
IG-078-EN version 12; 23/04/2020 3
General Instructions
cgmcosmos: Medium-voltage cubicles with full insulation
in SF6gas up to 24 kV in accordance with IEC Standard
Contents
Contents
1. General description ..................................................5
1.1. Models ......................................5
1.2. Standards applied............................6
1.3. Main components ...........................7
1.3.1. Gas tank .....................................8
1.3.2. Driving mechanism compartment ............8
1.3.3. Base .........................................9
1.3.4. Name plate .................................10
1.4. Electrical specifications......................11
1.5. Dimensions and weights ....................12
1.6. Operating conditions .......................14
2. Handling and transport...........................................15
2.1. Lifting means ...............................15
3. Storage......................................................................17
4. Installation ...............................................................18
4.1. Unpacking the equipment ..................18
4.2. Positioning accessories during transport.....18
4.3. Minimum installation distances..............20
4.4. Recommended cable connection trenches...20
4.4.1. Cubicles with internal arc in tank up to
20 kA - 0.5 s .................................21
4.4.2. Cubicles with IAC internal arc classification
up to 25 kA - 1 s.............................25
4.5. Floor fastening .............................31
4.5.1. Floor fastening on profile ...................31
4.5.2. Fastening to the floor by anchoring..........32
4.6. Connecting the cubicles.....................39
4.7. Earthing the switchgear .....................39
4.8. Cable connections ..........................40
4.8.1. Horizontal front connection .................42
4.9. Vertical front connection ....................44
4.10. Assembling and connecting metering
transformers in cgmcosmos-m..............48
4.11. Assembling and connecting metering
transformers in cgmcosmos-m-pt ...........48
4.12. Assembling and connecting metering
and auxiliary services transformers in
cgmcosmos-ma ............................48
5. Recommended sequence of operations.................49
5.1. Checking the gas pressure ..................49
5.2. Live voltage indicator .......................50
5.3. Phase concordance check ...................51
5.4. Feeder function .............................52
5.4.1. Mimic diagram..............................52
5.4.2. Actuating levers ............................52
5.4.3. Opening operation from earthing position...53
5.4.4. Switch closing operation from isolating
position ....................................54
5.4.5. Opening operation from closed position.....55
5.4.6. Earthing operation from open position ......56
5.4.7. Cable test...................................57
5.5. Busbar switch function ......................58
5.5.1. Mimic diagram..............................58
5.5.2. Actuating levers ............................58
5.5.3. Switch closing operation from isolating
position ....................................59
5.5.4. Opening operation from closed position.....60
5.6. Busbar switch function with earth
connection .................................61
5.6.1. Mimic diagram..............................61
5.6.2. Actuating levers ............................61
5.6.3. Opening operation from earthing position...62
5.6.4. Switch-disconnector closing operation
from isolating position ......................63
5.6.5. Opening operation from closed position.....64
5.6.6. Earthing operation from open position ......65
5.7. Busbar rise function with earth connection ..66
5.7.1. Mimic diagram..............................66
5.7.2. Actuating lever .............................66
5.7.3. Earthing switch opening operation ..........67
5.7.4. Earthing switch connection operation .......68
5.8. Fuse protection function with BR driving
mechanism .................................69
5.8.1. Mimic diagram..............................69
5.8.2. Actuating lever .............................70
5.8.3. Opening operation from earthing position...71
5.8.4. Switch-disconnector closing operation from
isolating position and spring charge .........72
5.8.5. Opening operation from closed position.....73
5.8.6. Earthing operation from open position ......74
5.9. Fuse protection function with AR driving
mechanism .................................75
5.9.1. Mimic diagram..............................75
5.9.2. Actuating levers ............................76
5.9.3. Opening operation from earthing position...76
5.9.4. Spring charge operation and closing of the
switch from isolating position ...............77
5.9.5. Opening operation from closed position.....77
5.9.6. Earthing operation from open position ......78
5.10. Fuse replacement sequence .................79
5.10.1. Selection of recommended fuses ............83
5.11. Circuit-breaker function with AV/RAV driving
mechanism .................................84
5.11.1. Mimic diagram..............................84
5.11.2. Spring charge and actuating levers ..........85
5.11.3. Opening operation from earthing position...85
5.11.4. Closing operation from isolating position ....87
5.11.5. Opening operation from closed position.....90
5.11.6. Earthing operation from open position ......92