The Fireplace JETMASTER 700 D User manual

3.OD.3A
ALL INSTRUCTIONS TO COMPLY WITH AS/NZS2918:2001
Due to continued product improvement, The Fireplace Ltd reserves the right to change product specications without prior notication
instructiOns ArE fOr instAllAtiOn intO A cOmplEtE mAsOnry firEplAcE cOnstructiOn i.E:
cAvity AnD chimnEy chAsE (nO cOmBustiBlEs)
Masonry Denition: - Solid Concrete
- Concrete/Masonry Block
- Brick
- Hebel Block/Panel
Consult The Fireplace Ltd or your local agent for any variation of the installation specied below
nOtE: If using timber framing, refer to 5.TW.1A for installation instructions. A Heat Shield must be used.
JETMASTER OUTDOOR WOOD FIRE & ALFRESCO BBQ
INSTALLATION INSTRUCTIONS TYPICAL IN-BUILT MASONRY BLOCK
9/2013
IMPORTANT: Read all instructions carefully before starting installation. Failure to follow these
instructions may result in a fire hazard and will void the warranty.

3.OD.3B
cAvity / frAminG prEpArAtiOn
MODEL A A1 B C D E F Y
700 D 700 800 400 700 225/325 200 680 295
850L 850 950 450 700 250/350 220 680 322
1050LL 1050 1150 500 700 300/400 240 680 345
D
C
A1
A
B
F
E
Gather
Front Back
Gather
Y
Table 1
Fig. 2
JEtmAstEr BOX DimEnsiOns
Drawings Not To Scale
Dimensions in mm
Fig. 1
firEBOX instAllAtiOn
1. Locate and position rebox, t and seal gather in cavity using re cement (exhaust cement) and bolts
(supplied), to the rebox. Note: Pop rivet back of gather to rebox if required (refer to Cross Section).
Earthquake restraints may be positioned by drilling through rebox into the oor protector, in a position
midway beneath the log-pan. Two 6mm dynabolts or similar will sufce. Do not over tighten and deform
rebox.
2. Attach rock wool (supplied) to the sides of the rebox and gather (using re cement). DO NOT BLOCK
OFF the air entry between the inner ue pipe and ue pipe casing or the air circulation between the vent
holes in the cavity.
3. Refer to Table 2 & Fig 3 for minimum hearth sizes. Please note, a hearth is not required when the oor
surface below the re is non combustible ie: concrete pavers, etc.
Table 2
minimum cAvity siZE
Refer to Table 2 for the minimum cavity dimensions and temporary lintel height measurements, until the
rebox and ue system is installed. Note: Temporary lintel height is measured from nished oor protector
level.
Note: Wood Installations can be converted to Gas at a later date. Consider running a gas supply to rebox
cavity at the time of construction.
Dimensions in mm
NOTE: Minimum Recess = 40mm / Maximum Recess = 100mm
ALL INSTALLATIONS MUST COMPLY WITH NZS2918:2001
The Fireplace Ltd recommends all installations be carried out by an
S.F.A.I.T (SOLID FUEL AUTHORISED INSTALLER TECHNICIAN).
MODEL A B + recess Temporary
Lintel X min* Y min* Z min*
700 D 800 470 + recess 1200 1100 400 75
850L 950 530 + recess 1200 1250 450 75
1050LL 1150 565 + recess 1200 1450 600 75

3.OD.3c
crOss sEctiOn
min. 25mm clearance 25
25 min. 25mm clearance
B + recessed
Masonry or Hebel block
minimum ‘A’
‘X’ - Refer to Table 2 for Floor Protector dimension
Allow gas line into
firebox (if applicable)
RECESS REQUIRED (40mm Min. 100mm Max)
‘Y’ - Refer to Table 2 for
Floor Protector dimension
Air Vent Air Vent
min. 2 x 100 x 50mm or 80mm diam
wall of floor mounted air vents
100
Flue pipe casing
recommended
S/S Flue pipe
Rock-wool
insulation
(Glue rock-wool
using fire cement
to the firebox and
gather)
B + recessed
Secure firebox with 2 x 6mm
dynabolts for earthquake
restraints
Maintain the air intake
unobstructed
Concrete Lintel
or Hebel Block
Rock-wool
insulation
Allow 5mm gap around all
four sides of the firebox to
fit Stainless Steel cover &
allow for firebox expansion
RECESSED REQUIRED
40mm Min. - 100mm Max recess
IMPORTANT
No combustible material into chimney chase
Refer Table 2. for temporary lintel height
Jetmaster
Flange
Allow 5mm gap between plaster and flange to
ensure stainless steel cover can be fitted to the box.
DO NOT PLASTER OVER THE FLANGE
* A minimum 75mm thick Floor protector is only required if nished surface is combustible e.g: timber
decking
Please note that these dimensions (based on Masonry margins) are the absolute minimum sizes - widths
(A & B) maybe increased if desired. If you intend on recessing the rebox, please add the recess value to
Dimension ‘B’. MINIMUM RECESS = 40 / MAXIMUM RECESS = 100mm
It is important to ensure the Jetmaster rebox is seated at the required nished oor protector level.
WArninG: Minimum cavity sizes leave NO MARGIN FOR ERROR. If the cavity is larger than minimum
dimensions (A & B) close up the lateral sides (see Fig. 3) using hebel block, concrete block or similar
(do not use any combustible material).
AllOW 5mm GAp ArOunD All fOur siDEs Of thE firEBOX tO fit stAinlEss stEEl WEAthEr
COVER, i.e. do not plaster up to the ange of the rebox, see Fig 5.
Drawing Not To Scale
Fig. 4 Fig. 5
plAn
Drawings Not To Scale
Fig. 3

3.OD.3D
Air Ventilation Through Chimney Chase Air Ventilation Through Top Flashing
Drawings Not To Scale
chimnEy chAsE Air vEntilAtiOn
Fig. 5 Fig. 6
50 25
25
120mm
minimum
Drip
Line
Spigot flashing to suit
flue pipe casing
Non combustible material
Hebel Block or 12mm
Promina board or similar
under the flashing
120mm
minimum
Oversized casing cover
is necessary
Drip
Line
Air
Vent
NOTE: Air Vents to be min 2 x 80mm diam. or equal square or rectangle shape
area. These must be bird & rodent proofed with permanently fixed screens.
1. Install rst length of ue pipe crimped end down, inside gather collar. Rivet ue pipe in 3 places around
gather collar. Place bottom ue spider bracket around gather ue pipe collar, secure in position by
tightening up coach bolt/screw (supplied).
2. Install second length of the ue pipe crimped end down and x by riveting in at least 3 places around the
ue pipe joint.
3. Install rst length of the ue pipe casing by positioning on installed bottom ue spider bracket crimped
end up.
4. Position ue spacer at the ue pipe joint.
5. Repeat steps 1 - 4 to the required ue system height of 3.6m.
6. The last length of ue pipe needs to extend past the ue pipe casing by at least 150mm or ush with the
top of the casing cover spigot when tted - sizing/measuring and cutting down should be carried out prior
to the ue pipe casing being tted over the ue pipe.
6. Before tting casing cover, place the spider in opposition with the spider post facing down between the
ue pipe and ue pipe casing. Secure spider in position. Place the casing cover over the ue pipe, press
down rmly onto the spider. Check airway around the casing cover is clear, then secure in position using
three stainless steel rivets.
7. Fit cowl to top of ue - DO NOT RIVET IN POSITION. In high wind areas, it is recommended that the cowl
be secured in position with a stainless steel self tapping screw, this will enable the cowl to be removed for
cleaning. Discuss Bird Proong needs with your installer. N.B. in extreme wind areas it may be necessary
to consult The Fireplace Ltd or your local agent for further technical assistance Ph: 0800 843 347.
8. If ue is concealed in a chase, allow for air vents (2 x 80mm diam. or equivalent) at the highest possible
point on the chimney chase or alternatively, allow a min 25mm air space between the casing cover spigot
and the outer casing. Refer to Figure 5 & 6.
fluE instAllAtiOn
GEnErAl mAintEnAncE
▪ When the fire is not in use, ensure the stainless steel cover is fitted at all times. This will assist in protecting the
firebox. DO NOT attach the cover when the fire is in use.
▪This fire is NOT warranted against rust. Please refer to our full Warranty Card for full details.
▪ A seasonal touch-up is recommended. Simply remove surface rust with some steel wool and repaint using Black VHT
paint (available from your nearest showroom). Please ensure all areas around the firebox are protected when re-painting.
This manual suits for next models
2
Other The Fireplace Outdoor Fireplace manuals
Popular Outdoor Fireplace manuals by other brands

Superior
Superior VRE4543EN Installation and operation instructions

Napoleon
Napoleon PATIOFLAME GPFN Installation and operation instructions

Endless Summer
Endless Summer Dakota GAD19101ES owner's manual

Vermont Castings
Vermont Castings ODGSR36A Homeowner's installation and operating manual

FEUERHAND
FEUERHAND PYRON user manual

California Outdoor Concepts
California Outdoor Concepts Carmel Chat Product information manual