For!The!
Pumps!To!Start!Circulating!Water!
14!PSI!
2!
Stop!Pressure!!
Internal!Stop!Pressure!For!The!Pumps,!Required!Vacuum!
Pressure!
0!PSI!(LTHW!
Systems)!
-7!PSI!(CHW!
Systems)!
3!
Alarm!Pressure!!
Internal!High!Pressure!Alarm!Setting,!To!Activate!The!Slam-shut!
Solenoid!Valve!
58!PSI!
4!
Normal!Minutes!!
Normal!Interval!Between!Pump!Runs!(De-aeration)!
60!MINS!
5!
Turbo!Hours!
Running!Time!For!Turbo!Mode!Before!Returning!To!Normal!
168!HRS!
6!
Timeout!Minutes!!
Time!Limit!!For!Vacuum!Generation!Or!Restoration!Of!Internal!
Pressure!(Error!Checking)!!
10!MINS!
7!
Purge!Seconds!
Time!Setting!For!Water!To!Be!Re-circulated!Into!The!Main!
System,!Taking!A!Fresh!Sample!
20!SEC!
8!
Pump!Count!!
Pump!Activation!Counter!(Logging)!
-!
9!
Pump!Hours!!
Pump!Cumulative!Hours!Run!Counter!(Logging)!
-!
10!
Alarm!Count!!
Cumulative!Alarm!Counter!(Logging)!
-!
11!
Power!!
Interrupted!!
Cumulative!Power!Off!Counter!(Logging)!
-!
12!
Pump!Sense!
Disabling!this!option!will!stop!the!controller!from!monitoring!
the!pumps!and!generating!<PUMP!FAIL>!faults.!
It!is!not!recommended!to!disable!this!option.!Please!consult!
Technical!Support!before!doing!so.!
y!
13!
Turbo!Mode!
Activation!Option!For!Turbo!Mode!(Commissioning!Setup)!
Y!
14!
Service!!
12!Month!Service!Reminder!!
Y!
15!
ID!Number!
Protocol!ID!Number!
55!
!
If!using!the!customer!code,!the!menu!items!12!and!15!are!not!displayed.!!
!
The!above!settings!are!all!pre-programmed!in!the!factory!and!should!not!need!to!be!modified!on!
site!with!the!exception!of!the!‘Purge!Seconds’!setting!which!is!system!dependent.!If!these!settings!
appear!to!have!been!reset,!the!most!likely!cause!is!a!power!spike.!If!this!problem!persists,!a!power!
filter!may!be!required.!
Purge'Seconds'Reference'Times'
!
Main!System!Pressure!
Purge!Time!
14!to!42!PSI!
20!seconds!
43!to!87!PSI!
30!seconds!
87!to!145!PSI!
40!seconds!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 17 / 35
!
'
Hydraulic'Commissioning'
'
1-!Venting!the!Vacuum!Cylinder!
Check!the!red!cap!on!the!air!intake!preventer!is!finger!tight.!
Do!not!unscrew!the!red!cap!completely.!Inside!is!a!glass!bead!and!spring!that!prevent!air!being!drawn!
into!the!equipment!at!this!point.!Without!the!spring!and!the!beads!this!device!will!not!function!correctly!
and!the!equipment!as!a!whole!will!be!unusable.!
With!the!equipment!electrically!powered!down!remove!the!coil!from!the!two!Inlet!solenoids!
!
!
Be!careful!not!to!mix!up!the!coils!when!disconnected.!Failure!to!pair!the!correct!coil!with!the!correct!
valve!will!stop!the!unit!from!working.!
With!the!coils!disconnected!use!a!pair!of!Danfoss!override!magnets!(018F0091!Danfoss!part!number)!to!
manually!open!both!of!the!solenoid!valves.!This!allows!the!existing!system!pressure!to!fill!the!vacuum!cylinder!
for!the!first!run.!
Remove!the!override!magnets,!return!the!correct!coil!to!the!correct!valve!and!electrically!switch!the!unit!on.!If!
the!pressure!shown!on!the!de-aerator!display!is!below!the!start!pressure!of!the!equipment!it!may!be!necessary!
to!adjust!the!pressure!reducing!valve!in!between!the!two!inlet!solenoids.!A!setting!on!the!pressure!reducing!
valve!2!to!4!PSI!higher!than!the!start!pressure!is!acceptable,!any!lower!than!this!and!the!equipment!may!become!
intermittent!in!operation.!

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 18 / 35
!
If!the!Danfoss!magnets!are!not!available!then!it!is!possible!to!vent!the!cylinder!through!the!
internal!0.04”!/!1mm!bypass,!although!this!may!take!a!considerable!amount!of!time.!The!
alternative!to!this!is!to!temporarily!put!live!power!directly!to!the!solenoid!coils!to!force!the!valves!
to!open.!
2-!Bleeding!the!Pumps!(if!required)!
Locate!the!bleed!screw!on!the!pump.!The!following!diagrams!show!examples!of!typical!bleed!screw!locations!for!
most!pumps:!
!
!
!
Do!not!use!excessive!force!when!tightening!the!bleed!screw!as!this!may!damage!the!pump!casing.!
!
If!the!pump!has!a!plastic!bleed!screw!like!the!one!shown!below,!do!not!use!excessive!force!or!
attempt!to!use!any!tools!to!turn!it!as!this!may!irreparably!damage!the!pump!casing.!
!

!
www.nexusvalve.com
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 19 / 35
Operation
Once!commissioned,!the!Deaerating!unit!should!operate!without!any!user!intervention.!
For'practical'guidance'on'diagnosing'and'rectifying'faults,'please'refer'to'the'
Troubleshooting'section'of'this'manual.'
Deaerating'Fault'Codes'
Fault!Code!
Description!
Auto/Manual!
Reset!
Error
Incorrect password (Code) entered.
Auto!Reset!
High Pressure
High system pressure, audible alarm sounds. The Safety
Solenoid closes. This alarm will self-reset when the system
pressure returns to normal, audible alarm can be silenced by
pressing “mute”.
Auto!Reset!
Insufficient Vacuum
The low water switch has been activated, either a leak has
occurred or the air non return valve has failed or is missing.
Manual!Reset!
Pump FAIL
Pumps have failed, the pump failure relay closes. The boiler
interlock opens, the audible alarm sounds.
Manual!Reset!
Timeout
Either the pumps have run for too long or the pressure has
not reached the required start pressure for the pump within
the time limit.
Check the internal filter on the PRV and the solenoid valves
for obstruction.
Manual!Reset!
Service
The unit has been in service for 12 months and a routine
inspection is due (User option in menu).
Manual!Reset!
Shutdown!Procedure!
The!deaeration!unit!must!be!shut-down!during!any!of!the!following!scenarios:!
•Work!is!being!carried!out!on!the!system.
•Work!is!being!carried!out!on!the!Deaerating!unit.
•The!heating/cooling!system!is!being!flushed.
To!shut!down!the!equipment,!please!follow!the!steps!below:!
1. Isolate!the!electrical!power!supply!to!the!unit.
2. Isolate!the!unit!from!the!system!using!the!isolation!valves.

!
!
! !
!
!
www.nexusvalve.com
!
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products.
Rev 4.0 Mar-16 Page 20 / 35
!
Start-Up!Procedure!
Attention!–!This!procedure!is!for!restarting!the!unit!after!being!shutdown!(as!described!above).!
For!initial!start-up!and!commissioning!procedures,!please!refer!to!the!Commissioning!section!of!
this!manual.!
!
To!restart!the!unit,!please!follow!the!steps!below:!
1. Perform!a!visual!inspection!of!the!unit!and!installation!to!check!for!signs!of!damage.!
2. Open!the!isolation!valves.!
3. Turn!on!the!mains!power!supply!and!wait!for!the!controller!to!start.!
4. Depending!on!the!conditions!in!the!system,!the!unit!may!display!one!or!more!fault!codes!at!this!point.!If!
this!happens,!please!refer!to!the!Troubleshooting!section!of!this!manual!for!guidance.!
!