Raising Standards
Safety Assured
INSTALLATION TIPS
z
Connectors on Satellite PCB can be daisy chained to other Satellite panels, or wired back to the hub.
– Max 2 Satellites connected Star configuration (max 300m per spur)
AND/OR Daisy configuration (max 300m in total)
z
Each Satellite panel will be numbers 1 – 2.
– Please ensure each system does not include identical panel numbers.
z
Recommended to use 8 Core CAT 5 cable:
– Twisted Pair x 2 Mic
– Twisted Pair x 2 Speaker
– Twisted Pair x 2 CAN
– Twisted Pair x 2 Power
EU CE Declaration of Conformity and Radio Equipment Directive is available at www.commtel-uk.com | GB-RH10 9XN
OPT_KIT_IG_ISSUE 1_08.20
OPTIMUS KIT INSTALLATION GUIDE
!
TELGUARD POWER SUPPLY UNITS MUST BE USED AND SHOULD NOT POWER ANY OTHER EQUIPMENT.
A SITE SIGNAL NETWORK TEST IS TO BE UNDERTAKEN BEFORE INSTALLATION
CONFIGURATION EXAMPLE:
PEDESTRIAN GATE
GATE
CONTROL
BOX
HUB
MAIN GATE