
DETAIL A
SCALE 1 / 10
A
HARDWARE & TOOLS
REQUIRED
-PVA GLUE
-MALLET
-CLAMPS & RACHET STRAPS
1. PARTS
3. GLUE SIDES ANDHORIZONTAL SHELVES
2. GLUE LOCK INSERT AND THEN FIT THE
VERTICAL PANEL INTO BACK PANEL.
5. MAKE PILOT HOLES AND SCREW THE
WHEELS IN PLACE
4. FIT DOORS AND GLUE THE TOP AND BASE
PANELS INTO POSITION, STRAP EVERYTHING
UNTIL DRY
6. FINISHED.
PRODUCT: KANO STORAGE (MEDIUM)
RANGE: VYNE
DESIGNERS: VYNE TEAM
PUBLISHED: 07/08/2017
PRODUCT VERSION: 1_0_0
PRODUCT ASSEMBLY
INSTRUCTIONS