2. Connect the CPS to a True Broadband Network (TBN)
Procedure
1. Determine the wpe of CPS bcing uscd. Depending on the r-er:iun,
dilferent patch cables are uscd. (See legencl at the end of this scction).
LJsing the appropriate cablc, connccting the CPS port labelled "UpJink"
(see Figure 3) to -i,our Ethernct broadband net§,ork outlet. Push the cablc
connector gendv but frrmlv into thc port until the Iatch engages.
2. You lLaLe ronpletel thh prorcdrre.
Patch cable legend
CPS 218C TP u-ith RJ ,15 connectors.
CPS 229FlI 1 Pair 1310 nm, multimode flbre s,ith NIT-RJ connector.
CPS 239FV 1 Pair 1310nm, multimode fibre s.ith VF--45 VoLition coflflector.
CPS 249SFV 1 Pair 850 nm, singlemode flbre rvith VF'-45 connector.
CPS 259SFNf 1 Pair 1310nm, singlemocle fibre rvith \{T-Rj conncctor.
CPS 269SFNf 1 single 1310nm/1520mm, singlemode fibre u.tth S(l conncctor.
CPS 279SFN{ 1 Pair 1310nm, singlemocle fible rvith LC conncctor.
Figure 3. Uplink on the Customer Premises Switch CPS 239FV
Note:
The figrurc shou,s thc CPS 239F\i Othcr modcis harc diffcrcnt port tvpes. Iil rnoclels hale
9 ports, cxccpt thc CPS 218C thich has 8 ports including Uplink. On thc CPS 218C, thc
first Rl45 10/1()0BascTX port is mårl(cd "Uplink"l