238 Installation Guide
ORION FIREPIT
ORION FIREPIT INSTALLATION
ORION FIREPIT UNITS
> Prepare the installation area by referring to the slab installation portion of the
Permacon installation guide
> Ensure the base is level prior to installation
> Install the Orion concrete units in desired location
- Install the units on the ground in a square shape. Make sure every unit is used once
as a corner
- Once the first row is complete, apply Techniseal concrete adhesive on top of the units
- For the second row, offset the corners to avoid vertical joint lines
- Apply Techniseal concrete adhesive on top of the second row of units
- For the third row, offset the corners once again so they have the same vertical joints
as the first row
> If the firepit is in an area with slabs or pavers, install them around the firepit and cut
where necessary
METAL INSERT
All the necessary tools for the following steps, such as a hex key and a flat key, are provided in the nuts-and-bolts bag.
Assemble a corner to a panel using the supplied nuts-and-bolts. The corner goes on the outside of the panel. The bolts
should point to the inside of the firepit and the nuts go inside the firepit.
1
CAUTION !
Orion units must be turned on their
side once removed from the skid.
The spacers should face the ground.