
For Home Owners
General
3
Installation data 3
Information about the installation
Product information 4
Features of NIBE SPLIT 4
Principle of operation NIBE SPLIT 4
Front panel, indoor module
How to use the front panel 6
Menu types 6
Quick movement 6
Key lock 6
Comfort setting heating
General 7
Operating status 7
Changing the room temperature manually 7
Default setting 8
Readjusting the default settings 9
Comfort setting cooling
General 10
Cooling operated from the outdoor sensor in operating
mode AutoK 10
Controlling cooling mode using the room sensor 10
Comfort setting hot water
Available volume 11
Prioritizing 11
Extra Hot Water 11
Maintenance
Checking the safety valves 13
Pressure gauge in HE 30, HEV 300, HEV 500 13
Emptying the coil in the water heater 14
Emptying the vessel 14
Maintenance of AMS 10 14
Saving tips 14
Dealing with comfort disruption
Operating mode "Add. heat only" 16
Emergency mode 16
Alarm indications
What happens in the event of an alarm? 17
Recommended actions 17
Acknowledging alarms 17
For the Installer
General information for the installer
Transport and storage 18
Supplied components 18
Assembly 19
Dimensioning expansion vessel 19
Manual shunting 20
Emptying the vessel 20
Recommended installation order 20
Pipe installation
General 21
System requirements 21
Dimensions and pipe connections 21
Pump capacity diagram 22
Connecting HBS 12 to tank 22
Connecting the climate system 23
Connecting the hot water heater 23
Connection of external heat source 24
Waste exchanger part 24
Connecting refrigerant pipes (not supplied) 24
Dockings 27
Electrical installation
General 32
Electrical components 32
Connecting the supply 34
Miniature circuit-breaker 34
Temperature limiter 34
Connection between HBS 12 and AMS 10-8/AMS 10-
12 34
Connection between HBS 12 and HE 30, HEV 300, HEV
500 35
Setting max power, electrical addition 36
Setting max boiler temperature 36
EBV board, terminal and wiring diagram 36
Connecting the outside sensor 36
Connecting the temperature sensor hot water char-
ging 36
Connecting the current limiter 36
Connection of centralised load control/tariff 37
Connecting external contacts 37
Alarm outputs 37
Docking specific connection 37
Start-up and inspection
Preparations 39
Commissioning 39
Setting system flow heating 40
Setting system flow cooling 40
Commissioning HBS 12 without AMS 10-8/AMS 10-12 con-
nected 40
Checking external addition with internal immersion heater
blocked 40
Checking external addition (not controlled by HBS 12) with
internal immersion heater as backup 40
Inspection of the installation 40
Cleaning the particle filter 40
Secondary adjustment 41
Checklist: Checks before commissioning 42
Miscellaneous
Control
Display 43
Menu types 43
Menu management 43
Menu tree 44
1NIBE™ SPLIT
Table of Contents